Summary
Overview
Work History
Education
Skills
Timeline
Generic
SRIJAN SINGH

SRIJAN SINGH

Jaunpur

Summary

To work for a progressive organization in a-highlymotivating and challenging environment that provides the best opportunities to growand utilize my potential to the fullest to-achieve the organization's goal whileachieving my personal goals.

Overview

9
9
years of professional experience

Work History

CCM Production Department

Vardhman Ispat Pvt. Ltd
Mandi Gobindgarh
07.2023 - 04.2025
  • Worked in the maintenance team of CCM (Continuous Casting Machine) department.

    Helped keep the plant running smoothly by reporting problems on time

    Sent electrician to fix faults and get spare parts changed when needed

    During shutdown, checked all machines for cleaning, loose connections, and proper working

    Focus was on keeping machines in good condition and avoiding breakdown

Erection Department

Vardhman Ispat Pvt. Ltd
Mandi Gobindgarh
03.2023 - 06.2023
  • Assisted in cable erection work by following electrical drawings in CCM section

    Key Responsibilities:
    – Connected cables to panels at specified locations
    – Installed cable ferrules and applied proper wire numbering
    – Ensured accurate cable termination based on panel diagrams
    – Got all motor connections done as per drawings

CCM Production Department

Fortune Metals Pvt. Ltd
Mandi Gobindgarh
11.2022 - 02.2023
  • Worked in the maintenance team of CCM (Continuous Casting Machine) department.

    Helped keep the plant running smoothly by reporting problems on time

    Sent electrician to fix faults and get spare parts changed when needed

    During shutdown, checked all machines for cleaning, loose connections, and proper working

    Focus was on keeping machines in good condition and avoiding breakdown

Production Department

Renny strips pvt ltd
Ludhiana
07.2022 - 10.2022
  • Worked in the Production & Electrical Maintenance Department to support smooth plant operations

    Supervised daily work of support staff including fitters, electricians, welders, pump operators, and helpers

    Sent maintenance team to handle machine faults during running operations

    During plant shutdowns, ensured proper cleaning, greasing, oiling, and routine checking of all machines, motors, cranes, and control panels

    Checked and ensured proper tightness and connections of all electrical equipment

    Operated VCB breakers in the LT room to control 11kV power supply

    Monitored important transformer parameters like oil temperature, winding temperature, and basic power readings (KW, KVAH)

    Arranged spare parts quickly in case of breakdowns and ensured fast machine restart to reduce downtime

Erection Department

Renny Strips Pvt. Ltd
Ludhiana
11.2021 - 06.2022
  • Assisted in cable erection work by following electrical drawings across different plant sections such as Furnace, Poker, Air Pollution Control Unit, Pump House, and CCM.
    Key responsibilities:

    – Installed LT and HT cables as per site drawings
    – Connected cables to panels at specified locations
    – Installed cable ferrules and applied proper wire numbering
    – Ensured accurate cable termination based on panel diagrams

Production Line Assembly Worker

Nippon Audiotronix Pvt. Ltd.
Gurugram
12.2018 - 11.2020
  • Assembled car sensors and controller units on the production line

    Performed system-based flashing checks to verify controller programming

    Installed and fixed brackets on sensor assemblies

    Checked quality of sensors and controllers for scratches, dents, paint issues and other defects

Summer Training Intern

UPPCL 400KV
Sultanpur,Uttar Pradesh
07.2016 - 08.2016
  • I completed a 4-week training at UPPCL, Sultanpur. I learned about power distribution, substation equipment, and safety systems.
    Got real experience by observing field work and technical processes.

Education

DIPLOMA. - BTEUP

Government Polytechnic
Kanpur, Uttar Pradesh, India
01.2017

Class X - CBSE

MDJV School
Jaunpur, Uttar Pradesh, India
01.2012

Skills

  • MS Office
  • Excel
  • PLC & SCADA
  • Safety regulations
  • Team collaboration
  • Time management
  • Computer skills
  • Machine operation

Timeline

CCM Production Department

Vardhman Ispat Pvt. Ltd
07.2023 - 04.2025

Erection Department

Vardhman Ispat Pvt. Ltd
03.2023 - 06.2023

CCM Production Department

Fortune Metals Pvt. Ltd
11.2022 - 02.2023

Production Department

Renny strips pvt ltd
07.2022 - 10.2022

Erection Department

Renny Strips Pvt. Ltd
11.2021 - 06.2022

Production Line Assembly Worker

Nippon Audiotronix Pvt. Ltd.
12.2018 - 11.2020

Summer Training Intern

UPPCL 400KV
07.2016 - 08.2016

DIPLOMA. - BTEUP

Government Polytechnic

Class X - CBSE

MDJV School
SRIJAN SINGH