To work for a progressive organization in a-highlymotivating and challenging environment that provides the best opportunities to growand utilize my potential to the fullest to-achieve the organization's goal whileachieving my personal goals.
Overview
9
9
years of professional experience
Work History
CCM Production Department
Vardhman Ispat Pvt. Ltd
Mandi Gobindgarh
07.2023 - 04.2025
Worked in the maintenance team of CCM (Continuous Casting Machine) department.
Helped keep the plant running smoothly by reporting problems on time
Sent electrician to fix faults and get spare parts changed when needed
During shutdown, checked all machines for cleaning, loose connections, and proper working
Focus was on keeping machines in good condition and avoiding breakdown
Erection Department
Vardhman Ispat Pvt. Ltd
Mandi Gobindgarh
03.2023 - 06.2023
Assisted in cable erection work by following electrical drawings in CCM section
Key Responsibilities:
– Connected cables to panels at specified locations
– Installed cable ferrules and applied proper wire numbering
– Ensured accurate cable termination based on panel diagrams
– Got all motor connections done as per drawings
CCM Production Department
Fortune Metals Pvt. Ltd
Mandi Gobindgarh
11.2022 - 02.2023
Worked in the maintenance team of CCM (Continuous Casting Machine) department.
Helped keep the plant running smoothly by reporting problems on time
Sent electrician to fix faults and get spare parts changed when needed
During shutdown, checked all machines for cleaning, loose connections, and proper working
Focus was on keeping machines in good condition and avoiding breakdown
Production Department
Renny strips pvt ltd
Ludhiana
07.2022 - 10.2022
Worked in the Production & Electrical Maintenance Department to support smooth plant operations
Supervised daily work of support staff including fitters, electricians, welders, pump operators, and helpers
Sent maintenance team to handle machine faults during running operations
During plant shutdowns, ensured proper cleaning, greasing, oiling, and routine checking of all machines, motors, cranes, and control panels
Checked and ensured proper tightness and connections of all electrical equipment
Operated VCB breakers in the LT room to control 11kV power supply
Monitored important transformer parameters like oil temperature, winding temperature, and basic power readings (KW, KVAH)
Arranged spare parts quickly in case of breakdowns and ensured fast machine restart to reduce downtime
Erection Department
Renny Strips Pvt. Ltd
Ludhiana
11.2021 - 06.2022
Assisted in cable erection work by following electrical drawings across different plant sections such as Furnace, Poker, Air Pollution Control Unit, Pump House, and CCM.
Key responsibilities:
– Installed LT and HT cables as per site drawings
– Connected cables to panels at specified locations
– Installed cable ferrules and applied proper wire numbering
– Ensured accurate cable termination based on panel diagrams
Production Line Assembly Worker
Nippon Audiotronix Pvt. Ltd.
Gurugram
12.2018 - 11.2020
Assembled car sensors and controller units on the production line
Performed system-based flashing checks to verify controller programming
Installed and fixed brackets on sensor assemblies
Checked quality of sensors and controllers for scratches, dents, paint issues and other defects
Summer Training Intern
UPPCL 400KV
Sultanpur,Uttar Pradesh
07.2016 - 08.2016
I completed a 4-week training at UPPCL, Sultanpur. I learned about power distribution, substation equipment, and safety systems.
Got real experience by observing field work and technical processes.