Summary
Overview
Work History
Education
Skills
Certification
Disclaimer
Present Roles and Responsibilities
Managerial Skill(Maintenance)
Timeline
Generic

Srikanta Kumar Biswal

Cuttack,KA

Summary

Innovative technology professional with several years of diverse experience. Skilled in enhancing systems and aligning technical solutions with business objectives. Proven success in leading projects from start to finish and contributing to organizational growth and success.

Overview

22
22
years of professional experience
1
1
Certification

Work History

DGM

M/s. SHREE ELSOFT
04.2024 - Current
  • Company Overview: Electrical Contractor, panel manufacturer, testing and Automation works
  • Responsible for maintenance of SID & RMHS for electrical & instrumentation system.
  • Duration: 1 Year

AGM

M/s. AARTI STEELS LTD (steel & power)
04.2023 - 03.2024
  • Responsible for maintenance of SID & RMHS for electrical & instrumentation system.
  • Duration: 1 year

Sr. Manager

M/s. AARTI STEELS LTD (steel & power)
04.2018 - 03.2023
  • Responsible for maintenance of SID & RMHS for electrical & instrumentation system.
  • Duration: 5 years

Manager

M/s. AARTI STEELS LTD (steel & power)
06.2016 - 03.2018
  • Responsible for maintenance of SID & RMHS for electrical & instrumentation system.
  • Duration: 1yr 6 month

AGM(HOD)

M/s. S.K.S.ISPAT & POWER LIMITED
04.2016 - 06.2016
  • Responsible for maintenance SID & RMHS for electrical & instrumentation system.
  • Duration: 3 months

Sr. Manager (HOD)

M/s. S.K.S.ISPAT & POWER LIMITED
04.2013 - 03.2016
  • Responsible for maintenance SID & RMHS for electrical & instrumentation system.
  • Duration: 3yrs

Manager

M/s. S.K.S.ISPAT & POWER LIMITED
10.2011 - 03.2013
  • Responsible for maintenance SID & RMHS for electrical & instrumentation system.
  • Duration: 1.5yrs

Sr. Engineer

M/s. AARTI STEEL LIMITED (STEEL & POWER)
04.2008 - 09.2011
  • Responsible for maintenance of SID & RMHS for electrical & instrumentation system.
  • Duration: 3.5yrs

Engineer

M/s. AARTI STEEL LIMITED (STEEL & POWER)
10.2006 - 03.2008
  • Responsible for maintenance of SID & RMHS for electrical & instrumentation system.
  • Duration: 1.5yrs

ASST. Engineer

M/s. AARTI STEEL LIMITED (STEEL & POWER)
09.2005 - 09.2006
  • Responsible for maintenance of SID & RMHS for electrical & instrumentation system.
  • Duration: 1 yr

ASST. Engineer

M/s Joy Balaji Sponge Ltd
01.2004 - 09.2005
  • Electrical Maintenance of (50
  • 7) TPD Rotary kiln & ESP
  • Duration: 1yr 8 month

GET

M/s Joy Balaji Sponge Ltd
01.2003 - 12.2003
  • Electrical Maintenance of (50
  • 7) TPD Rotary kiln & ESP
  • Duration: 1 year

Education

BE-Electrical(AMIE) -

The Institution of Engineers (India)
12.2002

+2 Science - undefined

Stewart Sc. College

Matriculation - undefined

Olaver High School

Skills

  • Proficient in Allen Bradley, Schneider, and ABB PLCs
  • Commissioning and troubleshooting of PLC systems
  • Logic development, Scada development and networks scheduling
  • Experience with HMI and PLC systems
  • Testing and Commissioning & maintenance of Transformers, PCC, MCC, VCB, ACB, AC/DC motors, motorized control valves, etc
  • Commissioning and Maintenance of AC, DC drives (ABB, Siemens, Schneider) Weigh feeders, Belt scales, Hopper weighing systems, etc
  • Commissioning and Maintenance of hydraulic power packs
  • Maintenance of Grabbing cranes (Federal engineering)
  • Maintenance of D G Sets (Cumin’s)
  • Erection, Commissioning and Maintenance of field instruments such as TT, PT, DPT, Level transmitters, flow transmitters etc

Certification

  • Completed Training on PLC/SLC Programming using RS Logic-5/5000 at Rockwell Automation India Pvt. Ltd, New Delhi.
  • Completed Internal Auditor Training on ISO-9001-2000, ISO-14001-2004(E) & OHSAS-18001-2007.
  • IT Skill-DCA-M.S.Office, FoxPro, C++, FULL STACK DEVELOPMENT-PYTHON, SQL, HTML.
  • Hardware – Faulty parts changing and windows installation in PC.

Disclaimer

Hereby, I'm declaring that all above statement are true to the best of my knowledge and belief. Place: Cuttack Date: 2025-06-06 Signature: [Srikanta Kumar Biswal]

Present Roles and Responsibilities

  • (Electrical, Instrumentation and Automation Head).
  • Managerial Skill(Projects):-
  • Planning, implementing and streamlining processes
  • Work closely with the design & engineering team to finalise the timeline for project layout, design and engineering drawings etc. and coordinate the same with the other teams to keep things on track.
  • Preparing project plans, budgets, project schedule, flow chart and reports for Management Information System (MIS) and their implementation for each project to ensure contractual/ compliances.
  • Create and maintain comprehensive project documentation and reports in an easy to retract manner.
  • Identification & resolution for project challenges, hurdles, issue with help of the line manager. Visiting and staying at project site for assessment and troubleshooting.
  • Experience in risk management and mitigation strategies
  • Knowledge of claim and change management .
  • Tracking project progress & project schedule to ensure the deliverables viz supply, services and permits.
  • Work with the internal stakeholders to mitigate the implementation risk, eliminate blockers, delay and functions to complete the project within time frame.
  • Participate in finalisation of BOM/ BOQ & in negotiations with various sub-contractors including assisting in invoicing to clients and payment to contractors.
  • Support to site team for all HO and vendor related requirement.
  • Multitasking and have worked multiple assignments at a time.
  • Problem solver attitude.
  • Worked at site as well as at corporate.
  • Proactive and willing to accept challenging assignments.
  • Hands-on experience in MS office.

Managerial Skill(Maintenance)

  • Ensure the plant and machinery are available in good condition to have very minimum breakdowns.
  • Ensure the maintenance activities are performed with good maintenance practices and ensuring the relevant safety guidelines.
  • Ensure the condition monitoring, preventive maintenance, spare management, inventory control . etc are managed for every equipment..
  • Coordinate with the operation team and ensure the required infrastructure is available for the plants to operate safely and achieve the targets.
  • Monitoring the deviations daily and ensure implementation of CAPA .
  • Organising In House Training for Subordinates / Operators.
  • Efficient, effective & innovative operational and maintenance planning to reduce plant downtime.
  • Condition based monitoring of the equipment along with preventive maintenance.
  • Worked as an Internal Auditor & Performed IMS Documentation Work

Timeline

DGM

M/s. SHREE ELSOFT
04.2024 - Current

AGM

M/s. AARTI STEELS LTD (steel & power)
04.2023 - 03.2024

Sr. Manager

M/s. AARTI STEELS LTD (steel & power)
04.2018 - 03.2023

Manager

M/s. AARTI STEELS LTD (steel & power)
06.2016 - 03.2018

AGM(HOD)

M/s. S.K.S.ISPAT & POWER LIMITED
04.2016 - 06.2016

Sr. Manager (HOD)

M/s. S.K.S.ISPAT & POWER LIMITED
04.2013 - 03.2016

Manager

M/s. S.K.S.ISPAT & POWER LIMITED
10.2011 - 03.2013

Sr. Engineer

M/s. AARTI STEEL LIMITED (STEEL & POWER)
04.2008 - 09.2011

Engineer

M/s. AARTI STEEL LIMITED (STEEL & POWER)
10.2006 - 03.2008

ASST. Engineer

M/s. AARTI STEEL LIMITED (STEEL & POWER)
09.2005 - 09.2006

ASST. Engineer

M/s Joy Balaji Sponge Ltd
01.2004 - 09.2005

GET

M/s Joy Balaji Sponge Ltd
01.2003 - 12.2003

+2 Science - undefined

Stewart Sc. College

Matriculation - undefined

Olaver High School

BE-Electrical(AMIE) -

The Institution of Engineers (India)
Srikanta Kumar Biswal