Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic
SRIKANTH KINTHADA

SRIKANTH KINTHADA

Senior Test Engineer
Chennai

Summary

To function in a dynamic and challenging work-environment that optimally utilizes my technical and interpersonal competencies and helps me evolve into a vital contributor towards the organization’s development. Functional Summary Over all 4Years & 5Montn(s) of experience in Software Testing of Web based Applications and Mobile Application testing (Android Apps). S.no

Overview

6
6
years of professional experience
4
4
years of post-secondary education

Work History

Senior Test Engineer

Kumaran Systems
Chennai
11.2021 - Current

Work Experience: 6 Years and 2 month(s)

Organization Name : Kumaran Systems

Project Details:

Project #1: CPCS Modernization

Testing Approach : Manual and Automation Testing

Client : Honda

Roles: Senior Test Engineer

Description:

Migrating and modernization of application from Mainframe to Java.

CPCS Application is mainly used by Honda Suppliers.The application captures the parts being manufactured and delivered daily. Checks the deliverables with the approval of Admin people. This application contains Master module,Parts module and User Configuration Module.

• Understanding Project Requirements.

• Involved in Scenario preparation.

• Involved in Test case preparation.

• Involved in test case execution.

• Doing Bug Report.

• Conducted regression testing, analyzed results, and submitted observations to development team.

• Collaborated with product owners to stay current on intended functionality..


Project #2: eQuote Modernization

Description:

Migrating and modernization of application from Mainframe to Java.

eQuote Application is mainly used by Honda Suppliers.The application primarily used for creating a Quote for the components delivered daily. Checks the quote with the approval of Admin people. This application contains Master module, Quote Module , etc.,.

• Understanding Project Requirements.

• Involved in Scenario preparation.

• Involved in Test case preparation.

• Involved in test case execution.

• Doing Bug Report.

• Conducted regression testing and submitted observations to development team

• Collaborated with product owners to stay current on intended functionality..

Novac Technology Solutions (A shriram group organization)

April 2017 - November 2021.

Project Details:

Project #1:NOVASGI “NOVA Shriram General Insurance”

Project Title : NOVA SGI “NOVA Shriram General Insurance”

Testing Approach : Manual and Automation Testing

Client : Shriram Group

Tools Used : Automation using selenium Web driver

Role : Software Test Engineer

Description:

NOVA SGI is mainly used for branch person. This application captures all information about the insured and vehicle details. Check the details and generate the policy with HO person approval. In this application contains Master module, claim module, Pre inspection module and Endorsement module

Project #2:m-NOVA Android application

Testing Approach : Manual Testing

Client : Shriram Group

Role : Software Test Engineer

Description:

SGI Mobile APP is mainly used by the SGI intermediary. This is native mobile app. This application captures all information about the insured and vehicle details. Check the details and generate the policy with HO person approval. This application contains Instant premium amount calculator, SGI branch locator, Executive chat screen and PI Image uploading and payment are done with payments gateway.

Project #2:m-NOVA Android application

Testing Approach : Manual Testing

Client : Shriram Group

Role : Software Test Engineer

Description:

SGI Mobile APP is mainly used by the SGI intermediary. This is native mobile app. This application captures all information about the insured and vehicle details. Check the details and generate the policy with HO person approval. This application contains Instant premium amount calculator, SGI branch locator, Executive chat screen and PI Image uploading and payment are done with payments gateway.

Project #3: Claim for web based Application

DSR mobile Application is B2B application. Claim for insurance is followed by the Screens as OD(Own Damage) and the TP-(Thirty Party).Collect the Basic Details from the Customer and collected details should be verified by the head Office.


Project #4: Nova Connect

Nova connect application is used by Intermediates. This application also for generating the policies for Motor vehicles. Approval and Pre inspection mechanisms are same as Underwriting. It works based on the configuration for the Product type, Vehicle type, Proposal type, Coverage and Receipt.

Project #5: Endorsement

Any changes do in the live policies, called as Endorsement. This application used by Branch person. This application consists of 2 types, orderly 1. Financial Type and 2. Non-Financial Type.

Project #6: Claim [OD and TP]

OD Claim is Intimate is done in branch, and then Surveyor is allocated to the particular claim. Once the Surveyor is done the Survey then input the data and submit for approval. After Approver approves the claim then Payment is done.

TP Claim Intimation process is done at the Branch. Post Claim Intimation process, Surveyor will be allocated to the particular claim. Post Allocation of Surveyor, the Surveyor will capture the necessary information and send the same for Approval. Post Approval, the Claim Settlement will be done Technologies: HTML, .Net, ASP.Net
Project Summary:

OD Claim is Intimate is done in branch, and then Surveyor is allocated to the particular claim. Once the Surveyor is done the Survey then input the data and submit for approval. After Approver approves the claim then Payment is done.

TP Claim Intimation process is done at the Branch. Post Claim Intimation process, Surveyor will be allocated to the particular claim. Post Allocation of Surveyor, the Surveyor will capture the necessary information and send the same for Approval. Post Approval, the Claim Settlement will be done

Manual Tester

Novac Technology Solutions
04.2017 - Current
  • Taken in to project and assigned individually in project maintained 3 people where we handled the testing activities , development team co-ordination took till the deployment and client to interact the defects
  • Currently involved in manual testing of Insurances domain platform
  • Have been involved in creating test scenarios, test cases and execution of test cases
  • Have done Functional testing, Regression testing, Integration testing, Smoke testing, Retesting, Sanity testing ,exploratory testing and Interface testing
  • Have exposure to Bug reports
  • Well acquainted with the Software Development Life Cycle (SDLC) and Software Test Life Cycle (STLC)
  • Basic knowledge of SQL
  • Knowledge of Defect Tracking Process
  • Handling the client calls
  • Roles and Responsibilities
  • Analyzing the requirement from Client
  • Testing the application for Newly Deployed Patch
  • Preparing, Analyzing and Executing the Test Cases and Test Scenarios
  • Conducting the Review Meeting within the team
  • Defect tracking and reporting the defect to developers to fix
  • Coordinate with development team for closing the defect
  • Preparing the Test data for the test case
  • Reviewing the Test Case of other team members, A shriram group organization), NOVASGI “NOVA Shriram General Insurance”
  • Project Title : NOVA SGI “NOVA Shriram General Insurance”
  • Testing Approach : Manual and Automation Testing

Education

Electrical and Electronics Engineering

Jeppiaar Institute of Technology, Anna University
08.2012 - 03.2016

HSC - undefined

SRM Nightingale Matric Higher Secondary School, Tamil Nadu State Board, Oxford Matric Higher Secondary School

SSLC - undefined

State Board

Skills

Reporting toolundefined

Accomplishments

  • TP Claim Intimation process is done at the Branch
  • Post Claim Intimation process, Surveyor will be allocated to the particular claim
  • Post Allocation of Surveyor, the Surveyor will capture the necessary information and send the same for Approval
  • Post Approval, the Claim Settlement will be done Technologies: HTML, .Net, ASP.NetProject Summary:
  • OD Claim is Intimate is done in branch, and then Surveyor is allocated to the particular claim
  • Once the Surveyor is done the Survey then input the data and submit for approval
  • After Approver approves the claim then Payment is done
  • TP Claim Intimation process is done at the Branch
  • Post Claim Intimation process, Surveyor will be allocated to the particular claim
  • Post Allocation of Surveyor, the Surveyor will capture the necessary information and send the same for Approval
  • Post Approval, the Claim Settlement will be done
  • RESPONSIBILITES:
  • Understanding the Client Requirements and functionality of the system
  • Prepare Scenarios as per requirement and prepare the test cases as per scenarios
  • Involved in preparing the traceability matrix
  • Preparing Defect Report and assigning the defects to developer
  • Involved in System and Functional testing
  • Mapping functional requirements with test cases
  • Once find the defects, will raise the defects in the company’s own defect tracker
  • After build comes, I do the Retest
  • Retesting the cases where defect has been raised
  • If defect has close
  • Have to close the defect in the Defect tracker
  • Else Reopen it
  • Have to do Regression testing, whether impact the module or not.

Timeline

Senior Test Engineer

Kumaran Systems
11.2021 - Current

Manual Tester

Novac Technology Solutions
04.2017 - Current

Electrical and Electronics Engineering

Jeppiaar Institute of Technology, Anna University
08.2012 - 03.2016

HSC - undefined

SRM Nightingale Matric Higher Secondary School, Tamil Nadu State Board, Oxford Matric Higher Secondary School

SSLC - undefined

State Board
SRIKANTH KINTHADASenior Test Engineer