To Conceive, Develop, Analyze and implement applications that perfectly meet the strategic and business of enterprise community.
Overview
22
22
years of professional experience
Work History
Manager - Validation
M/s. ELGI Equipments.
03.2013 - Current
Product range: Intake System : Air filter, Intake valve, Butterfly valve, Oil stop valve Control System : Actuator, Pressure regulator, Pressure and temperature gauges, Safety valve Cooling System : Cooler, Thermal valve, Non return valve Delivery System: Minimum pressure valve, Air oil separator, Blow down valve, Moisture separator, Auto drain valve, Dryer, Hose, Belt, Ball valve
Air compressor: Rotary and Reciprocating air compressors
Details of various tests performed: Functional, Performance and Endurance test at Normal, High temperature cyclic tests and Noise and vibration test, etc., Testing Assignments: Preparation of Reliability testing specification and plan for compressor and its parts, based on the various field operating conditions, applications and international standards
Release of Periodic validation Test Plan and reports for mass production products to QE dept
Collecting the filed data’s from various geographical locations and different field applications by using National Instruments Data acquisition system
To simulate the filed failure in lab for root cause analysis by using product testing techniques (problem analysis, statistical tools, design of experiments, reliability calculations by using Weibull software)
Providing guidance to the Technology Dept., to establish the new products, and giving solutions to the engineering team for technical problems
Deliver the Validation reports to Quality teams for Quality Reviews & Design Verifications
To Calculate the life of compressor and its parts by using Weibull software
Preparation of capex and revenue budget
Representing Cross Functional Team (CFT) from Product Reliability Assurance Lab and identifying testing facilities required for any new product in the development stage
Preparation of technical specification sheet for procurement of test rigs
Technical discussions with test rig manufacturers Procurement of custom built test rigs - PLC operated test rigs, HMI panels, Programmable timings, Pneumatic & Hydraulic actuations, Various sensors – Temp, Pressure, Vacuum, Speed etc., Inspection & approval of test rigs at supplier premises.
Lead - Engineer PLM (Windchill)
M/s. Harita Tech Serv., (Client : Volvo-IT) BANGALORE
09.2012 - 03.2013
Windchill Installation and customization – PLM / PDM Link WORK EXPOSURE IN CURRENT EMPLOYMENT Implementing business administration activities like user, group and domain creation Study and Analysing of Business requirements, Customisation, Implementation of Windchill Projects
Planning and Testing of Business requirements with coordination between Software Team and User Department
Creating Windchill Objects for Part, Products, Document, Bill Of Materials (BOM), Engineering Change Management, etc., Co-ordination with CFT team to upload & download documents in Windchill
Customisation of Various Document Management and Life cycle management reports in Windchill.
Product Reliability & Assurance Testing : Product range: Engine Lubrication System : Oil Pumps – 2 stroke & 4 stroke vehicle Engine Cooling System : Water Pumps - 4 stroke vehicle Engine Fuel System : Fuel Pump (Petrol / diesel), Auto Fuel Cocks Vehicle Cabin System : Cabin tilting Hyd
Pump , Cylinder & Latch Centralized Lubrication System : Automatic grease pump Disc Brake kit, Actuator Assy, Chain Tensioners, Auto Decompression Assy, Details of various tests performed: Endurance test at Normal, High & Low temperature, Thermal cyclic tests, Thermal shock tests, Vibration tests etc., Testing Assignments: Representing Cross Functional Team (CFT) from Product Reliability Assurance Lab and identifying testing facilities required for any new product in the development stage
Preparation of technical specification sheet for procurement of test rigs
Technical discussions with test rig manufacturers Procurement of custom built test rigs - PLC operated test rigs, HMI panels, Programmable timings, Pneumatic & Hydraulic actuations, Various sensors – Temp, Pressure, Vacuum, Speed etc., Inspection & approval of test rigs at supplier premises
Giving inputs to Design teams on various failure modes of the product by conducting highly accelerated life test ( HALT ) Validation reports to Design teams for Design Reviews & Design Verifications
Release of Endurance test observation sheets for each product
Release of Endurance Test Plan to QE dept
Daily verification of log sheets of each products test under testing
Development of Data acquisition & reports generation system by using National Instruments – Lab view from the supplier
Monitoring and approval of calibration of equipments / instruments in-time
B
Functional Consultant in Product Data/Lifecycle Management (PDM/PLM)- Windchill: Summary of Windchill Projects: New Product Development (NPD) Business Process Part & Tool Workflow Products Testing Report System Drawing issue & Documents Management System (DMS) Engineering Change Management (ECM) Process PDM / PLM Assignments: Developing workflows and lifecycles customized to Product
Object creation and Testing Windchill Installation and customization – PLM / PDM Link WORK EXPOSURE IN CURRENT EMPLOYMENT Implementing business administration activities like user, group and domain creation Study and Analysing of Business requirements, Customisation, Implementation of Windchill Projects
Planning and Testing of Business requirements with coordination between Software Team and User Department
Conduct Cross Function Team (CFT) or User departments Meeting, to customize requirements and generate Functional Requirement Document (FRD)
Integration of Project Scheduler (PS8) with Windchill system for project monitoring system Developing customized reports using Windchill Document, Process management for New Product development which captures ISO 9001 and ISO / TS 16949 documents and CAD Data
Document, Process management for Mass production Endurance testing system with online monitoring Creating Windchill Objects for Part, Products, Document, Bill Of Materials (BOM), Engineering Change Management, etc., Co-ordination with CFT team to upload & download documents in Windchill
Customisation of Various Document Management and Life cycle management reports in Windchill.
Engineer Product Engineering Dept.
M/S. L.G. Balakrishnan & Bros., COIMBATORE
01.2005 - 02.2006
Design and Drafting of Automobile components - Sprockets, Gears, Locating plates, Brake components and Engine parts
Process planning and Cost estimation for new products
Design and Drafting of Tools – Conventional tools, Jigs, Fixtures & Inspection Gauges
Preparation and Implementation of documents like, Process flow diagram, Process FMEA and Control Plan
Proto Sample development and Pilot lot co-ordination.
Quality Control Inspector
M/s. Aquasub Engineering, COIMBATORE
06.2003 - 01.2005
Assuring Quality of Export Pump components using Micrometers, Vernier Calipers, Electronic Fixtures, Comparators, Digital Height Gauge, Bore Gauge & Surface Measuring Gauges, and Trimos (2D)
Identification and rectification of Internal / External Non-conformances
Preparation and Implementation of Quality monitoring documents - Process Plan, Quality Plan, Process FMEA, and Control Plan
Implementation of QC Tools and 5S activities
Design and Drafting - Tool drawings for Quality checking Jigs, Inspection Fixtures & Gauges.
Draftsman
M/s. SAM Turbo Industry Ltd., COIMBATORE
03.2002 - 06.2003
Design and Drafting of parts - Impeller, Casing, Suction & Bracket Side, Covers, Base plates, Valves and Pump assembly
Design and Drafting of Jigs, Fixtures & Gauges.
Draftsman
M/s. Asian Cooling Systems., COIMBATORE
11.2001 - 03.2002
Drafting for Oil cooler, Heat Exchanger, Radiators
B.E (Part Time), Mechanical Engineering, Anna University, Coimbatore, Dec 2011, 9.0 CGPA
DME, Mechanical Engineering, Sri Ramakrishna Polytechnic, Coimbatore, April 2001, 84%
SSLC, State Board, Government High School, N.S.N Palayam, Coimbatore, April 1998, 74%
Experience Summary
9+ years experience in Product Reliability Testing in Automotive products manufacturing industry and Air compressor manufacturing industry., 4+ years experience in New Product Design & Development.