Summary
Overview
Work History
Education
Skills
Interests
Timeline
Generic

Stanlin Paul

Integration Engineer
Chennai,TN

Summary

Testing Engineer with 2.6 years of experience in designing, developing and implementing test cases for design verification and product testing. Contributes to company R&D engineering objective, new product introduction and process improvement goals. Developed new approach of test plans with aggressive test conditions to validate a product.

Overview

3
3
years of professional experience
6
6
years of post-secondary education
2
2
Languages

Work History

Integration Engineer

Grinnntech Motors and Services Pvt, Ltd
Chennai, Tamil Nadu
02.2021 - Current
  • Experience in testing cell level to complete pack level Lithium-Ion batteries (NMC & LFP) with and without BMS boards.
  • Carried out HiL testing to verify performance of battery and BMS boards by using test equipment like temperature chamber and battery pack cycler.
  • Managed time and test system resources to meet quality objectives and test requirements.
  • Analyzed data logs from battery to validate every functional and protection features.
  • Handled CAN and RS485 communication protocol systems.
  • Developed and executed comprehensive test plans and workforce breakdown structures for complete systems.
  • Experienced in handling various lab equipment such as scopes, power supplies, electronic load, data logger and digital multimeter.
  • Tested hardware(BMS) and software within tightly controlled sandbox environment prior to release to production.
  • Experience in handling hot and cold test chambers for testing Lithium-ion cells, batteries and BMS boards.
  • Planned, designed and performed manual and functional project testing and reported defects.
  • Constructed test environments, designed and executed test plans
  • Provided on-site technical support at various places inside and outside state and solved different issues while integration on site.
  • Experience in reading blueprints, wiring diagrams, schematic drawings and engineering instructions to properly assemble also validate product from testing point of view.
  • Carried out 8D analysis for completed assemblies and components to find root cause.
  • Utilized soldering iron to adjust and replace defective or improperly functioning circuitry and electronics components.
  • Provided team members and leadership with documentation such as test results, system design specifications and status reports.

Integration Engineer (Internship)

Grinntech Motors & Services Pvt, Ltd
Chennai, Tamil Nadu
12.2019 - 01.2021
  • Implemented test cases to validate product from basic level
  • Worked on projects using knowledge gained in classes to put together recommendations for issues
  • Learned to analyze data from BMS CAN data logging feature which gives spreadsheet of all data related to Lithium-ion battery.
  • Collaborated in professional team to solve workflow issues.
  • Sorted and organized files, spreadsheets and reports.

Education

Bachelor of Engineering - Electrical and Electronics Engineering

Sri Venkateswara College of Engineering
Chennai, TN
07.2017 - 05.2020

Diploma - Electrical and Electronics Engineering

Adhiparasakthi Polytechnic College
Melmaruvathur
06.2014 - 05.2017

Skills

● Sound knowledge in product test planning and validation

undefined

Interests

Developed my own audio amplifier from scratch

Small hobby projects using Arduino and ESP32

Learned to play piano till beginner stage

Timeline

Integration Engineer

Grinnntech Motors and Services Pvt, Ltd
02.2021 - Current

Integration Engineer (Internship)

Grinntech Motors & Services Pvt, Ltd
12.2019 - 01.2021

Bachelor of Engineering - Electrical and Electronics Engineering

Sri Venkateswara College of Engineering
07.2017 - 05.2020

Diploma - Electrical and Electronics Engineering

Adhiparasakthi Polytechnic College
06.2014 - 05.2017
Stanlin PaulIntegration Engineer