Calibrated, tested and adjusted flowmeters to ensure accurate readings.
Repaired and adjusted system components by removing and replacing defective parts.
Performed maintenance and repairs on a variety of process control instrumentation including transmitters, controllers, valves, switches, recorders and indicators.
Adhered to safety and environmental requirements .
Installed new instruments and associated wiring in accordance with safety regulations and industry standards.
General Foreman Electric Shop
Gannett – Indianapolis Star Newspaper
01.2017 - 01.2018
Project planning, including hiring outside contractors.
Purchasing all items for the electric shop.
Hiring electricians
Trouble shooting electrical problems
Safety training
Siemens S5 Programming - Modified programs and troubleshooting
Hired 10 electricians, replaced 2/3 of electrical staff without any increase in electrical related downtime.
Liaison between engineering and maintenance
Safety training meetings, etc.
Maintenance I, Electrician
Pillsbury
01.1994 - 01.1995
Maintenance I, Electrician
Designed cut bag detector
1 year Plant Closed
Graphic Electronics (owner)
Print Shop
01.1993 - 01.1994
Graphic Electronics (owner)
Embedded controllers.
Printing equipment relocation for Ivy Hill
Ivy Hill
01.1990 - 01.1993
95% electrical, Preventative Maintenance System, welding, hydraulics, Printing equipment, Trouble shooting, set up electronics lab, for in house repair.
Customer Service – Drives-AC/DC
First Rate Electric
Florida
01.1989 - 01.1990
Customer Service – Drives-AC/DC
Designed chemical batching system using AB 5/30 PLC.
Associate Director - Automation - Device Assembly and Packaging at Eli Lilly and CompanyAssociate Director - Automation - Device Assembly and Packaging at Eli Lilly and Company