Summary
Overview
Work History
Education
Skills
Interests
Timeline
Subhabrata Sarkar

Subhabrata Sarkar

Lead Engineer In Power Distribution Sector
Jharsuguda

Summary

Employment background reflects well over 16 years’ experience in electrical installation, testing, commissioning, operation and maintenance of 33/11 KV substation. Commercial activities in power distribution sector on reducing for AT&C losses. Medium voltage and LT switchgears, energy management accounting and audit. Good understanding of Electrical Drawings, Planning of projects along with installation & maintenance. Preparing Engineering budgets. Controlling equipment repair and maintenance cost. Ensuring of all planned regulatory and statutory compliance tasks are completed on or before their due dates, and accurate maintenance records are maintained in the site. Ensuring of Safety Engagement Program is implemented in all equipment - owned and hired. Good working knowledge of engineering ERPs and ensuring the ERP process is fully followed and ensure data accuracy. Liaising with related authorities and maintaining records. Seasoned Lead Engineer with a resourceful, hardworking and quality-driven mindset. Proactive in tackling equipment and system issues to maintain operational status. Top-notch leader and project manager with an organized and methodical approach.

Overview

17
17
years of professional experience
2
2
years of post-secondary education
2
2
Languages

Work History

Lead Engineer

TP Western Odisha Distribution Limited, Odisha and Tata Power
2021.12 - Current
  • To ensure implementation of OERC Supply Code & Performance Standard Regulations and other OERC directions and to ensure error free generation of electricity bills & maximize revenue generation with minimal complaints
  • Monitoring of the implementation of OERC Tariff Schedule, Bill Quality Check, assessment for faulty meter replacement and final bill generation in adherence to OERC guidelines for Supply Code & Performance Standard Regulations
  • Responsible to direct and lead the team of billing representatives (R&C) deployed at District Offices for redressal of all billing related complaints
  • Ensuring of optimization of resources through automation and digitization of existing processes
  • Providing of billing related inputs / supporting documents to Legal Dept
  • Customer Service Group with respect to escalated complaints
  • Providing of support for monthly and quarter end recovery drives
  • To perform any other work allocated by Top Management based on Organization requirements
  • Ability to propose solution in billing and other related processes based on the changes in tariff orders or commercial guidelines, government notification.

Sr. Engineer

Paharpur Cooling Tower Ltd, Asansol
Mumbai
2013.02 - 2021.12
  • Installation, testing, commissioning of Compact Substation unit up to 500 KVA, and ACB
  • Look after for trouble shooting of HT/LT switchgears, Motors up to 100HP, DG set of 625 KVA, LT common area normal/Emergency panel, MCC, PDB, MLDB panels
  • Responsible for day-to-day upkeep of all equipment, planning spares implementation within the required standards of quality, cost, time, delivery, and safety parameters
  • Managing manpower development and deployment
  • Knowledge of HVAC, STP, BMS, Cooling Tower, AHU, exhaust system piping, firefighting hydro pneumatic systems, EPBX system, CCTV along with building energy audit system
  • Involvement in fault finding and relay setting
  • To co-ordinate with Electrical Contractor for execution of the job within time schedule
  • To co-ordinate with Client, various Govt
  • Authorities for approval prior commissioning
  • Maintenance and operation of electrical equipment’s day to day basis
  • Understand cable sizing and schedule, SLD, Wiring diagram
  • To prepare DPR and all type of quality related supporting documents prior final documentation
  • Handling of lighting panel, LCS, Power receptacles, Chemical Dosing system, motor operated valve, luminaries & different types of instrumentation work in oil refinery plant.

Site Engineer

Biecco Lawrie Ltd, Asansol
Mumbai
2011.04 - 2013.02
  • Installation, testing and commissioning, operation of33 KV/6.6 KV outdoor substations, 132/33 KV bay with VCB, Protection CT’s, PT’s, Isolators, Metering CT’s surge arrestors, Control panels, Metering panels, over current relay, earth fault relay etc
  • Coordination with designers for the review of drawings and documents
  • Preparing Engineering budgets
  • Controlling equipment repair and maintenance cost
  • Preparation of BOQ in accordance with drawing released for construction, spare items, and site operation of the units strictly adhering to SOP.

Associate Engineer

Secure Energy Services Ltd
Ranchi
2008.04 - 2011.03
  • Erection testing and commissioning of Single Phase & Three Phase meters, LT CT meter etc
  • Using of SMART 2K for analysing of read meter data for load analysis
  • Preparing and monitoring of BOM, QAP (Quality Assurance Plan), ITP (Inspection Testing Plan), and other relevant documentation for project work
  • Majorly involved in following up for monthly invoicing, bill collection of Project, third party inspection of material before dispatch, and final document submission when project is completed
  • Maintaining documents and manuals of all equipment.

Technical Associate

Datagen Power System(P) Ltd
Kalyani
2006.09 - 2008.03
  • Installation of 3 phase meter for STW.

Education

Diploma - Electrical

West Bengal of State Technical Education
GPA: 78.9

Higher Secondary - science

West Bengal Council of Higher Secondary Education
GPA: 71.8

10th -

West Bengal Board of Secondary Education, Nabadwip
1999.06 - 2001.04

GPA: 77.8%

Skills

Windows 11, MS-Office, Internet tools, Auto CAD.undefined

Interests

To learn about upcoming technologies like AI, Renewable enegry and its use for saving of energy.

Timeline

Lead Engineer - TP Western Odisha Distribution Limited, Odisha and Tata Power
2021.12 - Current
Sr. Engineer - Paharpur Cooling Tower Ltd, Asansol
2013.02 - 2021.12
Site Engineer - Biecco Lawrie Ltd, Asansol
2011.04 - 2013.02
Associate Engineer - Secure Energy Services Ltd
2008.04 - 2011.03
Technical Associate - Datagen Power System(P) Ltd
2006.09 - 2008.03
West Bengal Board of Secondary Education - 10th,
1999.06 - 2001.04
West Bengal of State Technical Education - Diploma, Electrical
West Bengal Council of Higher Secondary Education - Higher Secondary, science
Subhabrata SarkarLead Engineer In Power Distribution Sector