Summary
Overview
Work History
Education
Skills
Websites
Accomplishments
Languages
Timeline
Generic

Sudesh Dessai

Bangalore

Summary

Multi-talented industrial, process, and continuous improvement engineering professional with a proven track record of driving operational excellence and business growth. Adept at designing, executing, and leading transformative process improvements that enhance efficiency, reduce costs, and enable scalable growth. A visionary leader with a strong history of guiding cross-functional teams and business operations toward sustained success.

Overview

10
10
years of professional experience

Work History

Senior Manager - Industrialization Assembly Process

Schneider Electric India Pvt Ltd
Bangalore
07.2023 - Current
  • Participate in early product design and provide assembly process input to the product with respect to manufacturability, CAPEX, and ergonomics.
  • Scheduling machine development timeline and ensuring adherence to the overall project timeline at different stages (Open gate to Sell gate).
  • Drafting engineering estimations for semi-automatic and automatic machines, assembly lines with traceability (MES), and documenting detailed technical specifications for the suppliers to provide detailed quotations.
  • Supporting the purchase to negotiate and finalize the supplier with engineering estimation.
  • Participate in the detailed design of the machines with the supplier and finalizing the design by reviewing it with the CFT (Project and Plant Team); conducting trials, validation at the supplier as well as at the plant end, pilot run, and hand over machines to the plant.
  • Providing detailed training on the operation of the machine, process sequence, maintenance, and MES.
  • Responsible for product simplification and optimization from the assembly perspective, managing DFA and Line Architecture studies.
  • Acted as the window between R&D and equipment suppliers to work out the best solution for assembly.
  • Layout planning on the shop floor and creating efficient flow to ensure reduced material and man flow.
  • Proposing and justifying investment versus assembly cost: the most economical manufacturing process architecture according to the rules of the Schneider Production System (SPS) and Line Architecture Design Methodology (LADM).
  • Drafting/Reviewing Assembly Chronology (PFD), MFMEA, LADM, DFMEA, PFMEA, etc.

Process Engineer - Engineering

CommScope India Pvt Ltd
Verna
12.2021 - 07.2023
  • Designed, installed, and commissioned improved assembly line layouts. Introduced a ball transfer unit conveyor to reduce 46% of the area and 40% of manpower compared to sending site (Mexico) for the same capacity (Transfer Project).
  • Leading continuous improvement and automation projects as part of CCF and VSM workshops to improve productivity and reduce manpower (FOH, VOH, and Labor).
  • Drafted bay layout, filled machines, and created efficient flow as a part of CCF workshops to optimize the process and overall efficiency, including space.
  • Installed and commissioned cable cutting machines and product assembly lines for the entire business unit as per process layout, product layout, batch manufacturing, and single piece flow.
  • Lead a team of eight process technicians to ensure a smooth process flow in shifts on the shop floor.
  • Actively teamed to drive CCF and VSM workshops for 6 assembly lines, 2 manufacturing lines, and 6 re-coiler machines to ensure smooth man and material flow throughout the business unit, and optimum utilization of capacity.
  • Improved FG material flow by optimizing man and material movement (eight wastes) and activity planning using time study. Further, reduced FG inventory and freed 600 sq. mts. of the space.
  • Implemented Kanban and JIT to reduce the space of 415 sq. mts. and manage RM and WIP inventory.
  • Designed jigs and fixtures and managed suppliers to meet the equipment and fixture requirements.
  • SMED: Reduced cable re-coiler machine set-up time from 180secs to 35 secs i.e., 80% reduction, further improving machine utilization.
  • Cost-saving champions: packaging improvement of $2 million annually, received the 'CommScope Star Award.'
  • Drafted, approved and maintained Process Flow Diagram, Control Plan, Work instructions and PFMEAs.
  • Recognized and rewarded with two 'CommScope Star Awards' for contributions towards layouts and process improvements.

Associate Lead Engineer - Operational Excellence

Rheinmetall Automotive India
Takwe
06.2021 - 12.2021
  • Developed road map for the implementation of Business Excellence strategy in the plants.
  • Successfully drafted 6S implementation structure and implemented 6S on the shop floor, R G R structure developed to evaluate and improve monthly performance.
  • Completed DMAIC project on scrap reduction. Total scrap reduction from 4% to 1.8%.
  • Implemented 3 pillars of TPM-Focused improvement, Planned Maintenance and Autonomous maintenance.
  • Conducted training session for operators and middle management on lean tools.
  • Reduced press shop operator spaghetti, improved operator movement time from 55 mins to 13 mins, reduction of 76% by re-layouting.
  • Drafted and implemented standard work on shop floor.
  • Implemented visual factory on shop floor.

Associate Lead Engineer - Industrial Engineering

Rheinmetall Automotive India
Takwe
11.2017 - 12.2020
  • SMED G 5s: Improved fine boring process set up time by identifying internal and external activities and introducing Tool Pre-setter equipment, Set-up time reduced from 45 mins to 15 mins, 33% reduction.
  • Improved cycle time of fine boring process from 9 secs to 6 secs by improving machine process sequence. Further reduction in cycle time by 33%.
  • Improved Fine boring cutting tool geometry from orthogonal to oblique cutters to divert chips and improved chip breaker geometry.
  • Calculated and maintained Capacity calculation of the manufacturing lines.
  • Deputed to Germany to transfer half plain bearing manufacturing technology from sister plant.
  • Installed and commissioned plant machineries as per business requirement.
  • SPM: Developed conveyor type ultrasonic cleaning machine for the Half Plain Bearing.
  • Machine modifications: refurbishment or modification of the existing machines as per capacity requirements.
  • Conducted feasibility studies for the new product requirement.
  • Conducted periodic process capability studies to monitor process health.
  • Drafted and approved Work Instruction manuals, Control Plans and maintained PFMEAs for the process.

Process Engineer - Industrial Engineering

Rheinmetall Automotive AG
Papenburg
01.2018 - 06.2019
  • Responsible for transfer of equipment and process knowledge within inter entity from Germany to India.
  • Training as process specialist for internal turning operation for micro grooving (Fine boring Technology).
  • Wrote technical document to evaluate quality of 'Press bending operation.'
  • Trained Indian technicians and supervisors to operate and maintain German machines and equipment's.
  • Assisted Continuous Improvement Engineer in implementation of KANBAN on the shop floor.

Quality Engineer

Kineco Kaman Composites India Pvt
Pilerne
06.2015 - 11.2017
  • Dimensional inspection of carbon fiber composite assembly parts and assembled structures using a portable CMM-Faro Edge Arm.
  • Thorough in reading drawings of Boeing and Airbus, good knowledge of GDGT, tolerance stack up.
  • First Article Inspection (FAI) as per AS9102.
  • Non-destructive Testing of Carbon, aramid, Glass fiber parts and assemblies NDT-Level-II in UT as per ASNT (SNT-TC-1A).

Education

BE - Mechanical Engineering

SJC Institute of Technology
Karnataka
01.2014

Skills

  • Lean Six Sigma Green Belt
  • Process flow diagram (PFD)
  • Time study
  • Line balancing
  • Process improvement and management
  • Work instruction
  • Plant layout
  • PFMEA
  • MFMEA
  • CAPEX
  • Ergonomics
  • Assembly Line & Work Station
  • Control plan
  • CCF workshop
  • VSM Workshop
  • KANBAN
  • JIT
  • Process metrics
  • KAIZEN
  • SMED
  • LPA
  • TPM
  • Manufacturing line
  • ASNT Level 2 UT
  • Minitab
  • SolidWorks
  • Ergonomics

Accomplishments

  • Process improvement, improved packaging of the product, saving $2 million per year, received star award at CommScope
  • Layouts and line installation, designed layout, installed four assembly lines with a conveyor system, and ramped up efficiency from 40% to 94% in a two-month period
  • Project on-time delivery, delivered line installation, and commissioning project with operator training within the timeline, received STEP-UP recognition at Schneider Electric

Languages

Konkani
First Language
English
Proficient (C2)
C2
Marathi
Proficient (C2)
C2
Hindi
Advanced (C1)
C1
Kannada
Beginner (A1)
A1

Timeline

Senior Manager - Industrialization Assembly Process

Schneider Electric India Pvt Ltd
07.2023 - Current

Process Engineer - Engineering

CommScope India Pvt Ltd
12.2021 - 07.2023

Associate Lead Engineer - Operational Excellence

Rheinmetall Automotive India
06.2021 - 12.2021

Process Engineer - Industrial Engineering

Rheinmetall Automotive AG
01.2018 - 06.2019

Associate Lead Engineer - Industrial Engineering

Rheinmetall Automotive India
11.2017 - 12.2020

Quality Engineer

Kineco Kaman Composites India Pvt
06.2015 - 11.2017

BE - Mechanical Engineering

SJC Institute of Technology
Sudesh Dessai