Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic
Sujin Benjamin

Sujin Benjamin

Summary

Skilled senior facility executive with 12 years of experience in the integrated facility management and commercial industries. Proven ability to manage multiple projects simultaneously, maintain a high level of customer service, and adhere to safety and security protocols.

Overview

13
13
years of professional experience

Work History

Senior Executive – Facilities

Jones Lang LaSalle
04.2017 - Current
  • Manage in-house operating engineers of multiple skills including building engineers, electricians, painters, door specialist, HVAC technicians, and carpenters.
  • Managed work performed by 15+ vendors performing multiple levels of work, including projects up to 5 Million
  • Created the standardized method of procedure (MOP) format for all work being performed by vendors and in-house staff, including safety hazard analyses and preventive measures.
  • Led Root Cause Analysis (RCA) of evaluations to improve work processes and equipment maintenance plans.
  • Ensured energy efficiency in all utilities including electricity and water.
  • Monitored environmental conditions of humidity, air quality, and temperature.
  • oversee all aspects of the physical facilities including budget management, building maintenance and renovation, building safety, and repair and replacement of equipment.
  • prepare estimates, schedules and plans for operational and maintenance projects.
  • prepared annual operating and capital budgets of 10 Million.
  • negotiate and manage vendor contracts.
  • manage and develop the facility maintenance staff to ensure duties are performed in a timely and efficient manner at the required level of quality.


Project Engineer

C.R.I. Pumps
04.2014 - 04.2017
  • Maintained records for each project and engineering discipline.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Identified technical risks within managed projects.
  • Recommended improvements for design, construction means and materials based on field or changing conditions.
  • Assisted with cost proposal development and customer presentations.
  • Determined and scheduled priorities as required to progress engineering work.
  • Reviewed contractor proposals to determine favorable partnerships for on-time and under-budget project completion.
  • Conducted technical evaluations of engineering designs and test results.

Project Supervisor

Elcon Power Tech
01.2012 - 04.2014
  • Delivered completed projects on time by prioritizing multiple tasks.
  • Supervised work of team members, offering constructive feedback regarding work performance.
  • Trained employees in safety procedures and protocols as directed by company regulations.
  • Defined manpower, equipment and resource needs for field projects, keeping open lines of communication with specialists and contractors to meet project milestones on time and on budget.
  • Communicated deadline updates, outlined action items and offered targeted solutions to team members.
  • Updated customers and senior leaders on progress and roadblocks.
  • Provided status updates for projects, delivering information to all stakeholders.
  • Maintained high safety standards by following policies, procedures and protocols outlined by company, OSHA and EPA.

Site Engineer

Polar Electrical
06.2011 - 12.2011
  • Checked technical designs and drawings for adherence to standards.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
  • Oversaw quality control and health and safety matters for construction teams.

Graduate Engineering Trainee

JKM Automotive
06.2010 - 06.2011
  • Maintained positive work atmosphere by building relationships with co-workers, customers, clients, and management.
  • Studied manufacturing processes to improve overall knowledge.
  • Collaborated with senior engineers on projects and offered insight.
  • Assisted senior engineers and management with clerical duties to keep department functioning and workflows running smoothly.
  • Worked closely with engineers and assisted with testing of CNC products.
  • Prepared standard reports and documentation to communicate results to senior management.
  • Assisted with coordination of new equipment installation and implementation.

Education

Bachelor of Engineering - Electrical, Electronics Engineering Technologies

CSI Institute of Technology,
Kanyakumari
06.2010

Skills

  • Facility Management (FM)
  • Contract Management
  • Contract Negotiation
  • Budgeting
  • Project Planning
  • Operations Management

Languages

English
Advanced (C1)
Tamil
Bilingual or Proficient (C2)
Malayalam
Intermediate (B1)

Timeline

Senior Executive – Facilities

Jones Lang LaSalle
04.2017 - Current

Project Engineer

C.R.I. Pumps
04.2014 - 04.2017

Project Supervisor

Elcon Power Tech
01.2012 - 04.2014

Site Engineer

Polar Electrical
06.2011 - 12.2011

Graduate Engineering Trainee

JKM Automotive
06.2010 - 06.2011

Bachelor of Engineering - Electrical, Electronics Engineering Technologies

CSI Institute of Technology,
Sujin Benjamin