Summary
Overview
Work History
Education
Skills
Languages
Certification
Timeline
Generic
Sunil Dhoble

Sunil Dhoble

Pune

Summary

SENIOR MANAGER PROJECTS / GENERAL MANAGER PROJECTS

Construction of Industrial Project, Bridges, Slip form and Hydal Projects, Oil and Gas projects

Self-starter well organized and solutions-driven Engineer with demonstrated excellence in management of Industrial Projects, Infrastructure Projects, Oil and Gas Projects from preliminary Construction to Pre-commissioning and commissioning. Professional with an excellent grasp of Project, Construction and Contract Management, alignment of resources, services and a proven ability to improve efficiency, reduce costs, and enhance client satisfaction. Motivational team player well versed in managing multiple aspects of project within the constraints of scope, time, cost and quality.

Exposure of coordination and working in Large Projects related to OIL and Gas, Fertilizer, chemical projects in Europe, Australia, North Africa (Morocco) with international Client, Contractors and consultants.

Overview

40
40
years of professional experience
1
1
Certification

Work History

Site Head : Senior Manager Projects

Thirumalai Chemicals Limited
08.2018 - 06.2022
  • Reporting to Executive Director
  • Overall direction, coordination, implementation, execution, control, and completion of project ensuring consistency with company strategy commitments and goals
  • Manage and delivering the Project including detail design and execution on time with Scope and Budget
  • Responsible for entire Engineering coordination of Grass Root Construction and Commissioning of TCL Phase 1 project
  • Coordination with Government Authorities for obtaining statutory/ legal compliance approvals
  • Project cost: 300 Crore Location: Dahej, District Bharuch Product: Phthalic anhydride

Construction Manager

Jacobs Engineering India Pvt. Ltd
04.2017 - 07.2018
  • Expediting and completion of construction activities and assistance to mechanical commissioning team of Di-Ammonia plant.

Construction Manager

Aker Powergas Pvt. Ltd
08.2010 - 04.2017

Johan Sverdrup, Offshore Project, North Sea Norway Client: Johan Sverdrup

Scope/Description: Estimated cost of project is NOK 170 billion for Phase 1. Production capacity of 440,000 barrel per day.

Structural team is having a massive scope of designing and delivering drawing for approximately 15000 MT related to Process and Riser Platform along with three interconnecting

Responsibilities:

• Structural weight growth and mitigating measure for Riser and Process Platform.

• Ensuring Structural Drawing delivery is on time for Riser and Process Platform.

• Expediting, Implementation and closure of design changes via Change control system.

• Verifying Secondary structural steel design for EIT and HVAC supports for prescribed load limit.

• Monitoring and expediting Electrical discipline delivery

Snoree, Bergen Norway Client: Statoil Bergen Norway

Role: Discipline Responsible Engineer- Installation & Commissioning (MMO)

Scope/Description:

• Delivery and upgrading of the drilling equipment and system on the Snorre -A Platform

A drilling facility of Statoil

• Estimated contact value is NOK 1 billion.

• The main object is to extend the technical lifetime Up to year 2040. The work includes major upgrade in the following

Drilling Modules (DES)

Drilling Support Module (DEM)

Pipe Deck

Responsibilities:

• Developing Commissioning Procedures & Defining Commissioning and MC packages in ProCoSys, with relevant Boundary drawings.

• Checking of Job Cards. (Work Packages)

• Coordination with Supplier for supplier Package.

• Offshore Visits for survey and verifying Installation/ commissioning.

• Inter discipline as well as client Coordination.

• Installation sequencing of offshore Installation.

• Reduce offshore activities by optimizing the Installation Method

• Material Handling Philosophy.

Project Co-coordinator From Head Office

Aker Powergas Pvt. Ltd
06.2008 - 08.2010

Project for Catalyst Production, JMC- Kanpur

Client: Johnson Matthey India Pvt. Ltd

Scope/Description:

• Johnson Matthey India Pvt. Ltd a leading Chemical Catalyst and absorbent manufacturers for setting up Three Process Plant along with Utility structure and Storage sheds.

• Process plant namely —

· Colt Plant - 60MX40MX48M - Structural steel for super structure approximately 1500 MT.

· Replica Plant - 30MX40MX26M - Structural steel for super structure approximately 500 MT.

· Plant 123 - Process Plant of size 25x40MX22M — Structural steel in superstructure of Approximate weight 450 MT.

• All the steel was prefabricated in a shop at Kota Rajasthan and transported to Kanpur. •Storage shed was a PEB structure.

• Approximately 1000 T of equipment and around 600 Instrument were installed for the project.

Responsibilities:

• Prequalification of contractor and preparation of bidder list.

• Process, preparation, and completion of tender document.

• Bid Analysis and recommendation.

• Process and preparation of order specification.

• Understanding Value engineering activities.

• Constructability review and recommendation.

• Review Monitoring, tracking progress, Quality and HSE function at site.

• QMS & Technical Audit at site.

• Assisting Site Manager for preparation of QAP and ITP'S.

• Appraise and update of Vendor registration.

• Client coordination and conducting review meetings with client.

• Ensuring implementation of company's QMS at site.

• Follow up and expediting Project specific plan with Engineering, Vendor and Client

• Cost Monitoring and control.

• Review and recommendation of Extra claim from Contractors.

Principal Engineer (CSA)

Aker Powergas Pvt. Ltd
01.2000 - 06.2008

Scope/ Description:

• Carried out designing Civil/ structural buildings on Stad Pro apart from designing underground services, Foundations for storage tanks, Design for RCC Raw water/ fire water tanks and other offsite structure.

• Also, executed below projects along with CSA team—

- Aqua pharm Chemical Pvt. Ltd, Mahad, Maharashtra

- Cargill Vegetable Oil Refinery project at Paradeep Oddisa.

- FMCG Project for Hindustan Uni Lever (HUL) at Kandla Gujrat

- Cargil Vegetable Oil Refinery Project at Kandla Gujrat.

- FMCG Project for HUL at Baddi. Himachal Pradesh

- Cross Country pipeline Project for British Gas AT Hazira, Gujrat

Responsibilities:

As Group Lead

• Monitor and control Man hours allotted.

• Plan manpower to meet target output dates.

• Ensure timely receipt of inputs from other groups and take up appropriately with projects or concerned group if inputs are delayed.

• Identify the work scope, review changes and additions in inputs and raise man-hours variations as required.

• Prepare quality level description for the discipline.

• Review COCL filled by engineers in the task force.

• Participate in meeting with client PMC as required.

• Ensure HSE requirements on the project are implemented in design.

As Area Lead

• Prepare Design basis.

• Prepare work specification and cost estimates.

• Prepare and/or check design calculations, MTO, BOQ.

• Check drawings and drawing change notes.

• Review vendor drawings and fabrication drawings.

• Maintain effective communication with group lead and other engineers.

Site Construction (Site Manager)

Aker Powergas Pvt. Ltd
01.1993 - 01.2000

Projects:

• Copper Smelter project of Sterlite Industries at Ratnagiri/ Tuticorin - Structural steel- 6000MT/ RCC-20000 cum.

• Polyester Plant for Leading Synthetic at Melbourne, Australia — Structural steel 600 MT/ RCC-5000 Cum.

• Agro Chemical Plant FOR Gharda Chemical Plant at Panoli, Gujrat- Structural steel 1500 MT IRCC 10000 Cum.

• Zinc Smelter Project, Dariba, and Rajsamand, Rajasthan for Vedanta group Structural steel 15000 MT / 70000 cum.

Responsibilities:

As Senior Engineer

• Preparing Method Statement and JSA, ITP for CSA work.

• Checking and certification of all CSA work.

• Pre & post fabrication and erection checks for Structural work.

• Certification of monthly Invoices of site Contractors.

• Preparing as Built Drawing.

• Handing over of civil and structural foundations.

• Verifying and approving Concrete Design mix, witnessing welder qualification.

• Verifying and checking Architectural bought out items for technical specificStorage shed was a PEB structure.

• Approximately 1000 T of equipment and around 600 Instrument were installed for the project.

Responsibilities:

• Prequalification of contractor and preparation of bidder list.

• Process, preparation, and completion of tender document.

• Bid Analysis and recommendation.

• Process and preparation of order specification.

• Understanding Value engineering activities.

• Constructability review and recommendation.

• Review Monitoring, tracking progress, Quality and HSE function at site.

• QMS & Technical Audit at site.

• Assisting Site Manager for preparation of QAP and ITP'S.

• Appraise and update of Vendor registration.

• Client coordination and conducting review meetings with client.

• Ensuring implementation of company's QMS at site.

• Follow up and expediting Project specific plan with Engineering, Vendor and Client

• Cost Monitoring and control.

• Review and recommendation of Extra claim from Contractors.

Civil Engineer

Vikram Ispat Unit of Grasim Industries
07.1990 - 12.1992

Client: Vikram Ispat

Scope/Description:

• Vikram Ispat Ltd (Unit of Grasim Industries Ltd) now owned by JSW (Jindal Steel Works). A Sponge Iron project with Davy Dravo as technological partner.

• The project estimated cost was around 600 crores.

• Major structure: Main Reactor - 60MX40MXIOOM – RCC + Structural Tower -10000 MT involves around total weight around 10000MT.

• Cross Country Conveyors around 3.50 KM in length and approximately 3500 MT of structural steel fabrication and erection.

• Main Pipe rack- RCC + Structural steel.

• Structural steel fabrication around 2000 MT.

• Site grading- Filling of earth from outside is around 650000 cum and cutting is around 450000 cu m including cutting of Hard rock around 300000 cum.

• Roads and Drains- Internal roads around 25000 sq. m and RCC SW drain AROUND 7 KM.

Responsibilities:

• Main Reactor — Main Process Plant a combination of Deep RCC open foundation and super structure in Structural steel.

• Main Reformer Structure- RCC Foundation and super structure in Structural Steel.

• Material Handling Cross Country Conveyors from Jetty to Process plant (3.5 KM) — RCC foundation and structural steel in Super structure.

• Main Pipe rack in Process Plant.

• Site grading, Roads and underground services including storm water drain.

• DG and TG building- Ground +2 RCC building

Assistant Engineer

M/S Gammon India Ltd
07.1984 - 06.1990

Major Clients:

• Maharashtra Public works department.

• Madhya Pradesh Bridge Corporation.

• Indogulf Fertilizers Limit (Unit of Grasim Industries) Jagdishpur, Uttar Pradesh

• Sanjay Gandhi Thermal power Project Shahdol, Madhya Pradesh

• Madhya Pradesh Electricity Board Hoshangabad, Madhya Pradesh

Scope/Description:

• Mond Creek Bridge, Sindhudurg - Construction of Cantilever bridge of length 250 m constructed over Mond creek at Deogarh. Maximum span 90 m.

• Khopta creek - simply supported bridge, 300-Meter-long bridge.

• Jamni Bridge at Tikamgarh, MP - 250 m long simply supported bridge, Open foundations.

• 200 m high RCC Chimney for Sanjay Gandhi Thermal Power Station, Birsingpur, MP on Slip form System.

• Process tower 30 m diameter and 98 m height at Jadishpur for Indogulf fertilizer Limited.

• Morand Mini Hydal Project- Construction of Powerhouse including installation of Turbo generators and construction of U/S and D/S irrigation canals

Responsibilities:

• Survey, marking layout for structures, In-house concrete mix design, bar bending schedule, critical form work.

• Deep foundation on cassions for bridges, Construction of coffer dams, Critical shoring, Post tensioning for super structure, construction of heavy equipment foundations, Slip form for towers and Chimneys.

• Construction of Irrigation Cannels.

• Generating Payment invoices (RA Bills) of company, recording Extra item of work, generating purchase orders for subcontractors, working out quantities from drawings, Structural fabrication work, erection of critical Scaffolding for bridge super structure, Maintaining records

Trainee

Madhya Pradesh Public Works Department
07.1982 - 06.1984

Scope/Description: Was under training for Civil Construction work for Residential and Commercial Complex

Responsibilities:

• Survey work, Site supervision

Education

Diploma in Civil Engineering - Civil Engineering

Shri Vaishnav Polytechnic College
Indore
06-1982

Higher Secondary Certificate -

Dev Ahillya School
Khargone
07-1979

Skills

  • Contract Management
  • Contract Negotiation
  • Project Engineering Management
  • Change Management
  • Budget Scheduling
  • Progress measurement with project control team
  • Stakeholder Management
  • Construction Management
  • Leadership
  • Risk Assessment
  • Strategic Decision Making
  • Client and Vendor Co-ordination
  • Legal compliance
  • Oil and Gas : Project Engineering and Installation

Languages

  • English
  • Hindi
  • Marathi

Certification

  • Basic Safety Training Including HUET and EBS
  • Certified Internal Auditor for ISO 9001
  • Certified Auditor for ISO -14001

Timeline

Site Head : Senior Manager Projects

Thirumalai Chemicals Limited
08.2018 - 06.2022

Construction Manager

Jacobs Engineering India Pvt. Ltd
04.2017 - 07.2018

Construction Manager

Aker Powergas Pvt. Ltd
08.2010 - 04.2017

Project Co-coordinator From Head Office

Aker Powergas Pvt. Ltd
06.2008 - 08.2010

Principal Engineer (CSA)

Aker Powergas Pvt. Ltd
01.2000 - 06.2008

Site Construction (Site Manager)

Aker Powergas Pvt. Ltd
01.1993 - 01.2000

Civil Engineer

Vikram Ispat Unit of Grasim Industries
07.1990 - 12.1992

Assistant Engineer

M/S Gammon India Ltd
07.1984 - 06.1990

Trainee

Madhya Pradesh Public Works Department
07.1982 - 06.1984

Diploma in Civil Engineering - Civil Engineering

Shri Vaishnav Polytechnic College

Higher Secondary Certificate -

Dev Ahillya School
Sunil Dhoble