Sunil Kr Singh

Lucknow

Summary

Resourceful and dedicated construction professional with 24 years of experience managing large-scale multi diversified construction projects. Influential leader, skilled at completing projects within timeframe and budget.Skilled at task prioritization and problem-solving. Strong communicator and team player.

Sectors I have worked as on date:

· Petrochemical Refineries, Oil & Gas Plants

· Residential Buildings

· Commercial Buildings

· Sports & Infrastructure Projects

Overview

25
25
years of professional experience

Work History

Senior Manager

Reliance Corporate IT Park Ltd
Navi Mumbai, India
02.2014 - 03.2023
  • World Largest Petrochemical Refinery Project, Jamnagar Gujarat. Unit SEZ Refinery Tank Farm & Offsite Utilities
  • Executed all types of Heavy Equipment Foundations & Other Civil Structure Air Compressor Foundations, Fire Engines, Pipe Culverts, Pipe Bridges Cross Overs, Concrete Sleepers, T- Supports, and Blow Drums.
  • And in the documentation part we issued drawings to vendors
  • BOQ and PR/PO creation request to the Contracts department.
  • SER Request to engineering for deviations arises in structures
  • Checking & certified bills of vendors.
  • Project: Retail Outlets, MCN Building & ILA in UP
  • Dashboard sharing to Responsible for entire work for commencement of construction to HOTO to Operation.
  • It covered PR /PO Creation after approval from Construction Head, BOQ Preparation, Checking & Certification of Bills.
  • Monthly & Weekly Plan review with Vendors for progress & monitoring during the execution of sites.
  • Site Inspection Reports preparation & JV with Quality team for witness etc. reporting manager everyday.

Senior Field Engineer

Jaiprakash Associates Limited
Noida
03.2010 - 01.2014
  • Budh International Circuit Project, Greater Noida Uttar Pradesh.
  • Responsible for Execution of Team Buildings, Entrance Gate, Laboratories & Water Treatment Plant & Elevated Water Storage Tank Capacity 300KL, 15M
  • Responsible for giving technical inputs to the contract department by preparing BOQ, Vendor selection, PR/PO creation to the P&C team for allocation of Vendors.
  • Meeting with Vendors & Consultants for the plan, schedule & weekly progress monitoring meeting with deadlines given in the work order.
  • Achievement: Water Treatment Plant Civil Structural work completed in 03 months time & as per actual schedule these activities was to be completed in 05 months. Changes in plan to complete ahead timeline we had implemented & focused on to increased in shuttering materials & manpower requirements with changing in times to have more progress.
  • Motivate Labours, supervisors, labours with awards & welfare everyday in that project.

Assistant Construction Manager

DLF Laing O Rourke India Ltd
Gurgaon
09.2007 - 03.2010
  • DLF SEZ IT Park Building, Silokhera Gurgaon.
  • Responsible for reinforcement Work of entire IT Park Building. It was Multistoreyed High Rise 3B+G+22Floors,Tower & Non Tower Area.
  • Raise PO for Steel Reinforcement & Barbending & Cutting Machine requirements to Contract Department.
  • Responsible for finalized the location of steel yard in accordance with tower crane boom length to ease for steel lifting @ required location from steel. Temporary shed arrangement also made for cutting & bending of steel till structural work completion in the project.Seperate team from vendor created for rebar & shifting of materials in yard.
  • Handled total engineering staff for BBS preparation 10 in size for 08 Blocks. Store Keeper - 02 .And Vendor Team was 28 including supervisor for both day & night shift.
  • Checking & Certification of Contractors bill, BBS Certification from Clients in daily basis for every stage of work completion. Reconciliation of Materials etc.

Civil Site Engineer

Larsen & Toubro Ltd
Chennai
06.2006 - 09.2007
  • SEZ Jamnagar Export Refinery Project, Gujarat.
  • Fluidized Catalyst Crakers Unit.
  • Responsible for the total Execution of work which includes the following:
  • Layout & Levelling of site. Bar Bending Schedule.
  • Formwork & Concreting work. Pre-Pour Card & Post-Pour Card Reports to be signed by client.
  • MB detailing, checking & certified bills of petty contractors for releasing payments.
  • JMR Sheet for extra work offered to client for signed. SER Request was generated to client where deviation occurred.
  • Type of Civil Structures Raft foundation/ Column/ Beams etc. Executed -
  • Reactor Regenerator foundations, Column ST-04, ST-011, Cooling Tower, Pipe Racks, Pipe Culverts, Concrete Rail Track , Pre-Cast Center Ballast & Counter Weight casted for Zoomlion make Tower crane for Spool handling for FCCU & other units of Refinery.
  • Highlights of my Job involvement:
  • Total Concreting done 21000 Cum
  • Steel Reinforcement done 3000 MT fabrication done.
  • Achievement :4610 Cum record pour done in 13 hours in reactor with engagement of Static Pumps 04, Boom Placer 08, 89 Transit Mixer, 06 Chutes & 72 Labours etc. Total Steel 1400 MT in Reactor Foundation.
  • Cooling Tower Mass Concrete was 13000 cum.
  • Supervised contractor Quality Assurance (QA) and Quality Control (QC).
  • Monitored construction site progress, managing routine and complex issues to keep tasks on track and costs within budget.

Senior Inspection Engineer

Reliance Engineering Associates Ltd
Navi Mumbai
12.2003 - 04.2006
  • Reliance Petrol Pumps & MCN Building in Kanpur Division. Handled independently & successfully completed & same was handed over to RIL for operation. Responsible for entire Civil, Mechanical & Electrical activities executed under my supervision & guidance as a client.
  • Checking & Certified RA bills submitted monthly by vendors for raise payments.
  • BBS Certification, Layout & Levelling of Sites.
  • Ensure that vendor is implementing the given procedure & guidelines as provided by us.
  • Progress monitoring with ensure all construction activities are going as per given drawings & specifications.
  • Technical discussions between Consultant & Vendors to resolve the appeared issues in drawings during the work progress. And to liquidate the said issue we usually asked designer to put his remarks in drawing with his sign of acceptance so that site cannot hold & revised drawing could issue for the same queries can reach @ site in next 03 to 05 days. Core Test Witness Cube Test Witness Rehabilitation work.

Project Manager

Pacific Projects Ltd, An EPC Organization
05.1998 - 12.2003
  • LPG Indane Bottling Plants, IOCL, LEH LADAKH (J&K) & LUCKNOW, UTTAR PRADESH.
  • Site Execution of all Civil & Electrical works of LPG IOCL Plants. My Job involvement.
  • Construction Management, Material Management, Construction Planning, and Manpower Planning. Progress monitoring of Contractors.
  • Safety Walk on a weekly basis. Checking & Certified RA bills of petty contractors & agencies for their monthly payments from account department. Drawings related queries to be resolve wit client & consultant. DPR maintain daily on register for productivity outcome & analysis for rates if it going impact on cost. Then escalation sheet to be prepare for revised rates.
  • Weekly & Monthly review against the targeted plan with vendors & Clients.
  • Selection of Vendors as per activities involved to give technical input to contract department for final approval of work order.
  • Following Civil Structures Executed : All types of Machine Foundations, Fire Water Pump House, LPG Pump House, Loading & Unloading Shed, RCC Driveways, PMCC Room, DG Room, Stone Pitching,Pebble Pitching & Stone Masonry for pipe Culverts, NP2 Hume Pipe Laying through out the plant for cable entering & terminating to MDB with FLP Glands. FW pipe line Steel Structural Cross Overs with fabrication & welding, Valve Operation Platforms, Inspection Gantry, Jump Overs, RCC Electrical Cable Trenche, MS Oil Tanks Chambers of Capacity 20 KL & 50 Kl Capacity. etc.

Education

Diploma of Higher Education - Civil Engineering

Govt. Higher Secondary School
2013

Skills

  • Construction Management
  • Project Execution
  • Progress monitoring
  • Planning & Scheduling
  • Profit & Loss Statement Monthly
  • Manpower & Material Management
  • Quantity Survey/Billings

Education

other

Languages

English, Hindi, Punjabi, Bengali
First Language

Timeline

Senior Manager

Reliance Corporate IT Park Ltd
02.2014 - 03.2023

Senior Field Engineer

Jaiprakash Associates Limited
03.2010 - 01.2014

Assistant Construction Manager

DLF Laing O Rourke India Ltd
09.2007 - 03.2010

Civil Site Engineer

Larsen & Toubro Ltd
06.2006 - 09.2007

Senior Inspection Engineer

Reliance Engineering Associates Ltd
12.2003 - 04.2006

Project Manager

Pacific Projects Ltd, An EPC Organization
05.1998 - 12.2003

Diploma of Higher Education - Civil Engineering

Govt. Higher Secondary School
Sunil Kr Singh