Summary
Overview
Work History
Education
Skills
Software
Languages
UNDERTAKING
PERSONAL DETAILED
Timeline
Generic
Suraj Kumar

Suraj Kumar

Gaya

Summary

Results-driven Civil Engineer specializing in Structures and Highways, with extensive expertise in quantity estimation, project planning, and site execution. Demonstrated proficiency in design and analysis software, including AutoCAD and Revit Architecture, complemented by strong project management skills utilizing tools such as MS Project. Recognized for a strategic approach to operations management, leveraging analytical abilities to enhance team performance and drive innovative solutions. Committed to continuous growth and excellence, with a solid track record of successful project contributions and adherence to industry best practices.

Overview

10
10
years of professional experience

Work History

Manager (Billing)

NUMBERTREE LLP (Techno-commercial Audit), Lapat Nagar, New Delhi
05.2025 - Current
  • Project: MMRDA/MMRRP/L2B-C101: Part Design and Construction of Balance Works of Package CA04R Elevated Viaduct and 10 Elevated Stations viz. ESIC Nagar, Prem Nagar, Indira Nagar, Nanavati Hospital, Khira Nagar, Saraswat Nagar, National College, Bandra, Income Tax Office & ILFS [Excluding Architectural Finishing & Pre-Engineered Steel Roof Structure of Stations] from Chainage 34+035.873km to Chainage 46+680.384km of Line 28 [D.N. Nagar to Mandale] of Mumbai Metro Rail Project of MMRDA.


  • Project: Development of Four/Six lane Access Control Expressway from Design Chainage Km. 515+000 to Km. 528+300 (Kunjwani to Sidhra Section of NH-44) and from Design Chainage Km. 550+900 to Km. 566+520 (Domel to Katra Section) on Hybrid Annuity Mode under Bharatmala Pariyojana in the UT of Jammu & Kashmir (Phase II Package - XVII).
  • Duration: Oct 2024 to May 2025
  • Location: Jammu, Jammu & Kashmir

Assistant Manager (Billing as a Technical Auditor)

NUMBERTREE LLP
09.2024 - 10.2024
  • Project: Development of Gorakhpur Link Expressway Project(Pakage-1) from Jaitpur(Dist. Gorakhpur) to Fulwariya(Dist. Ambedkar nagar) (Km- 0+817 to Km 47+500) in the state of Uttar Pradesh on EPC Basis.


  • Project: 4-laning of Munger-Mirzachuki(NH-80) Section from Kharia Village Junction to Start of existing Bhagalpur Bypass Design Km 95+580 to Km 125+000) (Pkg-02) on Hybrid Annuity Mode the State of Bihar.
  • Duration: April 2024 to Sep 2024
  • Location: Bhagalpur, Bihar

Sr. Billing & Planning Engineer

BRIJESH AGRAWAL NIRMAAN INDIA PVT. LTD
03.2022 - 04.2024
  • Project: Construction of new 2- Lane Major Bridge with its approaches from design chainage 0+00 to 2+150 across River Sone in the State of Bihar (via Panduka) & Jharkhand under CRIF Scheme on Engineering, Procurement & Construction (EPC) Mode.
  • Project Cost: 144.79 Cr
  • Client: M/s Brijesh Agrawal- PPIL(JV)
  • Project alloted as: Bihar Rajya Pul Nirman Nigam Ltd, Patna (Bihar Govt Undertaking)

Sr. Billing & Planning Engineer

ALLIED INFRASTRUCTURE & PROJECTS PVT LTD
11.2020 - 02.2022
  • Project: Widening to 2 Lane with paved shoulder and geometric improvement of NH - 114A (Deoghar-Madhupur) from 140+000 to 184+000 km under NH- Division Deoghar in the State of Jharkhand under EPC Mode.
  • Project Cost: 147.90 Cr
  • Client: Rodic Consultants Pvt Ltd in JV with TPF GETINSA EUROESTUDIOS.SL

Quantity surveyor & Planning Engineer

ICC INFRA PROJECT INDIA PVT LTD
06.2018 - 10.2020
  • Project: For the construction of Two nos. Bhima River Major Bridges Span length- (46.8m x 7) each, pile foundation 1200mm pile diameter with 46.100m length, 3m heightPSC Girders & Sina River Major bridge Span of (31.5m x 7) open foundation with 30.100m length 2m height PSC Girders, VUP, Culverts as well as Two nos. Skew ROB open foundation span length90m with RCC Girders 14.068m and steel composite girder 60m,height 3.18m for NH-13 (New-NH-52) Six/four laning of Solapur Bijapur Road in the state of Maharashtra and katakana to be Executedas BOT (Toll) project under DBFOT pattern under NHDP Phase-III.
  • Project Cost: 100.19 Cr
  • Client: IJM Infrastructure Limited

Site Engineer

INTERFACE CONSTRUCTION SERVICE
03.2016 - 01.2017
  • Projects: Sri Krishna Spinning Mill at Burhanpur & Walmart warehouse, Indore and other Pre-Engineered industrial buildings
  • Roles & Responsibilities: Execute the Work as per Dwg and standards both discipline (Structural, Architectural Works) of PEB Structure. Supervision for Frame structure form Work, Steel Work, and Concrete. Site Architectural Layout regarding Block Work, Door Windows, Floor Levels, Lintel and Stiffeners. Supervision of Site in planned manner Supervised the progress of construction at different sites Preparing the Client RA Bills & Final Bills Calculating the Quantities for Super-Structure (Shuttering and Concreting). Able to build Detail project report (DPR) of buildings

Site Engineer

PRAHLAD CHOUKSE GOVT.
07.2015 - 03.2016
  • Projects: Various Projects like residential quarters, Approach Road, boundary wall etc. for Project Implementation Unit (PIU), PWD Dhar. Madhya Pradesh.
  • Roles & Responsibilities: Execute the Work as per Drawings and standards both discipline (Structural, Architectural Works) Supervision for Frame structure form Work, Steel Work, and Concrete. Finishing Work (Block Work, Plaster, Every Kind of Flooring). Site Architectural Layout regarding Block Work, Door Windows, Floor Levels, Lintel and Stiffeners.

Education

Degree in Civil Engineering (B. E.) -

Shri Aurobindo Institute of Technology
Indore, MP
08-2015

Intermediate (+2) -

DPS Inter Collage
Gaya, Bihar
03-2011

Matriculation (10th) -

Kendriya Vidyalaya No 1, AMC
Lucknow, UP
03-2008

Skills

  • Quantity Surveyor (QS)- Preparing detailed quantity estimation of Bridge Structures & Highways projects and rate analysis as per market standard
  • Bill of Quantities (BOQ)- Preparing Bill of Quantity as per SOR
  • Billing of Projects: - Preparing bill of Bridge Structures & Highways projects as per contract with price escalation and material reconciliation
  • Cost Analysis and control: - Analysis as per current market price & under CPWD Guidelines
  • Field Survey: - preparing contour, field survey and profile leveling using auto level instrument
  • Project Planning & Scheduling: - Scheduling of project using MSP & Primavera
  • Site Inspection, Supervision, Organizing and Coordination of the site Activities

Software

Auto Cad

MS Project

MS Office

SAP

Languages

Hindi
Bilingual or Proficient (C2)
English
Advanced (C1)

UNDERTAKING

I, the undersigned, certify that to the best of my knowledge and belief these data correctly describe me, my qualification and my experience. Date: ……………. Place: Gaya [Suraj Kumar]

PERSONAL DETAILED

  • Name - Suraj Kumar s/o Shovee Yadav
  • Add - Village- Kharkhura Bhattbigha, Near Sidharth ITI, Kharkhura Main Road & post. R.S Gaya dist.
  • Gaya (Bihar)-823002
  • Nationality- Indian
  • Date of Birth- 14-02-1991
  • Gender- Male
  • Marital Status- married
  • Current salary- 10.20 lacs pa

Timeline

Manager (Billing)

NUMBERTREE LLP (Techno-commercial Audit), Lapat Nagar, New Delhi
05.2025 - Current

Assistant Manager (Billing as a Technical Auditor)

NUMBERTREE LLP
09.2024 - 10.2024

Sr. Billing & Planning Engineer

BRIJESH AGRAWAL NIRMAAN INDIA PVT. LTD
03.2022 - 04.2024

Sr. Billing & Planning Engineer

ALLIED INFRASTRUCTURE & PROJECTS PVT LTD
11.2020 - 02.2022

Quantity surveyor & Planning Engineer

ICC INFRA PROJECT INDIA PVT LTD
06.2018 - 10.2020

Site Engineer

INTERFACE CONSTRUCTION SERVICE
03.2016 - 01.2017

Site Engineer

PRAHLAD CHOUKSE GOVT.
07.2015 - 03.2016

Degree in Civil Engineering (B. E.) -

Shri Aurobindo Institute of Technology

Intermediate (+2) -

DPS Inter Collage

Matriculation (10th) -

Kendriya Vidyalaya No 1, AMC
Suraj Kumar