Project Management and Quality Control professional with over 14 years of experience in underground metro and railway station construction. Proven track record in managing TBM/NATM projects, including emergency exit shafts and cut-and-cover stations. Strong team motivator with a focus on achieving project goals under tight deadlines. Recognized for problem-solving abilities and maintaining a positive work environment.
Overview
14
14
years of professional experience
1
1
Certification
Work History
Resident Engineer Civil-I
Cemosa-Introsoft Consultant Private Limited-JV
02.2025 - Current
Administer EPC and FIDIC-based contracts, including claims management, variation orders, escalation analysis, and dispute resolution. Prepared and reviewed tender documents, assisted in bid evaluation, and supported negotiations with contractors to safeguard client interests.
Validated RA/IPC bills, contractor invoices, and cost claims (₹100-3000 Cr+ projects). Conducted rate analysis, tracked project expenditures, and supported budget control by preparing financial progress reports, forecasting costs, and identifying potential overruns.
Monitored project schedules using Primavera P6 and MS Project, preparing rolling programs, delay letters, and recovery plans. Coordinated with planning engineers for resource leveling, milestone tracking, and early warning of deviations.
To direct multidisciplinary teams (engineers, inspectors, and subcontractors) across the project. Assign tasks, review deliverables, mentor junior engineers, and conduct stakeholder meetings with contractors, consultants, and clients.
Coordinate with the Contractor regarding the inspection sequence for items for each construction/execution activity.
Responsible for general day to day contract administration.
Monitor workmanship and quality control in the Works and issue site inspection (SI) and Non-Conformance (NCR) reports to the Contractor to investigate and rectify faults in the works performed.
Maintaining all necessary documents issuing letters to agencies/contractors regarding work progress and other issues.
Implementing Safety Measures during the works performed at site.
Liaise and daily follow up with the contractor. This is to ensure the contractor is managing its resources, health and safety, and equipment needs on the site.
Maintaining all necessary documents issuing letters to agencies/contractors regarding work progress and other issues.
Assist the Team Leader in the preparation of any correspondences in compliance with the contract documents and site requirements.
Following project schedule and monitoring day to day activities as per ITP, Preparation of weekly & Monthly reports.
Ensure regular interactions and cordial relations with local community representatives and implementation of CSR activities.
Cost of Project: Rs. 616.22 Crores
Sector Expert Civil-I
Assystem-Stup Consultants
10.2023 - 02.2025
Responsible for Preparation of detailed project report including feasibility of the project.
Assist in inviting Bids for DPR consultants.
Preparation of tender document and assist Chief Engineer in monitoring contractual clauses with contractors.
Assist in checking and vetting of detailed estimated of the individual projects.
Approval of Drawings, Quality inspection and testing of various civil engineering material brought by the contractors. Ensure correctness of contractors work during layout and fixing of levels.
Construction Supervision and Monitoring of the progress of the ongoing works.
Acting as a single point of contact between client and contractors for resolving progress related updating sitting at Central Railways HQ office.
Cost of Project: Rs. 2000 Crores
Civil Inspector
Egis India Consulting Engineers Private Limited
Mumbai
09.2022 - 10.2023
Responsible for general day to day contract administration.
Preparing delay letters as per the rolling programs.
Co-ordination & follow up with contractors and client.
Following project schedule and monitoring day to day activities as per ITP, Preparation of weekly & Monthly reports.
Executing planned targets and deadlines for subordinates and contractors.
Checking and preparing DSR (Reply for document submission report) for CRD and Working drawings and for 3Months/3Weeks rolling programs.
Monitor workmanship and quality control in the Works and issue site inspection (SI) and Non-Conformance (NCR) reports to the Contractor to investigate and rectify faults in the works performed.
Inspecting activities performed in casting yard such as inspection of Segment casting, OTE ducts production, curing, stacking& testing works.
Checking of material received on site by field tests / lab tests.
Coordinate with the Contractor regarding the inspection sequence for items for each construction/execution activity.
Cost of Project: Rs. 2713 Crores (Funded by JICA-Japan international Cooperation Agency)
Civil Inspector
Egis India Consulting Engineers Private Limited
Mumbai
01.2020 - 08.2022
Inspection of daily work activities of NATM CPs and Tunnel- TBM.
Monitoring and Inspection of construction works carried out by the contractor on site and resolve the queries by co-ordination with RE or SRE.
Inspect the work done by the contractors to ascertain that work is proceeding in accordance with the Contract Documents and accepted practice.
Attend Site Technical Coordination Meetings to discuss Contractor's submissions, Shop Drawings and construction related matters.
Ensuring performance of work in strict accordance with the drawing and specification.
Verifying all the report and measurements of TBM and NATM works, insuring work comply with operational and safety standard.
Identifying and evaluating construction issue to maintain schedule of project.
Preparing reports & raising NCR related to NATM & TBM tunnels.
Co-ordinate with laboratory in-charge and arrange for sampling and testing of satisfactorily completed work and quality assurance for suspected materials.
Supervise all construction activities carried out by contractor and maintain site resources, daily progress of work, inspection, construction and workshop drawings, method statement and TPIs.
Cost of Project: Rs. 3308 Crores (Funded by JICA-Japan international Cooperation Agency)
Civil Inspector
Egis India Consulting Engineers Private Limited
Mumbai
11.2017 - 12.2019
Monitored project schedules using Primavera P6 and MS Project, preparing rolling programs, delay letters, and recovery plans. Coordinated with planning engineers for resource leveling, milestone tracking, and early warning of deviations.
Validated RA/IPC bills, contractor invoices, and Cost claims (₹100-3000 Cr+ projects). Conducted rate analysis, tracked project expenditures, and supported budget control by preparing financial progress reports, forecasting costs, and identifying potential overruns.
Checking and preparing DSR (Reply for document submission report) for CRD and Working drawings and for 3Months/3Weeks rolling programs.
Monitor workmanship and quality control in the Works and issue site inspection (SI) and Non-Conformance (NCR) reports to the Contractor to investigate and rectify faults in the works performed.
Reporting Inventory, Progress related and technical data on regular basis to Resident engineer, senior resident engineer& Chief resident engineer.
Maintaining all necessary documents issuing letters to agencies/contractors regarding work progress and other issues.
Inspecting activities performed in casting yard such as inspection of Segment casting, OTE ducts production, curing, stacking& testing works.
Checking of material received on site by field tests / lab tests.
Implementing Safety Measures during the works performed at site.
Coordinate with the Contractor regarding the inspection sequence for items for each construction/execution activity.
Cost of Project: Rs. 3110 Crores (Funded by JICA-Japan international Cooperation Agency)
Civil Inspector
Egis India Consulting Engineers Private Limited
Mumbai
04.2016 - 11.2017
Responsible for general day to day contract administration.
Preparing delay letters as per the rolling programs.
Co-ordination & follow up with contractors and client.
Checking and certification of bills of Contractors.
Following project schedule and monitoring day to day activities as per ITP, Preparation of weekly & Monthly reports.
Executing planned targets and deadlines for subordinates and contractors.
Checking and preparing DSR (Reply for document submission report) for CRD and Working drawings and for 3Months/3Weeks rolling programs.
Monitor workmanship and quality control in the Works and issue site inspection (SI) and Non-Conformance (NCR) reports to the Contractor to investigate and rectify faults in the works performed.
Reporting Inventory, Progress related and technical data on regular basis to Resident engineer, senior resident engineer& Chief resident engineer.
Maintaining all necessary documents issuing letters to agencies/contractors regarding work progress and other issues.
Cost of Project: Rs. 3850 Crores (Funded by JICA-Japan international Cooperation Agency)
Project Engineer
B.R. Bhadane Engineers and Contractors
Nasik
01.2015 - 03.2016
Ensure regular interactions and cordial relations with local community representatives and implementation of CSR activities.
Execute cast in Situ Deck Slab Staging Reinforcement fixing, concreting (In Traffic Junction Area).
Executing the heavy launching of the Bridge heavy components during execution with utmost safety.
Execution of bridge construction work.
Assigning and reviewing works to supervisors.
Material inspection and testing.
Checking and finalizing subcontractors' bills of quantities.
Planning and implementing weekly and monthly tasks and tracking progress of works at site.
Handling a team of supervisors and foreman and assigning tasks according to project requirement.
Cost of Project: Rs. 114 Crores
Project Engineer
B.R. Bhadane Engineers and Contractors
Bhusaval district
01.2013 - 12.2014
Execute steel built-up sections and checking of quality of welded and bolted connections. To carry out material testing and sampling as per the material inspection and testing plan.
Witness the pier location markings and setup of the centreline of the structure along with survey team and insure correctness as per the detailed design and drawings.
Executing the heavy launching of the Bridge heavy components during execution with utmost safety.
Execution of bridge construction work.
Assigning and reviewing works to supervisors.
Material inspection and testing.
Checking and finalizing subcontractors' bills of quantities.
Planning and implementing weekly and monthly tasks and tracking progress of works at site.
Handling a team of supervisors and foreman and assigning tasks according to project requirement.
Cost of Project: Rs. 291.56 Crores
Project Engineer
B.R. Bhadane Engineers and Contractors
Nashik
05.2011 - 12.2012
Construction of 7.0m wide Two-lane bridge 247m span overall at Girna River,NH3(Dhule-Nasik National Highway) near Soygaon-Tehare village Dist Nasik under Public works Department-Maharashtra.
Ensure regular interactions and cordial relations with local community representatives and implementation of CSR activities.
Execute cast in Situ Deck Slab Staging Reinforcement fixing, concreting.
Executing the heavy launching of the Bridge heavy components during execution with utmost safety.
Execution of bridge construction work.
Assigning and reviewing works to supervisors.
Material inspection and testing.
Checking and finalizing subcontractors' bills of quantities.
Planning and implementing weekly and monthly tasks and tracking progress of works at site.
Handling a team of supervisors and foreman and assigning tasks according to project requirement.
Cost of Project: Rs. 96 Crores
Education
B. Tech - Civil Engineering
North Maharashtra University
07.2011
Skills
Contract administration
Claims management
Cost estimation
Project scheduling
Quality control
Civil engineering
Affiliations
ASCE (Student)
ICE (Student)
Certification
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.
I undertake that I have no objection in uploading/hosting of my credentials by Authority in public domain.
I am willing to undertake the assignment and ensure my availability for the duration of the assignment.
I have no history of involvement in Vigilance/CBI/Police Case, resulting in major penalty punishment of removal/ dismissal/ compulsory retirement or conviction.
I have never been debarred from providing consultancy services by any government authority/PSU.
Personal Information
Date of Birth: 09/02/88
Gender: Male
Nationality: Indian
Marital Status: Married
Languages
English-Good,Hindi-Good,Marathi-Good
Projects
Major Up-gradation of Jaipur Railway Station of North Western Railway, 02/01/25 to Present, Jaipur, Rajasthan, Cemosa-Intrasoft JV, Resident Engineer Civil-I, Rs. 616.22 Crores Rail Route Expansion and Station development Projects-Central Railways, 10/01/23 to 02/28/25, Mumbai, Maharashtra, Assystem-Stup Consultants, Sector Expert Civil-I, Rs. 2000 Crores Construction Supervision for Girgaon & Kalbadevi Metro Station, 09/01/22 to 10/31/23, Mumbai, Maharashtra, Egis-India Consulting Engineers Pvt. Ltd., Civil Inspector-L3, Rs. 2713 Crores Construction of Tunnel 2.8Km by TBM-Terratec under Mula River, 01/01/20 to 08/31/22, Mumbai, Maharashtra, Egis-India Consulting Engineers Pvt. Ltd., Civil Inspector-L3, Rs. 3308 Crores Construction and Supervision for CST Metro Station, 11/01/17 to 12/31/19, Mumbai, Maharashtra, Egis-India Consulting Engineers Pvt. Ltd., Civil Inspector-L3, Rs. 3110 Crores Construction and Supervision for BKC Metro Station, 04/01/16 to 11/30/17, Mumbai, Maharashtra, Egis-India Consulting Engineers Pvt. Ltd., Civil Inspector-L3, Rs. 3850 Crores Construction of 4-Lane Bridge at Malegaon City Dist. Nashik, 01/01/15 to 03/31/16, Nasik, Maharashtra, B.R. Bhadane Engineers and Contractors, Project Engineer, Rs. 114 Crores Construction of Major Bridge Railway at Hatora Village, Bhusaval District, 01/01/13 to 12/31/14, Bhusaval, Maharashtra, B.R. Bhadane Engineers and Contractors, Project Engineer, Rs. 291.56 Crores Construction of Two-Lane Bridge at Girna River, Malegaon, Nashik, 05/01/11 to 12/31/12, Nashik, Maharashtra, B.R. Bhadane Engineers and Contractors, Project Engineer, Rs. 96 Crores
Training
Tendering Estimation and Quantity Survey under-Skill India Certification Delhi.
Roles And Responsibilities
Contract & Commercial Management: Administer EPC and FIDIC-based contracts, including claims management, variation orders, escalation analysis, and dispute resolution. Prepared and reviewed tender documents, assisted in bid evaluation, and supported negotiations with contractors to safeguard client interests.
Financial Oversight & Cost Control: Validated RA/IPC bills, contractor invoices, and cost claims (₹100-3000 Cr+ projects). Conducted rate analysis, tracked project expenditures, and supported budget control by preparing financial progress reports, forecasting costs, and identifying potential overruns.
Project Planning & Scheduling: Monitored project schedules using Primavera P6 and MS Project, preparing rolling programs, delay letters, and recovery plans. Coordinated with planning engineers for resource leveling, milestone tracking, and early warning of deviations.
Quality Assurance & Technical Compliance: Implemented QMS/QC procedures across tunnelling, station, and bridge works, ensuring compliance with specifications (QCS, MST, ITP, shop drawings). Led third-party audits, material testing, NCR/CA-PA processes, and ensured strict adherence to safety and quality standards.
Leadership & Team Management: Directed multidisciplinary teams (engineers, inspectors, and subcontractors) across metro, rail, and bridge projects. Assigned tasks, reviewed deliverables, mentored junior engineers, and conducted stakeholder meetings with contractors, consultants, and clients.
Client & Stakeholder Coordination: Acted as a single point of contact between Client, Contractor, and Authority. Handled correspondences, progress meetings, and technical submissions, ensuring timely approvals and minimizing disputes.
Construction Supervision: Oversaw critical works including TBM/NATM tunneling, cut-and-cover stations, structural concreting, track installation, signaling integration, bridges, and utilities shifting. Ensured works adhered to schedule, cost, and quality benchmarks.
Documentation & Reporting: Maintained PMIS/document control for correspondence, progress reporting, and compliance logs. Prepared weekly/monthly reports, delay notifications, and financial updates for client and management.
Turning and Milling Technician at International aerospace manufacturing private limited (jv between Rolls and Royces /HAL)Turning and Milling Technician at International aerospace manufacturing private limited (jv between Rolls and Royces /HAL)