G SURESH

Deputy Manager
GUNAMANGALAM

Summary

Proactive manager with demonstrated leadership abilities, strategic planning expertise and problem-solving acumen. Assists senior managers with accomplishing demanding targets by encouraging staff and coordinating resources. Methodical and well-organized in optimizing coverage to meet operational demands.

Overview

13
13
years of professional experience

Work History

Deputy Manager

WKT Enviro system pvt ltd
5 2024 - Current
  • ETP, WWTP, STP, DM Project, ZLD, and O&M support.
  • Improved team efficiency by streamlining processes and implementing innovative management strategies.
  • Identified areas for improvement within the department, implementing strategic initiatives to address gaps in performance or resources.
  • Responsible for all utility operations, including water treatment, wastewater treatment, water distribution, Cooling Tower, customer service, and permitting 40 employees.
  • Developed a ₹22 million budget projects.
  • Lead the day-to-day working of the Waste Water Treatment facility - Primary and Secondary, providing necessary leadership for operation of the Primary Treatment, Aerobic biological systems for wastewater treatment, and technical support when necessary.
  • Responsible for managing, treating, and disposing of all hazardous and non-hazardous waste from the plant, as required by regulatory requirements.
  • All aspects related to setting up the procedures and systems for the function as per the requirements given by the Site Head.
  • Knowledge and experience of analysis of Waste Water Chemistry: COD, BOD, TDS, TSS, TDVSS, MLSS, MLVSS, VFA, etc.
  • Knowledge and exposure to Environment Management System ISO 14001:2004.
  • Knowledge of troubleshooting in Waste Water Treatment facility.
  • Preparing and communicating, and maintaining daily and monthly wastewater analysis reports.
  • All chemicals consumption should be maintained within norms.
  • Electrical power consumption should be as per specification and optimized.
  • No occurrence, incident, or accident.


  • Implementation of 5S consent in plant area.


.



Senior Engineer

KLJ Petroplast Limited
11.2021 - 04.2024
  • ETP, WWTP, STP, MEE, ATFD, DM and Cooling tower, Compressor unit

Plant Operator

ECO CARE ENGG PRIVATE LTD
06.2024 - 02.2024
  • ETP, ZLD, STP TTRO, Desalination

Senior CONTROL ROOM Engineer

AR ENTERPRISSES (BGR ENERGY SYSTEM LTD)
10.2019 - 11.2021
  • Tertiary treatment

Site Engineer

LALBUKSH VOLTAS ENGINEERING SERVICES TRAD L.L.C
03.2013 - 03.2019
  • Desalination, STP, WWTP, Drinking water plant

Shift Incharge

ECO CARE ENGG PVT LTD
03.2012 - 02.2013
  • Waste water recycling RO plant

Education

Diploma - Petrochemical Engineering

CPCL Polytechnic College
Chennai, India
04.2001 -

Skills

Performance Improvements

Cost analysis and savings

Process and procedure development

Decision-making capabilities

Operations Management

Task Delegation

Project Management

Cost Reduction

Carrierobjective

To seek a challenging role in a well reputed organization, Where I can expose my talents and with a hard work for the growth of the organization.

Apprenticetraining

CRUDE DISTILATION UNIT & PROCESS ENGINEERING Dept in the CPCL (Oct 2007 - Oct 2008).

Professionalexperienceandresponsibility

  • Kick off meeting with Client and vendor.
  • Weekly and daily review meetings.
  • Project detailed schedule preparation.
  • RFQ floating and techno commercials offer comparison preparation. Ensure that the products meet the technical specifications.
  • Project cash inflow & outflow sheet review management.
  • Preparation of Dispatch item protocol and check list review.
  • Ensure that all the resources, manpower available at the site by directing the daily meeting.
  • The invoice follows up for client and vendors.
  • The project was completed within the timeline by directing the team as per 5S.
  • To ensure that the site team is adhering to the safety.
  • Equipment’s design review with superiors’ procurement and commissioning Such as HRSCC, Aeration, UASBR, MBBR, UF, RO, DM unit, MEE & ATFD, Cooling tower etc with the help of Project coordinator.
  • Floating of RFQ to all the vendors, Preparing PDS, MDS sheet with coordination of Project head and detail engineering vendor.
  • Vendors Plant design basis calculation to be verified with Superiors.
  • Reviewing all the vendor technical offers with PDS & MDS sheet and Making Techno-Commercial offers comparison.
  • Coordinating with vendors to receive all the material within the time as per PO terms.
  • Reviewing the vendor Schedule for erection & commissioning to complete the project within the time.
  • To maintain the material tracking sheet for all the plants.
  • Material inspection arrangement as per QAP.
  • P&ID, PFD, equipment layout review and comments.
  • To maintain the checklist for equipment erections and structure etc.
  • Making SOP and Logics conditions making with project coordinator.
  • Preparing Monthly Annual O&M Cost sheet like Power, Steam, Consumables, Chemicals & Manpower etc.
  • Operation of the above-mentioned plants in compliance with standardized procedures to maintain process and quality parameters.
  • Troubleshooting of equipment failures, preparing route cause analysis and steps to fix.
  • Preparing Daily, Monthly and Annual O&M Cost sheet like Power, Steam, Consumables, Chemicals & Manpower etc.
  • Ensuring and improving the recycling system to reduce the raw material consumption.

Personal Information

  • Passport Number: S9531281
  • Father's Name: N. GANESAN
  • Date of Birth: 06/28/88
  • Nationality: Indian
  • Religion: Hindu

Languages

Tamil
English
Hindi

Timeline

Plant Operator

ECO CARE ENGG PRIVATE LTD
06.2024 - 02.2024

Senior Engineer

KLJ Petroplast Limited
11.2021 - 04.2024

Senior CONTROL ROOM Engineer

AR ENTERPRISSES (BGR ENERGY SYSTEM LTD)
10.2019 - 11.2021

Site Engineer

LALBUKSH VOLTAS ENGINEERING SERVICES TRAD L.L.C
03.2013 - 03.2019

Shift Incharge

ECO CARE ENGG PVT LTD
03.2012 - 02.2013

Diploma - Petrochemical Engineering

CPCL Polytechnic College
04.2001 -

Deputy Manager

WKT Enviro system pvt ltd
5 2024 - Current
G SURESHDeputy Manager