Dedicated and Detail-oriented Maintenance Engineer bringing 10 years of positive maintenance team leadership. Commended for quality performance and reliability demonstrated over 12 years of field experience. Strong knowledge of preventive maintenance scheduling as well as unscheduled repairs to minimize downtime. Highly skilled with commitment to quality and efficiency.
Overview
13
13
years of professional experience
1
1
Certification
Work History
Maintenance Supervisor-Utilities
HARMAN INTERNATIONAL (By SAMSUNG ) Pvt .Ltd Chakan, Pune
06.2017 - Current
Supervised a 15 member utility maintenance team, including preventive maintenance projects, employee tasks and performance.
Collected data to compile a weekly report for upper management and closely monitored equipment, tools and system upgrades for capital planning.
Collaborated with management, staff, and contractors to diagnose long-term resolution for the equipment such as cooling towers, chillers and air handlers.
Coordinated with outside vendors/contractors to prepare for installations, repairs and preventive maintenance such as Trane, Johnson Controls, Master Clean, and Ener-G-Test.
Monitored maintenance scheduling with other groups and staff on the Masonic Campus
Managed team of employees, daily and scheduled work orders though WorxHub-work order system
Delegated daily urgent tasks to the team to get equipment repaired in a timely manner for the residents and staff.
Research blueprints, contracts, proposals, and manuals to determine the best approach on projects and preventative maintenance.
Works with computer programs such as WorxHub, Workday, Kronos, Trane Tracer, Microsoft Office(Outlook, Word, Excel, One Drive)
Monthly fallowing validation schedule ESD mat, particle count testing & lux level data of related clean room of electronic production and its Audit document preparation & attend of ESD 2020, Safety and FM Global.
Supervise troubleshooting; breakdown maintenance, preventive maintenance & corrective action of Electrical Power, distribution system dry type 1600 KVA transformers testing ref IS6792-1992, ups , Lift
Optimize equipment according to standard procedure, enhancing performance and product quality, ensuring the achievement of all Key Performance Indicators (KPI).
Energy data tracking in each shift and validate the load vs actual reading.
Critical & non critical Spare management handling from end to end .
Fallowing Audit documents and responsibility – ISO 45001-2018 (OHSMS) & ISO 14001-2015 (EMS), IATF 16949 Audit, ESD S 20.20 Audit, Electrical Inspector Audit, FM Global.
Monthly MIS Data prepare, MTTR & MTBF Data, DG Return documents, History Card for plant each equipment’s. Form 11_ Lifting equipment testing, .Form 13 Pr testing, Vibration analysis , Harmonic & thermography report validation .
Scrap note , SLD and Plant Electrical load data tracking.
Spare order and stock maintain , dealing with supplier and purchase departments.
Tracked and managed department costs for good budget adherence.
Scheduled and oversaw maintenance, repair and installation activities.
Utilized proper tools and materials to adhere to safety guidelines.
Electrical Maintenance Engineer
GE (General Electrical) India Industrial Pvt Ltd,
01.2014 - 06.2017
Communicated effectively with coaches and fellow athletes, including organizing meetings, training and coaches manuals.
Explained rules, regulations and league guidelines to players and coaches.
Repaired and maintained facility and sports equipment. Scheduling workday with volunteers or contractors.
Managed program's budget.
Placed orders for sporting goods equipment and uniforms, while maintaining accurate records on equipment inventory.
Inspected equipment every week to maintain working order.
Reviewed technical documentation to complete equipment maintenance and repair.
Developed preventive maintenance schedules to minimize downtime and optimize performance.
Supervise Installation, commissioning, troubleshooting, breakdown maintenance, preventive maintenance & corrective action of Utility Equipment of LT 3 Phase motor up to 750 kw 440 VAC, 690 VA .