I have two years of experiences in bridges as well as Metro projects. Actively involved with the preliminary and detailed engineering of bridge design, coordination and rehabilitation, as well as on-site inspection of old Bridges. Structure type varied from Reinforced concrete to pre-stressed concrete construction and extradosed bridge. Involved in overall design of various Bridge Structures, reviewing design and drawings. Perform project progress track and involved in project plan, project progress track and project coordination. I was a part of quality team, achieving quality start for several times. Also gained the ‘Outstanding' rating in yearly performance in 2021-22 on October'2022.
Project: GREATER MALE' CONNECTIVITY - MALE' TO THILAFUSHI LINK PROJECT
Client: Ministry of National Planning, Housing and Infrastructure Government of Maldives
Main project features: The proposed bridge structures for MTL are mainly comprised of three navigation bridges across the deep channel between four islands, marine viaduct in deep water, marine viaduct in shallow water or on land, in-situ deck for ramps, and in situ voided slab at abutments. Eurocodes has been followed for this bridge design.
Position held: Design Engineer
Role: Responsible of design and drawing of superstructure and substructure of 4 span module with 3 prestress box girder (1 main bridge and 2 ramp) joined by in-situ stitch.
Project: ETIHAD RAIL OVER-BRIDGE NETWORK
Client: Etihad Rail
Main project features: The Overall Etihad Rail Network comprises a proposed railway network, which will link freight facilities and passenger stations, and form a part of the planned Gulf Cooperation Council (GCC) railway network.
Position held: Structural Engineer
Role: Responsible for line and grillage modelling and analysis of two different module of the JART Rail over-bridge, each having 4 to 5 spans of nearly 50 m. Analyzing the different variations in superstructure, irregular curvatures and behaviors of both superstructure and substructure and give comments on design in a very short time span.
Project: KOLKATA METRO
Client: KMRCL
Main project features: Underground Metro Project containing four underground stations, cut and cover tunnel, ramp, launching shaft, retrieval shaft.
Position held: Design Engineer
Role: Responsible for designing different structural components of underground station and ancillary building including D-wall, slabs, beam, column and responsible for BOQ preparation for stations and above ground structures
Project: DHUBRI BRIDGE PROJECT IN THE STATE OF ASSAM / MEGHALAYA ON NH-127B (LENGTH – 19.282 KMS)
Client: National Highways & Infrastructure Development Corporation Limited (NHIDCL)
Main project features: NHIDCL is currently constructing India's longest road bridge. This bridge between Dhubri and Phulbari includes viaduct and extradosed bridge. Dhubri end to Phulbari end includes 5.735 km. viaduct with 100 pile foundation and 12.625 Km extradosed bridge portion with 100 well foundation.
Position held: Structural Engineer and Deputy Design Coordinator
Role: Responsible for review of design and drawing from contractor, design coordination between client and contractor, project progress track and monitoring and involved in project plan and quality team.
Project Name : CONDITION SURVEY, PREPARATION OF AS-BUILT DRAWINGS, REHABILITATION SCHEME ON 4 NOS. OF OLD MAJOR BRIDGES
Client: Shree Jagannath Expressways Pvt. Ltd
Main project features: Condition survey of the four major bridges, preparation of as built drawings, Structural Modelling, NDT & providing Rehabilitation scheme. Four Bridges under this rehabilitation scheme are as follows: Kuakhai Bridge, Kathjodi Bridge, Mahanadi Bridge and Birupa Bridge
Position held: Structural and quality and Engineer
Role: Responsible for preparing Project plan, on Site inspection and conducting various non-destructive tests of four Bridges, preparation of BOQs for Health monitoring Works.
MIDAS Civil
Quality Star
Project: KOLKATA METRO
Duration: May 2022 to Present
Client: KMRCL
Main project features: Underground Metro Project containing four underground stations, cut and cover tunnel, ramp, launching shaft, retrieval shaft.
Position held: Design Engineer
Role: Rresponsible for designing different structural components of underground station and ancillary building including D-wall, slabs, beam, column and responsible for BOQ preparation for stations and above ground structures.
Project: ETIHAD RAIL NETWORK (Stage 2 & 3)
Duration: June 2022 to August 2022
Client: Etihad Rail
Main project features: The Overall Etihad Rail Network comprises a proposed railway network, which will link freight facilities and passenger stations, and form a part of the planned Gulf Cooperation Council (GCC) railway network.
Position held: Structural Engineer
Role: Rresponsible for line and grillage modelling and analysis of two different module of the JART Rail over-bridge, each having 4 to 5 spans of nearly 50 m. Analysing the different variations in superstructure, irregular curvatures and behaviours of both superstructure and substructure and give comments on design in a very short time span.
Project: GREATER MALE' CONNECTIVITY - MALE' TO THILAFUSHI LINK PROJECT
Duration: February 2022 to June 2022
Client: Mministry of National Planning, Housing and Infrastructure Government of Maldives
Main project features: The proposed bridge structures for MTL are mainly comprised of three navigation bridges across the deep channel between four islands, marine viaduct in deep water, marine viaduct in shallow water or on land, in-situ deck for ramps, and in situ voided slab at abutments. Eurocodes has been followed for this bridge design.
Position held: Design Engineer
Role: Rresponsible of design and drawing of superstructure and substructure of 4 span module with 3 prestressed box girder (1 main bridge and 2 ramp) joined by in-situ stitch.
Project: DESIGN, ENGINEERING, PROCUREMENT, SUPPLY AND CONSTRUCTION OF FOUR LANE BRIDGE INCLUDING APPROACHES OVER RIVER BRAHMAPUTRA BETWEEN DHUBRI ON THE NORTH BANK AND PHULBARI ON THE SOUTH BANK IN THE STATE OF ASSAM / MEGHALAYA ON NH-127B (LENGTH – 19.282 KMS)
Duration: February 2021 to January 2022
Client National Highways & Infrastructure Development Corporation Limited (NHIDCL)
Main project features: National Highways & Infrastructure Development Corporation Limited (NHIDCL) is currently constructing India’s longest road bridge. This bridge between Dhubri and Phulbari includes construction of Dhubri side viaduct and Phulbari side viaduct and in between extradosed bridge. Dhubri end to Phulbari end includes 5.735 km. viaduct with 100 pile foundation and 12.625 Km extradosed bridge portion with 100 well foundation.
Position held: Structural Engineer and Deputy Design Coordinator
Role: Rresponsible for review of design and drawing from contractor, design coordination between client and contractor, project progress track and monitoring and involved in project plan and quality team.
underground stations & depot. This Contract PCDD-01 from Danapur Station to Mithapur Station which includes 6 underground stations, 7 elevated stations, tunnel, ramp. Viaducts
Position held: Design Engineer
Role: Responsible for reviewing of model, design of various structural components, review of drawings.
Project Name: CONSULTANCY SERVICES FOR CONDITION SURVEY, PREPARATION OF AS-BUILT DRAWINGS, SIMULATION, AND NUMERICAL MODELLING, PROVIDING REHABILITATION SCHEME ON 4 NOS. OF OLD MAJOR BRIDGES
Duration: Oct 2020 to Dec 2020
Client: Shree Jagannath Expressways Pvt. Ltd
Location: Orissa, India
Main project features: Condition survey of the four major bridges, preparation of as built drawings, Structural Modelling, NDT & providing Rehabilitation scheme. Four Bridges under this rehabilitation scheme are as follows: Kuakhai Bridge: Length 517.73m Span arrangement (15 x 31.8) + (2 x 15.5) m
Kathjodi Bridge: Length 861.09m Span arrangement (17 x 48.77) + (2 x 16) m
Mahanadi Bridge: Length 2253.20m Span arrangement (45 x 49.38) + (2 x 15.54) m
Birupa Bridge: Length 529.15m Span arrangement (15 x 32.92) + 24.63 + 10.72m
Position held: Quality Engineer
Role: Responsible for preparing Project plan, on Site inspection and conducting various non-destructive tests of four Bridges, preparation of BOQs for Health monitoring Works.
Member of the Tunneling Association of India
Quality Star
Professional in Project Planning and Management
Diploma in Building Design