Summary
Overview
Work History
Education
Skills
Declaration
Section name
Timeline
Generic
SWARUP PATRA

SWARUP PATRA

Survey Manager
Hooghly

Summary

Dedicated to acquiring knowledge and enhancing skills within a professional environment, with a strong commitment to benefiting both the organization and society. Focused on delivering exceptional project details and maintaining the highest standards throughout all phases of work, ensuring client satisfaction remains a top priority. Committed to aligning quality services with organizational goals and aspirations, striving for excellence in professional practice. Passionate about contributing to the achievement of organizational objectives while fostering a culture of continuous improvement and innovation.

Overview

17
17
years of professional experience
1
1
Language

Work History

Manager

HMM INFRA LTD
05.2025 - Current
  • Project: CONSTRUCTION OF 2 LANE 386 MTR LONG EXTRADOSED BRIDGE OVER RIVER SIANG AT DESIGN KM 2+908 AND 63.50 MTR SPAN MAJOR BRIDGE AT DESIGN KM 2+590 IN BETWEEN KM 118.8 JUNCTION OF NH - 513 WITH YINGKIONG TO MOYING VILLAGE JUNCTION AT KM 93.50 ON DITTE-DIMME-MIGGING ROAD UNDER 761 BRTF OF PROJECT BRAHMANK IN ARUNACHAL PRADESH STATE ON EPC MODE
  • Client: Border Road Organization Ministry of Defense Government of India
  • Project Cost: 124 Cr
  • Department: Survey
  • Projects Details: This project has 386M Extradosed Bridge (Span arrangement 63m+260m+63m) & 63.5M Major Bridge.
  • Responsibilities: Coordinate with the design team. Analyze the construction sequence data as well as monitoring each & every stage of it. Monitoring the Geometric control of Extradosed Bridge. Extradosed segment casting data & launching data preparation.
  • Conducted quality control checks on surveying work, ensuring that it was accurate and met the project requirements. Analyzed survey data and prepared reports and drawings using surveying software, such as AutoCAD and Civil 3D. Worked closely with the project head to ensure that surveying work was completed on time. Assisted in the management of survey teams, providing guidance and support to junior surveyors.

Manager

DILIP BUILDCON LTD
01.2023 - 04.2025
  • Project: Construction of New Link NH-133B from Km 0.200 (Km 200.700 of Shaibganj Bypass) in Jharkhand to Km 15.885 (Km25.240 of NH-131A) including Ganga Bridge and Construction of Manihari Bypass from Km 0.000 (Km 25.240 of NH-131A) to Km 5.500 (Km 34.100 of NH-131A near Narenpur) and widening of NH-131A from Km 5.500 (Km 34.100 of NH-131A) to Km 6.000 (Km 34.600 of NH-131A) in the state of Bihar to 4 lane Standards on EPC Mode
  • Client: National Highway Authority of India (NHAI)
  • Project Cost: 1900.8 Cr
  • Consultant: M/s S.A. Infrastructure Consultants Pvt Ltd
  • Department: Survey
  • Projects Details: This Projects Having 8.81Km Structure length & 12.878 Greenfield Highway 21.685km
  • Extradosed Bridges 15 Module (110+180+110) Mtr, 46 Well Foundation. 45 Spans with 1740 Extradosed segment (6Km)
  • Viaducts Having 44 spans 45.
  • Major bridge 1(10
  • 30Mtr spans)
  • Underpass Nos 09
  • Minor bridges Nos 09
  • Box culvert Nos 29
  • Rob Nos 02
  • Responsibilities: Coordinate with the design team. Analyze the construction sequence data as well as monitoring each & every stage of it. Monitoring the Geometric control of Extradosed Bridge. Well shrinking report preparation. Extra dosed precast segment casting data & launching data preparation.
  • Conducted quality control checks on surveying work, ensuring that it was accurate and met the project requirements. Analyzed survey data and prepared reports and drawings using surveying software, such as AutoCAD and Civil 3D. Worked closely with the project head to ensure that surveying work was completed on time. Assisted in the management of survey teams, providing guidance and support to junior surveyors.
  • NOTE: This project has 6Km Extradosed Bridge Well Foundation 46 & Viaduct 45 piers with pier cap.

Manager

DILIP BUILDCON LTD
01.2020 - 01.2023
  • Project: Six Lanning from Nidagatta to Mysore section from-KM 74+200 to 135+304 of NH-275 in the state of Karnataka to be executed hybrid annuity mode.
  • Client: National Highway Authority of India (NHAI)
  • Consultant: MSV International
  • Project Cost: 2700Cr
  • Department: Survey
  • Projects Details: This Projects Having 2nos of Bypass Mandya Bypass (10.04KM) & Srirangapatna Bypass (8.194 KM) Elevated Corridor -3.380km (35 each span 1440 no’s precast spine segment)
  • BOX CULVERT Nos 44
  • CUP Nos 07
  • LVUP Nos 11
  • AOP No 01
  • AUP No 01
  • PUP Nos 05
  • VOP Nos 02
  • VUP Nos 20
  • MNB No 24
  • MJB Nos 06
  • ROB Nos 02(63MTR 70 MTR railway span with Bosting Girder)
  • Responsibilities: Supervising field crews, including surveyors and assistants, during data collection. Processing and analyzing survey data using specialized software. Processing and analyzing survey data using specialized software. Explaining technical survey concepts to clients in a clear and understandable manner.
  • Precast segment casting data & segment launching data preparation. Traverse correction, TBM correction, structure layout preparation.

Chief Surveyor

DILIP BUILDCON LTD
01.2017 - 01.2020
  • Project: Rehabilitation and up-gradation of NH-4 from km. 172+000 km. 219+687 (Total Length of 47.687 km.) from Nalagampalli to Allkuppam (AP/KA Border) Four Lane rigid Pavement with Paved Shoulder in the state of Andhra Pradesh under NHDP-IV on EPC Mode.
  • Client: National Highway Authority of India (NHAI)
  • Consultant: Aarvee Associates
  • Project Cost: 503 Cr
  • Department: Survey
  • Projects Details: The project includes one major bridge, 5 minor bridges, 43 culverts, 12 vehicular underpasses, six cattle/pedestrian underpasses, 10 bus bays, and 10 kilometers long bypasses.
  • Responsibilities: Managing survey team. Coordinate with clients. Traverse correction, TBM correction, structure layout preparation & level sheet preparation for highway team.

Sr. Surveyor

DILIP BUILDCON LTD
01.2016 - 01.2017
  • Project: 4-Lanning of Lucknow-Sultanpur section of NH-56 From Km 11+500 to Km 138+927 In the State of UP Under-NHDP Phase-IV through Public Private Partnership (PPP) on Hybrid Annuity Mode
  • Client: National Highway Authority of India (NHAI)
  • Consultant: Segmental consulting infrastructure pvt. Ltd
  • Project Cost: 2024Cr
  • Department: Survey
  • Projects Details: The project includes 13 major bridges, one railway over bridge, 259 culverts, four vehicular underpasses, six cattle/pedestrian underpasses, 43 bus bays, two truck lay byes, and 32-kilometer-long bypasses.
  • Responsibilities: TBM fly, OGL recording, Gps traversing, structure layout with total station. Traverse correction, Structure layout preparation in Auto cad. Row fixing etc.

Surveyor

DILIP BUILDCON LTD
01.2014 - 01.2016
  • Project: Rehabilitation and upgrading to 2 lanes/ 2 lanes with paved shoulders Configuration and strengthening of Pratapgarh-Padi Section (km 80.00 to km 180.00) of NH- 113 in the state of Rajasthan. Under phase-1 of NHIIP
  • Client: National Highway Authority of India (NHAI)
  • Consultant: ICT
  • Project Cost: 300Cr
  • Department: Survey
  • Projects Details: The project includes 8 major bridges, 34 minor bridges, 112 box culverts, cattle underpasses, 10 bus bays, one truck lay byes, and 15-kilometer-long bypasses.
  • Responsibilities: TBM fly, OGL recording, Gps traversing, structure layout with total station. Traverse correction, Row pillar fixing, TBM pillar fixing etc.

Asst. Surveyor

C.E. TESTING COMPANY PVT LTD
01.2009 - 01.2014
  • Project: Agartala Airport topography survey in the state of Tripura of (AAI), H.T line topography survey, Williamnagar to Nongstoin, Williamnagar to Tura in the state of Meghalaya (Power Grid), Jogighopa to Bongaigaon railway topography survey in the state of Assam (NFR), HN road topography survey
  • Client: NHAI, NFR, AAI, POWER GRID
  • Department: Survey
  • Responsibilities: TBM fly, OGL recording, Gps traversing, topography survey with total station. Traverse correction. Fixing DGPS points. TBM pillar fixing. Preparation of DPR drawing in Auto cad.

Education

B. TECH - CIVIL ENGINEERING

JRN Rajasthan Vidyapeeth University
01.2014

ITI - Survey

EITI
01.2009

Higher secondary Education -

West Bengal Board
Hooghly
01.2006

secondary Education -

West Bengal Board
Hooghly
01.2004

Skills

AutoCAD design skills

Declaration

Declaration: I hereby certify that all the information provided above is true to the best of my Knowledge. Regards, Swarup patra

Section name

  • Personal Details: - SWARUP PATRA S/O-Mr. Kashinath Patra Address: - Jangal Para Dist.-Hooghly, WB (India) PIN - 712401
  • Personal Assets:- Good communication skills. Smart working and focused. Strong believer in team work. Capability to handle pressure situations.
  • Marital Status: - Married
  • Experience: -16years+

Timeline

Manager

HMM INFRA LTD
05.2025 - Current

Manager

DILIP BUILDCON LTD
01.2023 - 04.2025

Manager

DILIP BUILDCON LTD
01.2020 - 01.2023

Chief Surveyor

DILIP BUILDCON LTD
01.2017 - 01.2020

Sr. Surveyor

DILIP BUILDCON LTD
01.2016 - 01.2017

Surveyor

DILIP BUILDCON LTD
01.2014 - 01.2016

Asst. Surveyor

C.E. TESTING COMPANY PVT LTD
01.2009 - 01.2014

B. TECH - CIVIL ENGINEERING

JRN Rajasthan Vidyapeeth University

ITI - Survey

EITI

Higher secondary Education -

West Bengal Board

secondary Education -

West Bengal Board
SWARUP PATRASurvey Manager