Sam Fire .jpg (JPEG Image, 2469 × 3504 pixels) — Scaled (30%) file:///C:/Users/Windows/Desktop/field%20op/MY%20DOCUMENT...of 2 6/22/2023, 12:21 PM
Sam Fire .jpg (JPEG Image, 2469 × 3504 pixels) — Scaled (30%) file:///C:/Users/Windows/Desktop/field%20op/MY%20DOCUMENT...of 2 6/22/2023, 12:21 PM, Kondam
Digitally signed
by Santosh
Production Operator
02.2023
Job overview
Schlumberger-PrivateSchlumberger-Private
Course Completed
SAFETY COURSE
Permit to Work System (PTWS)
Authorized Gas Tester (AGT)
Safety Courses
Fire Prevention and Fire Fighting(FPFF)
Elementary First Aid (EFA)
Personal Survival Techniques(PST)
Personal Safety & Social Responsibilities
Bosiet opito approved(Validity: 23-09-2025) UGK Medical Still valid
JOB RESPONSIBILITIES:
Agree commissioning scope
Support design at: Hazard Study, P&ID reviews, Layout reviews, 3-D Model reviews
Compile commissioning resource plan
Determine handover philosophy
Determine plant acceptance criteria
Confirm product validation criteria
Compile initial commissioning philosophy
Systemize the plant
Compilation of the commissioning manual
Period for selection and appointment of the commissioning team
Develop detailed commissioning plan
Training period for the commissioning team
Agree operating procedure production requirements by commissioning team
Compile commissioning documentation
Compile training manuals
Compile Operating Procedures
Commissioning schedule: Ⅱ
Attendance at factory acceptance tests and inspections
Train plant and maintenance operatives
Check construction progress
Test and clean pipe and equipment – per system
Dry” functional tests (e.g
Loop tests, rotating direction tests, cold alignments)
Refractory dry out work requires a specific dry out process to avoid cracks because of
evaporating water
Leak tests (e.g
Tubes of heat exchangers) to locate repair scope
Leak tests of manholes prior to catalyst filling or for low pressure systems
Schlumberger-PrivateSchlumberger-Private
Special attention to flange surfaces
Special attention to the gasket(s)
Special attention to the tightening procedure
Blowing, post-work cleaning, packing and internal installation
Catalyst loading
Reduction of catalyst: Most of the catalysts in ammonia plants are delivered in the oxidized form and
must be reduced by application of hydrogen
In most cases this commissioning step takes place after
most parts of the plant have been commissioned and plant is in startup operation
Lubricants, oils, cooling media etc
In test plant utilities
Electrical energization and utilities introduction sequentially
Receive discipline approvals
Punchlist – per system
Loop testing – per devise, per system
Motor rotation checks – per item within a system
Turbine and compressors checks
In many cases commissioning of turbines and compressors
requires the availability of high and medium pressure steam
Therefore, these commissioning
activities, machine control and interlock tests are performed also during the start-up of the plant
Leak testing – per system
Drying of functional systems (Check for the quality of drying can be performed by measurement of
dew point (recommendation below -20 C)
Purging of functional systems
Sequence check-out without chemicals
Commissioning on safe chemicals, water commissioning – per system
Utility system start – up
o Instrument air system
o Cooling water
o Nitrogen grid
o Steam for heat purposes
Loop tuning within a system
Testing of control sequence s, interlocks and shut-down systems on safe chemicals
Heat tracings and heaters are taken into service
Burners check: during the commissioning of the burners, control interlock sequences as well
as performance parameters, like flame shape and colour are checked
Lubrication units (joint check plant operator with vendor)
Complete all PSSR paperwork and/ or Hazard Studies 4 and 5 – per system
Issue first draft SOPs
Start-up procedures
Validation period
Acceptance period
Ramp up of production to design rate period
On the job training of operations
Handover to operations
Consolidation period, updating of documentation with best operational
Housekeeping adequate for start-up
Floor and tripping hazards
Scaffolding sufficiently removed / in place for start-up
AEL/Vedanta Ltd
01.2022 - 11.2022
Job overview
TO WHOMSOEVER IT MAY CONCERN
This is to certify that Mr
Vignesh T was working with us on contract as
Vedanta Ltd
Production Operator
01.2020 - 10.2015
Job overview
2022 and was deputed
to our client, at Barmer
We wish him all the best for his future endeavors and relieve him from our
service.
Narayan Kondam
SR. MANAGER HR
Job overview
11.2522:58 +05
Accomplishments
Schlumberger-PrivateSchlumberger-Private
Delayed jobs under control (working permits, fenced off without interfering with start-up activities,
no works during critical stages)
Adequate lighting
General access to buildings and escape routes clearly identified
Access for operations and maintenance
Guarding of machinery
Safety devices in operation (emergency stop devices, emergency showers, sprinklers)
Insulation enough to avoid blockages in the process and critical exposure of people
Sealed surfaces and pits cleaned / emptied to avoid contamination or blockage of sewer systems
Position and tightness of drain valves checked
Safety relieve systems like blow down systems or weep hole systems checked, burst discs in place;
all transportation securities are removed
Blinds removed from plant in a controlled and systematic way
Orifice plates correctly mounted
Lock, chains, seals and tags removed from valves
Temporary gauges, valves, fittings and similar dismantled
Caps, plugs and temperature element pockets are correctly fitted and equipped with thread tape
Provisional utility connections and nitrogen hoses removed
Connections to blind flanges removed
Caps mounted
Check interlock override list and shut down panel overrides according start-up procedures
Bypass valves closed
In case of an open bypass valve with “shut off” function the interlock is in
“override” mode
Labeling of valves, instruments, lines
All modifications checked against Engineering Lead Documents
Process Gas Compression Unit (PGC):
Driver : Solar Gas Turbine Engine (Straight Flow Gas Turbine)
Gas Compressor : Solar Compressor & Dresser Rand Compressor
Capacity : 90 MMSCFD
Operation and controlling of multistage centrifugal compressor driven by gas turbine engine
Compressor normal star up and normal shutdown, monitoring and controlling of compressor
parameter through PLC system (Allen Bradley& Honey well)
Handling of compressor suction
scrubber, pressure, Flow, Surges, Temperature, Vibration, Axial Displacement, fire and Gas safely
system
Gas Dehydration Unit:
Familiarization of gas dehydration unit normal startup and normal shutdown of gas
dehydration unit
Handling of inlet coalesces separator or dehydration inlet scrubber, glycol
dehydration contacts tower, glycol overhead scrubber, and gas / glycol heat exchanger (Tube and
Shell type), monitoring and controlling of contactor pressure, glycol level and temperature, flow
rate of lean glycol troubleshoot attending of dehydration unit
Glycol Regeneration Unit:
Handling of Re-boiler (kettle type and Fire Tube Re-Boiler Type), Lean /Rich
glycol heat exchanger (Tube and Shell Type), glycol storage or surge tank, operation of booster
pump and glycol re-circulation pump, operation of three phase glycol flash drum, glycol filter
Schlumberger-PrivateSchlumberger-Private
carbon filter, reflux coil, still column, stripping column, and monitoring and controlling of stripping
gas flow, blanket gas for glycol flash drum, maintaining of Re-boiler temperature and glycol pH
value
Checking of pH twice a week, glycol analyzing
Avoiding the glycol loss and foaming,
maintain the glycol reboiler temperature
Dehydrating medium Tri-ethylene glycol (TEG)
Handling of gas dehydration unit 120 MMSCFD
Produce water treatment unit:
Operation and maintenance of Hydro-cyclone separator, Water Skimmer, Reject oil
pump, backwash of hydro-cyclone, handling of Crude condensate Drum (CCD) and CCD pump
Collecting of overboard water sample for analyzing of oil content in disposal water Maintaining of
overboard sample 40 ppm
Station Handling of Produce water 22,000 BBLS/Day
Wellhead Operation and Maintenance:
Wellhead operation in well head cluster and unmanned platform for individual well
testing based on the use of 3 and 2 phase test separator, Well Equalizing, Optimization, Activation,
and Experience in Gas Lifting, Water Injections, ESP (Electric Submersible Pump) SRP and
Disposal wells
Collecting well fluid sample and gas sample and analyzing, Well fluid water cut
percentage of checking
Changing surface adjustable choke, Positive choke bean up and down
Changing of Daniel
junior and senior Orifice
Operation and maintenance of Christmas tree (BHEL, WKM, IKS, Cameron, kvaerner
MMA, FMC) Monitoring and bleeding of Annulus pressure
Handling of three pen chart recorder
(Barton, Foxbro) Override of SCSSV with Fusible and Non Fusible Cap, SCSSSV and XSDV
Flow back of new well, production deck housekeeping etc, Hands-over well for work over,
well completion, wire-line jobs, PLT, Reservoir, FBHP,SBHP study job, live perforation job, and
Acids jobs
Unmanned wellhead platform ESD, FSD shutdown normalising through the Autocon
Brisco and Ruelco well / fire / ESD shutdown panel board
Pigging Operation:
Monthly and quarterly as per plant program operating pigging oil line and gas line and
water line all type of pigging operation
Dose Batch #
“Together, India will defeat
COVID-19”
In case of any adverse events, kindly contact the nearest health centre
- Prime Minister Narendra Modi
This certificate can be verified by scanning the QR code at
http://verify.cowin.gov.in
Certificate ID
This certificate is compliant with WHO-DDCC:VS data dictionary
Interests
Beneficiary Reference ID
, Covid-19 Vaccination Certificate
Issued in India by Ministry of Health & Family Welfare, Govt of India
Vaccine Type
Manufacturer
Vaccine Name
Dose #
Date of Dose (YYYY-MM-DD)
Timeline
Production Operator
02.2023
AEL/Vedanta Ltd
01.2022 - 11.2022
AARVI ENCON LTD
02.2021 - 07.2027
Production Operator
Vedanta Ltd
01.2020 - 10.2015
Production Operator
Cairn India contract
10.2015 - 01.2020
Field Operator
ADNOC Under contract
07.2015 - 08.2019
Field Operator
Cairn Under Brunel
05.2014 - 08.2015
Production Operator
Sam Fire Mumbai, ONGC
06.2012 - 04.2013
Bwda Polytechnic College
Diploma In Mechanical Engineering from Mechanical Engineering
10.2009 - 04.2013
Field Operator
Cairn, L&T PVT LMT
12.2001 - 10.2022
SR. MANAGER HR
Narayan Kondam
Education
Bwda Polytechnic College
Kaniykumari
Diploma In Mechanical Engineering from Mechanical Engineering
Chief Manager (Authorized Officer) at State Bank of India, SAM Branch, MumbaiChief Manager (Authorized Officer) at State Bank of India, SAM Branch, Mumbai