
Production Engineer with hands-on experience in industrial valve assembly, manufacturing, pressure testing, and final inspection. Skilled in assembling and testing Gate, Globe, Ball, Butterfly, and Check Valves as per approved drawings, specifications, and applicable standards. Experienced in hydrostatic and pneumatic testing, shell and seat leakage testing, torque measurement and setting, functional testing, and FAT (Factory Acceptance Testing). Proficient in identifying and resolving assembly defects, leakage issues, and operational problems while ensuring production targets, quality requirements, and delivery schedules are achieved. Familiar with API 598, API 6D, engineering drawings, BOM, inspection documentation, traceability, 5S, and shop-floor safety. Strong ability to coordinate with Quality, Engineering, Maintenance, and Production teams for smooth and efficient valve manufacturing operations.
Production engineering professional with proven track record of enhancing operational efficiency and implementing cost-saving measures. Known for strong team collaboration and adaptability in dynamic environments. Skilled in process improvement and quality assurance, consistently delivering reliable results.
Valve Assembly & Manufacturing
Valve Assembly Process Planning
Hydrostatic & Pneumatic Pressure Testing
Shell & Seat Leakage Testing
Functional & Operational Testing
FAT (Factory Acceptance Testing)
Valve Torque Measurement & Setting
Valve Troubleshooting & Leakage Rectification
Valve Component Inspection & Verification
Valve Final Inspection & Release
Gland Packing & Bolting Assembly
Seat, Stem, Disc & Ball Assembly
API 598
API 6D
ASME Standards
Testing procedures
Inspection & Test Plans (ITP)
Test Reports & Documentation
Traceability & Material Identification
Reading Engineering Drawings & BOM
P&ID / Engineering Drawings
Valve Dismantling & Reassembly
Team collaboration
Production management
Failure mode and effects analysis
Waste reduction
Staff training
Failure analysis
Root-cause analysis
Assembly line management
5S methodology