Client: Schaeffler, Germany - Project: AMG-HPEDU
- Period: Oct 2024 - Sep 2025 Duration 12 Months
- Role: Unit Testing - Implementation and Support
- Environment: Parasoft, codebeamer, github
- Project Description: BSW and SWC integration on TC38x-based automotive platform, focusing on seamless configuration and validation of software components
- Contribution: Perform unit testing for various SWCs, Supporting clients for unit testing doubts, Debugging on Lauterbach (Trace 32)
Client: Schaeffler, Germany - Project: TQ-250 VW-HPEDU
- Period: Apr 2024 - Sep 2024 ; Oct 2025 - Dec 2025
- Duration: 9 Months
- Role: Integration tester
- Environment: PTC, Vector Canoe, Trace 32
- Project Description: BSW and SWC integration on TC38x-based automotive platform, focusing on seamless configuration and validation of software components
- Contribution: Update the code as per Change Analysis, Integration Testing (COM testing and Diag Testing)
Client: Schaeffler, China - Project: TQ-251
- Period: Dec 2023 - Mar 2024
- Duration: 4 Months
- Role: Requirement Analysis
- Environment: PTC, JIRA
- Project Description: Extended the TQ-250 base stack to develop software aligned with TQ-251 project requirements.
- Contribution: Analysis of Requirements from PTC tickets and JIRA tickets
Client: ZF - Project: ZF - Cyber Security
- Period: Jul 2023 - Nov 2023
- Duration: 4 Months
- Role: Crypto Stack testing
- Environment: Davinci Configurator and Developer, Trace 32
- Project Description: Develop a Crypto stack for ZF application, enabling secure encryption/decryption of keys and MAC generation/verification
- Contribution: Secret key generation and verification, Public Key and Private Key Encryption/Decryption.
Client: Marelli - China - Project: AL-HLM
- Period: Jun 2022 - Jun 2023
- Duration: 13 Months
- Role: Integration tester
- Environment: C4K, Ozone debugger, Vector Canoe
- Project Description: Develop and validate a BSW application tailored to client requirements, integrating key AUTOSAR modules including OS, RTE, COM, CAN, Watchdog, Diagnostic, NvM, and Network Management
- Contribution: Base Stack Preparation; COM, WDG, Diag Testing; Bootloader integration and testing
Client: Texas Instruments - Project: TI-DRA821
- Period: Aug 2021 - May 2022
- Duration: 12 Months
- Role: Requirement Analysis, COM configuration, Integration testing
- Environment: C4K, CCS debugger, Vector Canoe, PCAN
- Project Description: Develop a BSW application that can handle 32K Rx and 32K Tx messages on TI-DRA821 SOC
- Contribution: Requirement analysis; Test plan preparation; CAN, PduR and COM module configuration; CAN communication testing; CAN-CAN gateway configuration and testing; CAN-ETH gateway testing; KPI measurements including CPU load and latency
Client: BMW - Project: BMW-mPAD
- Period: Mar 2021 - Jul 2021
- Duration: 4 Months
- Role: Bazel Environment builder
- Environment: Bazel
- Project Description: Convert make environment into Bazel build environment
- Contribution: Learned the bazel build concept and converted makefiles into bazel build files