

Dynamic professional with extensive experience managing production schedules and optimizing team performance to deliver timely, high-quality results. Proven ability to leverage strategic planning and innovative problem-solving skills to enhance operational efficiency and streamline processes. Recognized for fostering a collaborative work environment that encourages teamwork and effectively addresses complex production challenges. Committed to driving continuous improvement and achieving organizational goals through effective leadership and operational excellence.
PROJECT HANDLING:
1 - Cellophane Paper Wastage Reduction – DMAIC Project.
- Successfully completed a DMAIC-based process improvement project focused on reducing cellophane paper wastage in production operations.
- Identified key sources of material wastage, and analyzed process-related inefficiencies.
- Implemented corrective and improvement measures to optimize material utilization.
- Achieved improved material cost control, and reduced unnecessary packaging material consumption.
2 - Top 5 Operational Downtime Reductions – DMAIC Project
- Executed a DMAIC project targeting the top five operational downtime contributors in production.
- Analyzed downtime data, identified major operational bottlenecks, and investigated root causes.
- Implemented corrective actions and process improvements to minimize recurring operational losses.
- Successfully achieved up to 40% reduction in operational downtime, improving machine availability and production efficiency..
3. Laminate Wastage Analysis & Root Cause Analysis.
- Currently working on a project to analyze laminate material wastage across production operations.
- Investigating process parameters, material characteristics, and machine-related factors contributing to excessive laminate wastage.
- Conducting RCA to identify major wastage contributors.
- Developing corrective and preventive action plans to improve material utilization and reduce production costs.