Summary
Overview
Work history
Education
Skills
Languages
Timeline
AdministrativeAssistant
THILAGARAJ VEERAMANI

THILAGARAJ VEERAMANI

ELECTRICAL ENGINEER
SRIVILLIPUTHUR,INDIA

Summary

Accomplished professional with extensive expertise in project management, engineering coordination, and executive leadership. Demonstrated proficiency in sub-contractor coordination, procurement assistance, and vendor evaluation. Adept at quality assurance, technical bid evaluation, and interdepartmental coordination. Proven track record in problem-solving and providing FAT and SAT witness services. Skilled in pre-commissioning and commissioning services, technical recruitment, power systems analysis, HVAC systems knowledge, power system operation, HV distribution systems, and electrical design. Committed to leveraging technical skills to drive organisational success and innovation.

Overview

11
11
years of professional experience
4
4
years of post-secondary education

Work history

ELECTRICAL ENGINEER

Al Balagh Trading and Contracting Co WLL
DOHA, QATAR
04.2025 - Current
  • Company Overview: Client: Qatar Petroleum
  • Assist in follow up contractors and subcontractors in electrical and instrument discipline scope during construction phases to assure the quality, environment, health and safety aspects of the work
  • Participate in Safety walks and Quality surveillance activities, prepare their reports and follow up the closure of all identified actions
  • Responsible for progress of all construction activities within E-I discipline
  • To prepare and follow up with the contractor(s) / sub-contractor(s) pre-commissioning and commissioning activities; planning and execution to ensure that the day-to-day commissioning activities are executed in safe manner and to prepare for & participate in pre-start-up safety reviews (PSSR)
  • To prepare field progress reports and be capable of identifying and correcting contractual non-conformities
  • Ensure that all activities and works in the area of responsibility are done in full compliance with the HSE requirements
  • Analyse the tender documents
  • Preparation of Method of statement
  • Preparation of Look ahead plans
  • Coordination with the vendor and Client
  • Maintaining the Weekly and monthly reports
  • Providing the Technical assistance to the site team
  • Manage the day to day work of the MEP team
  • FO cable laying
  • OTDR & Power Meter testing
  • Splicing of FO cable
  • Installation of Telecom Rack and Structured cabling works
  • Reviewing of MEP drawings and getting approval from the client side
  • Studying Electrical shop drawings of Main SLD, Lighting & Power, Transformer yard, DG room & Main Electrical room layout based on approved material technical submittals
  • Installation of Electrical MDB, SMDB, DB and Tie-ins
  • Cables glanding, termination and testing
  • Cable Tray, Ladders, Trunking installation on Various sizes
  • Installation and testing of Lightning protection system and Earthing System
  • Installation and testing of fire and gas system
  • Client: Qatar Petroleum
  • Supervised technicians in installing and maintaining MV, LV, and HV systems, overseeing safety and operational efficiency.
  • Kept and updated records on all electrical design changes.

Project Engineer

Al Balagh Trading and Contracting Co WLL
04.2025
  • Company Overview: Client: Roots & QatarEnergy
  • Making Trench Excavation, Manhole installation and Laying of Fibre Optic Cable to the Cuban Hospital From the Existing STP and Installation of New Fibre Patch Panel, Testing, and commissioning
  • Site preparation, Coordination with clients, Document preparation
  • Manpower Handling
  • Fibre Optic Cable laying
  • Fibre patch panel installation
  • OTDR Test
  • Power Meter test
  • 24F FO cable Splicing
  • Testing & Commissioning
  • Client: Roots & QatarEnergy

Electrical Engineer

Al Balagh Trading and Contracting Co WLL
04.2025
  • Company Overview: Client: QATAR UNIVERSITY
  • 6 Nos of 6F Cable laying for 3kms, 5 Nos of 24F Fibre cable for 6.6kms, Testing and commissioning for the building interconnectivity
  • Site preparation, Coordination with clients, Document preparation
  • Manpower Handling
  • Fibre Optic Cable laying
  • Fibre patch panel installation
  • OTDR Test
  • Power Meter test
  • 24F FO cable Splicing
  • Testing & Commissioning
  • Client: QATAR UNIVERSITY

Senior Electrical Engineer

Al Balagh Trading & contracting Co WLL
01.2021 - 04.2025
  • Company Overview: Client: QatarEnergy
  • Assist the Project Manager in preparation of Organization Chart & team set-up from the pool of resources available within the Company that meets the Client Requirements
  • Assisting the Planning team in preparation of the schedule to meet the project schedule requirement and incorporating vendor feedback to achieve the best solution possible
  • Emphasis on obtaining feasible solutions to meet the concerns of long lead items and critical paths
  • To have single point responsibility for the efficient delivery of the project within schedule, cost, and quality standards
  • Liaise with Engineering on instruction of Project Manager to follow up & track the progress in line with Project timeline
  • Liaise with planning team to identify the schedule lags and implement relevant steps to mitigate the delay to the project schedule
  • Align with the Procurement team to expedite delivery of long lead items along with any procurement related shortfalls
  • To manage Technical Queries during engineering, and coordinate responses
  • To manage cost, schedule and delivery during the engineering and procurement process
  • Review of Schedule & Resource Loading for the Tender as per requirement
  • Plan, organize and allocate resources, manpower loading, material and required equipment needed to complete the work as per the given schedule
  • To ensure that the overall project is delivered to meet the asset operational needs
  • To coordinate and participate in all project safety and design reviews as necessary
  • To ensure that all work is completed without compromise to quality and is delivered according to the project schedule
  • To ensure that all job site operations are carried out in accordance with the standard procedures, safety, and quality
  • To develop the project Scope of Work in order to define the required deliverables
  • Reviewing the specifications, data sheet, and TBE for all the long lead items as per contract
  • Reviewing the vendor technical offer and raise the queries and clarifications wherever required
  • Co-ordinate with manufacturers/vendors to get the necessary inputs to complete the engineering
  • Co-ordinate with Inter departmental lead engineers to expedite the engineering completion
  • Co-ordinate with client for document approval prior to start the manufacturing of long lead items
  • Lead the preparation of necessary Method Statements and procedure for installation of electrical systems & related activities
  • Actively attending all the FAT activities, Risk assessment, HAZID & Constructibility review workshop
  • Assist with Quality team regarding the material receiving and installation inspections
  • Interface with project Document controller to send all the approved drawings/documents to site prior to construction
  • Site visit to be carried out prior to construction along with other discipline leads to find out the issues and concerns
  • Conducting Site visit as required along with the technical team
  • Co-ordinate with vendors and planning their mobilization for commissioning activities
  • Co-ordinate with site engineers on the status of RLM drawings
  • Overall responsibility for handover (SPIR, document close-out and dossier submissions) etc
  • Review and evaluate change order/ variations from engineering sub-contractors and vendors
  • Kahramaa LOA holder
  • Assessed the contractor ITP/QAP and procedures, took participation in Switchgears/UPS system final inspection & FAT, and led construction supervision, pre-commissioning, and commissioning
  • Interfaced with clients for projects requirements, provided reports while monitoring contractor performance, identifying, and attending to emerging issues as appropriate
  • Prepare Technical queries, CCN and PAN to carry out the engineering related drawings reviews
  • Took part in meetings with clients, consultants, vendors, discipline engineers to resolve the technical issue on engineering deliverables
  • Focused on expediting procurement department and vendors for delivery of materials as per schedules while submitting necessary Method Statements and procedures for installation of equipments
  • Took part in Switchgears, Lighting DB's FAT; led the installation and assist testing team to ensure that quality facilities are delivered to the customer of the operation
  • Offered field Engineering surveillance of EPC instrumentation work while monitoring Instrumentation and Construction Schedule and progress
  • Initiated the construction (including pre-commissioning work such as system SAT) activities of the EPC contractor are well prepared/executed as per Quality and Schedule Project requirements
  • Actively attended Weekly meetings at the site and ensured that the project team complied with all aspects of HSE policy and Client requirements; helped in the preparation of Job Safety Analysis document pertaining to Electrical activities
  • Helped in the preparation of redline mark-up and As-built preparation including commissioning assistance during loop checking & functional checks
  • Client: QatarEnergy

ELECTRICAL ENGINEER

KENTZ ENGINEERING -QATAR
01.2016 - 01.2018
  • Company Overview: Client: Qatar Petroleum
  • Handling floor man power and allocating the job based on the priority
  • Sizing of cable trays, cable trench and raceway based on actual requirement
  • Studying Electrical shop drawings of Main SLD, Lighting & Power, Transformer yard, DG room & Main Electrical room layout based on approved material technical submittals
  • Coordinating with the other discipline
  • Material arrangement before start the job
  • Preparation of Material submittal and getting approval
  • Preparation of BOM based on the drawing
  • Executing the work based on the plan
  • Man power planning
  • ON the Duct (VAV, FAV, TEMPERATURE SENSOR) Installation
  • Sensors (wash hand basin, toilet water closet, co sensors, water leakage, wind)
  • Installation of access control system and testing
  • Installation and testing of PAGA
  • Installation Data and Telecom
  • Installation of HVAC control panels and cables
  • Fire pipeline and potable water system arrangement installation
  • Undertake general project site observation / inspection of the ELECTRICAL mechanical services works for Companies adherence to the approved shop drawings and Consultant's specification, good working practices and construction schedule
  • Preparation of Project dossiers
  • Coordination with the QA/QC Team
  • Preparation of Red line drawings
  • Rising TQ for the technical clarification
  • Client: Qatar Petroleum

Instrumentation engineer

PREMIER INSTRUMENTS
MUMBAI, INDIA
04.2014 - 01.2016
  • Performed detailed analysis on malfunctioning instruments, rectifying issues swiftly.
  • Coordinated with vendors to procure high-quality instruments at competitive prices.
  • Designed control systems for enhanced operational productivity.
  • Delivered comprehensive training to team members for improved system understanding.
  • Improved process efficiency by developing and implementing new instrumentation systems.
  • Conducted rigorous testing procedures ensuring reliability of newly installed devices.
  • Utilised strong knowledge of ISO standards, maintaining compliance throughout all projects.
  • Optimised plant operations by conducting regular preventive maintenance checks.
  • Maintained and updated database for contractors in instrumentation field.
  • Maintained project records, manuals and diagrams for comprehensive referencing.
  • Supported research for new instruments and sensor concepts.

Education

UNDER GRADUATION - ELECTRICAL AND ELECTRONICS ENGINEERING

P.S.R ENGINEERING COLLEGE
SIVAKASI/ INDIA
04.2010 - 06.2014

Skills

  • Project Management
  • Engineering Co-ordination
  • Sub-Contractor Co-ordination
  • Procurement Assistance
  • Vendor Evaluation
  • Quality Assurance
  • Technical Bid Evaluation
  • Executive Leadership
  • Interdepartmental Coordination
  • Problem-solving
  • FAT and SAT witness
  • Pre-Commissioning & Commissioning Services
  • Technical recruitment
  • Power systems analysis
  • HVAC systems knowledge
  • Power system operation
  • HV distribution systems
  • Electrical design

Languages

Tamil
Native
English
Fluent
Hindi
Fluent
Telugu
Intermediate
Malayalam
Upper intermediate

Timeline

ELECTRICAL ENGINEER

Al Balagh Trading and Contracting Co WLL
04.2025 - Current

Project Engineer

Al Balagh Trading and Contracting Co WLL
04.2025

Electrical Engineer

Al Balagh Trading and Contracting Co WLL
04.2025

Senior Electrical Engineer

Al Balagh Trading & contracting Co WLL
01.2021 - 04.2025

ELECTRICAL ENGINEER

KENTZ ENGINEERING -QATAR
01.2016 - 01.2018

Instrumentation engineer

PREMIER INSTRUMENTS
04.2014 - 01.2016

UNDER GRADUATION - ELECTRICAL AND ELECTRONICS ENGINEERING

P.S.R ENGINEERING COLLEGE
04.2010 - 06.2014
THILAGARAJ VEERAMANIELECTRICAL ENGINEER