Seeking a challenging role within a dynamic organization that allows leveraging skills and efforts for the benefit of the company. Eager to contribute towards achieving organizational goals while enhancing own abilities.
Overview
4
4
years of professional experience
Work History
PROJECT ENGINEER
NITHIN’S AIRCON
06.2021 - 08.2021
Execution of HVAC works for new and existing Intensive Care Units (ICU) like Ducting, VRV Copper piping and AHU.
Execution of Clean room project for Organ Transplant ICU efficiently.
Carry out Pressure testing of copper pipes and light test for ducts.
Coordinating with commissioning team for CFM testing and other electrical devices.
Reporting the work completion status and progress to the company and clients.
Material organizing before/after dispatch and receiving the same at site
Sourcing of few contractors in the project and negotiations.
Determined and scheduled priorities as required to progress work.
PROJECT ENGINEER
CORAL ENGINEERING
04.2019 - 06.2019
Execution of HVAC works like Ducting, VRV Copper piping, AHU Chill water tapping, Insulation, DX Unit, etc
Testing: Carry out Pressure test of Chill water pipes, copper pipes and Light test for ducts
Coordinating with commissioning team for CFM testing and other electrical devices.
Permit receiving for all works like Hot, Cold, Height, Pressure tests, Light tests and person access to terrace and shafts in SEZ sites.
Handling of resources like organizing manpower and making sure the availability of materials for steady work flow as scheduled.
Friendly collaborative work with other MEP teams to get work done.
Have adequate knowledge and hands on experience in installation of HVAC electrical components like mounting and termination of Fire damper actuators, CO Sensors and termination of VAV, AHU Star delta motor and panel erection.
Handled few sites in a short tenure.
MECHANICAL ENGINEER/SUPERVISOR
ARROW ENGINEERING
08.2017 - 03.2018
Piping: Execution of pipelines, including 1200m Dedicated Nitrogen line from Refinery 3 to DCU over pipe rack, Rerouting of 24’’ fire water line and 6’’ service water line due to piling work for BS-6 fuel project and hook up proposed line with existing live line, laying of Underground pipelines and visual inspection of wrap coating.
Assist hot tapping of kerosene line.
Boiler Maintenance: During annual overhauling execution of jobs as per inspection work list like replacement of corroded AHU tubes, super heating coil bends, gaskets, man entry gaskets, sample piece, repair/replacement of valves, removal of sludge on AHU tubes, Economizer coil and inside combustion chamber, fixing of flue gas leaks from AHU, Economizer and steam leak, fix pin holes, and other leaks which are visually identified by soap oil testing.
Co-ordinate with inspection during fit up clearance, root weld clearance, penetrant test, hydro test, Ultrasonic test.
Permit receiving for hot work, cold work, height work, confined space/vessel entry and excavation.
Scaffolding supervisor at Plant 77 DHDS Revamp project.
Scaffolding erection and dismantling for welding, RT, insulation, inspection inside equipment, loading catalyst in reactor, pre commissioning activities like flushing and cardboard blasting.
Managing skilled and unskilled workers for efficient work progress.
Ensure availability of materials for steady progress.
Conduct Toolbox talk and responsible for site safety.
Clinical Documentation Specialist at Acuity Solutions India Pvt Ltd (An IKS Health Company) | Client: Coastal MedicalClinical Documentation Specialist at Acuity Solutions India Pvt Ltd (An IKS Health Company) | Client: Coastal Medical