Experienced Geotechnical Design Engineer with 2 years of expertise in tunnel and underground metro infrastructure projects, with a strong background in numerical modeling, settlement analysis, and construction stage stability assessments). I have experience working in rock and soil and have Proven ability in preparing GIR, worked on Building Damage Assessment, I&M ,face pressure calculation,Design and analysis of shoring system (Soldier Pile, Secant pile, Dwall) for deep excavation.
Project: KNPCC-11 - Kanpur Underground Metro, Client: UPMRCL, India, Role: Design Engineer - Geotech/Tunnel, Duration: Mar 2024 - Present
Project: DC08 - Delhi Metro Phase IV, Client: DMRC, India, Role: Design Engineer - Geotech/Tunnel, Duration: Jun 2023 - Dec 2023.
Project: BH-04 - Bhopal Metro, Client: MPMRCL, Role: Design Engineer - Geotech/Tunnel, Duration: Jan 2025 - Present.
Project: MAHSR-C-2 - Mumbai-Ahmedabad High-Speed Rail. Client: NHSRCL. Role: Engineer - Geotech/Tunnel. Duration: Jan 2025 - Present.
Other projects: NRCTC, MRVC, Song Dam, Dehradun. Role: Design Engineer - Geotech/Tunnel. Duration: Jan 2025 - Present.