Infact my entire exposure can bbe divided in to two phases.
My first 20 years I gained experience in instaaling,, comissioning cement plants as a Manager Field Services with Fuller company in India
Next part is involved in operations and maintenance of cement plants, where in I gained the customers point of view.
So I am a complete manage who has the suppliers point oof view and full understanding of customers.
This gives me a unique skill to cater services to your African customer with my solid exposure to this region for more than a decade.
Experienced with overseeing all aspects of plant operations, ensuring optimal performance and compliance with safety standards. Utilizes strategic planning and resource management to maximize productivity and minimize downtime. Track record of successfully leading teams, driving process improvements, and achieving operational goals.
AgainTransferred from Senegal to Zambia to uplift the underperforming plant.
This plant is 1MTPA capacity performing at 50 % capacity.
After I joined,, carried oout loot of debotlenecking and brought this plant to proper operating comnditionsto
In 2020, from OBajan plant,, I was promoted as Pllant Director and shifted to Senegal opperations to optimiize the plant.
This plant was of 1MTPA capacity producing way beloow forcing the management to import clinker.
Ihave opptimiized the plant. reduces the break downs and produced clnker exceeding iits capacity.
By the time I left we had surplus clinkr of 30,000MT
I was in charge of all four lines of 6000TPD each and could improve loesche Rawmills fom rated 550 to 730TPH and was gi ven best technical performance award by Management.
Ijoined this plant when ESP has collapsed due to Mal operation..
Installed HURRICLONE IN cooler vent system as a stop gap arrangement, overcome many hurdles as the plant was stopped due to pollution issues for almost 7 years.
Stabilsed the plant.
Another challenge was to install cement ill nnear jetty whose parts were buries underssand, We dug th eplarts out and comissioned this system, where FLS expressed it inability. We successfully comissioned with inhouse modification to the feed systemm of roller press under my guidance.
During this period I was incharge of a 1200TPD runnning plant This is the time we carried out exection of this plant in flat 11 months from first excavation to first clinker, which has come as an achievement in FLS high lights magazineand a brown field project of 1MTPA
As a Manager Field services I hand picked the whole teaam and carried oout following projects.
! MTPA Satna cement works, Satna,, consisting of Fuller rotary kiln, Loesche Raw mill and Fuller coal mmill.
Execured Balll mill andd roller press circuits for Maihar cement, Maihar, MP india
Executed 1 MTPA cement plant for TISCO ,, cements,, SSonadih in MP, India
Erected and comissioned two lines if 1 MTPA each for Madras cements, Alathiyur, TTamilnadu.
Carrried out 1MTPA cment plant for Gujarat Ambuja cement, DDarlaghat,, Himacal pradesh.
Carried oout kiiln shell repairs, mill shell repairs at many pllaces
Operations management