Summary
Overview
Work History
Education
Skills
References
Interests
Certification
Timeline
Hi, I’m

Tushar Kant Parida

Senior Manager Mechanical
Bhubaneswar
Tushar Kant Parida

Summary

Dynamic, PMP-certified professional with over 20 years of extensive experience in project management and execution, recognized for a proactive and goal-oriented approach. Proven expertise in the erection and maintenance of power plants ranging from 500MW to 660MW, complemented by a strong background in managing complex projects involving fabrication and erection of structure, rotary parts and various equipments. A track record of developing efficient processes that maintain high standards while aligning team efforts with organizational objectives underscores a commitment to excellence. As a collaborative leader dedicated to driving team success and fostering a culture of continuous improvement, consistently inspires teams to achieve outstanding results.

Overview

21
years of professional experience
2
Certificates
3
Languages

Work History

Tata Consulting Engineers Limited, Construction Division, Odisha

Package in-charge
12.2021 - Current

Job overview

  • Project: Bauxite Handling System Vedanta Limited, lanjigarh, Odisha.
  • CLIENT: VEDANTA LIMITED, LANJIGARH.
  • CONSULTANT: TATA CONSULTING ENGINEERS LIMITED, PUNE.
  • EPC CONTRACTOR: ISGEC.
  • Roles and Responsibilities:
  • The job involved - Managing and implementing procedures and practices for Fabrication, Erection, Testing & Commissioning of Stacker cum reclaimer, Bucket wheel Reclaimer, Slewing stacker, Associate conveyor, Transfer tower , Wagon Tipplers, Side arm charger Apron Feeders, Dribble Feeders, Wagon traverse & Shifter, Pre-Wetting System, Rapid wagon loading system, mobile tripper and travelling tripper.
  • Assuring availability of Field Quality Assurance plan at site for the various erection activities .i.e. ensuring all quality checks are followed & relevant documents being maintained .Welding &NDT (RT,UT,MPT& DPT) of joints and trusses. WQT etc.
  • Highlights:
  • Successfully completed commissioning of Stacker cum Reclaimer (SCR), BWR &SSM within specified time & bauxite charging carried out through SCR.

Tata Consulting Engineers Limited, Construction Division (Contract), Gujarat

Mechanical in-charge
03.2019 - 12.2021

Job overview

  • Project:
  • Kachchh Branch canal Pumping station-1,2&3
  • CLIENT: SARDAL SOROVAR NARMADA NIGAM LIMITED, GUJARAT.
  • EPC CONTRACTOR: MEGHA ENGINERRING AND INFRASTRUCTURE LIMITED.
  • Roles and Responsibilities:
  • The job involved - Managing and implementing procedures and practices for Erection of pumps and auxiliaries as per given drawing and also approved FQAP.
  • Assuring availability of Field Quality Assurance plan at site for the various erection activities .i.e. ensuring all quality checks are followed & relevant documents being maintained .Welding &NDT (RT, DPT) of pipe joints and trusses. WQT etc.
  • Install new equipment according to requirements, and perform initial testing and Procedures to ensure correct and efficient operation.
  • Co-ordination/Dealing with Manufacturer/EPC Group and discussing other technical aspects regarding Quality at site.
  • Reporting to the construction manager & also client chief at Site and providing all relevant information regarding site activities.
  • Adaptable and proficient in learning new concepts quickly and efficiently.
  • Organized and detail-oriented with a strong work ethic.
  • Learned and adapted quickly to new technology and software applications.
  • Paid attention to detail while completing assignments.

Tata Consulting Engineers Limited, Construction Division (Contract), Rajasthan

Construction engineer Mechanical
10.2015 - 03.2019

Job overview

  • Project: - 2X660 Chhabra Super Thermal Power Project, Motipura, Chhabra, Rajasthan.
  • CLIENT: RAJASTHAN RAJYA VIDUT UTPADAN NIGAM LIMITED, JAIPUR, RASTHAN
  • EPC CONTRACTOR: LARSEN & TOUBRO LIMITED
  • Roles and responsibilities:
  • The job involved - Managing and implementing procedures and practices for Erection/Maintenance activities of BOP (WTP, STP,AHP, DM PLANT etc.), BOILER & its auxiliary as per given drawing and also approved FQAP.
  • Erection, Testing & Commissioning of Stacker cum reclaimer, Wagon Tipplers, Side arm charger Apron Feeders, Dribble Feeders, Wagon traverse & Shifter, Pre-Wetting System, Rapid wagon loading system, mobile tripper and travelling tripper.
  • Stacker and Conveyors, Belt Feeder, Truck Tippler, D.S, D.E, Magnetic Separators, Electrical Hoist, Bucket Elevator, Vibro Feeder (Capacity 1200 T/Hr.)
  • Manage all BOP mechanical systems, including completing routine maintenance, Performing efficiency tests, repairing broken machines, and recommending upgrades when necessary
  • Assuring availability of Field Quality Assurance plan at site for the various erection activities .i.e. ensuring all quality checks are followed & relevant documents being maintained, for ex. Alignment of structural columns, Welding &NDT(RT,UT,PT,MPT) of Pressure parts, Pressure parts alignment, WQT etc.
  • Install new equipment according to requirements, and perform initial testing and Procedures to ensure correct and efficient operation.
  • Co-ordination/Dealing with Manufacturer/EPC Group and discussing other technical aspects regarding Quality at site.
  • Highlights:
  • Successfully completed the "Hydro test" process of Boiler, Alkali flushing, Acid cleaning, Light up by oil & coal, 2nd stage passivation, steam blowing, and also synchronization of Unit #05.
  • Successfully completed the "Hydro test" process of Boiler and preparation for ready to Alkali flushing, Acid cleaning, Light up by oil, 2nd stage passivation, and steam blowing and also synchronization of Unit #06

NCC (Rezyat Group), KSA(Kingdom of saudi arabia)

Construction Engineer
02.2013 - 05.2015

Job overview

  • Project: - (3X70 MW) Gas based Power Project of Saudi Electricity Company, Kingdom of Saudi Arabia.
  • Roles and Responsibilities:
  • Install new equipment according to requirements, and perform initial testing and Procedures to ensure correct and efficient operation.
  • Monitored all Inspection at Site as per FQP and QAPs.
  • Responsible for Welding Inspections, Welder Performance Qualification Tests (HP&LP), NDT co-ordination & Inspection of RT, UT, PT, and MPT.
  • Responsible for inspection of Hydro testing procedure followed by Client/Consultant's Specification.
  • Reporting to the construction manager & also client chief at Site and providing all relevant information regarding site activities.

Monnet power company limited, Odisha

Assistant Manager - Quality Assurance
09.2011 - 01.2013

Job overview

  • Project: - 2x525 MW Monnet Power Company limited.
  • Roles and Responsibilities:
  • Reporting to the Manager (Projects) and heading erection of 2X525 MW Boiler.
  • Stacker and Conveyors, Belt Feeder, Truck Tippler, DFDS, Magnetic Separators, Electrical Hoist, Bucket Elevator, Vibro Feeder (Capacity 1200 T/Hr.)
  • Identifying and organizing material/manpower required for erection work of Boiler.
  • Preparation of Project activity as per contract agreement.
  • Coordinating with Designer.
  • Planning of work to meet the Project schedules.
  • Attending Higher Management meeting with VP, GM.
  • Highlights
  • Successfully completed the "Hydro test" process of #01, approx one month before due date.
  • Successfully completed the "Hydro test" process of #02

M/S JINDAL INDIA THERMAL POWER LIMITED, Odisha

Senior Engineer
02.2011 - 09.2011

Job overview

  • Roles and Responsibilities:
  • Reporting to the GM (Projects &Quality) and heading site related quality checking of 2X600 MW Boiler & ESP supplied by M/s BHEL, INDIA.
  • Identifying and organizing material/manpower required for quality check of Boiler as well as BOP areas.
  • Preparing daily, weekly and monthly Quality Program.
  • Attending Higher Management meeting with VP, GM.

M/S BHEL (Contract), Rihand nagar,UP

Engineer
10.2007 - 01.2011

Job overview

  • Roles and Responsibilities:
  • Inspection of Alignment Internally and Inspection with Client and Customer also making a protocol.
  • Responsible for approving QAP, FQP, WPS, PQRS etc. from Vendors, Contractors & Site
  • Responsible for Welding Inspections, Welder Performance Qualification Tests (HP&LP), NDT co-ordination & Inspection of RT, UT, PT and MPT.
  • Prepared and Conducted Procedure Qualification Record (PQR), and Welding Procedure Specification (WPS).
  • Highlights
  • Executed the project within targeted cost and time schedule.
  • Successfully handled the erection of structural project including:
  • Boiler -structure & Pressure parts and non-pressure parts.
  • Successfully erected the "BOILER DRUM.
  • Successfully completed "Hydro test" process in record time.
  • Successfully completed "LIGHTUP" process.

SAURAV ALLOY AND STEELS PVT. LTD

Engineer-PPC
11.2004 - 09.2007

Education

SIKKIM MANIPAL UNIVERSITY
Sikkim Manipal University

MBA from Total Quality Management
08.2012

Biju Pattanaik University of Technology,Odisha.
Odisha

B.E. from Mechanical Engineering
07.2004

Skills

Project management professional certification

References

References available upon request

Interests

Reading books and playing cricket

Certification

Project management professional

Timeline

Project management professional

11-2025

ASNT L-II

08-2024

Package in-charge

Tata Consulting Engineers Limited, Construction Division, Odisha
12.2021 - Current

Mechanical in-charge

Tata Consulting Engineers Limited, Construction Division (Contract), Gujarat
03.2019 - 12.2021

Construction engineer Mechanical

Tata Consulting Engineers Limited, Construction Division (Contract), Rajasthan
10.2015 - 03.2019

Construction Engineer

NCC (Rezyat Group), KSA(Kingdom of saudi arabia)
02.2013 - 05.2015

Assistant Manager - Quality Assurance

Monnet power company limited, Odisha
09.2011 - 01.2013

Senior Engineer

M/S JINDAL INDIA THERMAL POWER LIMITED, Odisha
02.2011 - 09.2011

Engineer

M/S BHEL (Contract), Rihand nagar,UP
10.2007 - 01.2011

Engineer-PPC

SAURAV ALLOY AND STEELS PVT. LTD
11.2004 - 09.2007

SIKKIM MANIPAL UNIVERSITY

MBA from Total Quality Management

Biju Pattanaik University of Technology,Odisha.

B.E. from Mechanical Engineering
Tushar Kant ParidaSenior Manager Mechanical