Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Tyler Prgram

Poseyville

Summary

Versatile Carpenter with 6 years of experience on various construction sites, including several new home developments, room additions, pole barns, block work, and footer pours.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Carpenter

Titan Construction Partners
Fort Branch
09.2024 - Current
  • Positioned and installed floor joists, trusses and rafters.
  • Studied blueprints, sketches or building plans to prepare project layout and determine dimensions and materials required.
  • Inspected completed projects for quality assurance purposes before delivering them to customers.
  • Provided consultation services for homeowners regarding custom carpentry designs.
  • Read blueprints, schematics and drawings to determine layout requirements.
  • Installed cabinets, fixtures and trim according to plans and blueprints.
  • Installed interior trim work such as baseboards and moldings around windows and doors.
  • Led apprentices and trainees in building construction and renovation.
  • Prioritized work, keeping carpentry jobs on task and within budget.
  • Cut and installed tile and hardwood flooring for residential and commercial buildings.
  • Took accurate measurements to calculate size and amount of materials needed for project completion.
  • Consistently constructed square and level projects.
  • Studied blueprints or building plans to prepare layout and materials required.
  • Coordinated with subcontractors to work specialty areas, heating or electrical wiring work.
  • Erected scaffolding to assemble above-ground structures.
  • Grouted joints between blocks to ensure structural integrity of the wall.
  • Planned and laid out masonry walls in accordance with blueprints and job specifications.
  • Laid block courses of varying heights to create level surfaces for buildings.
  • Prepared mortar mix for block laying, using hoes, cement mixers, or mortars boxes.
  • Repaired existing block walls by removing deteriorated sections and replacing them with new blocks.
  • Laid building materials such as ceramic tile, bricks, concrete blocks and glass blocks using mortar or other substances to join.
  • Installed window and door frames into interior walls.
  • Completed tear-down of existing structures to prepare for new construction.
  • Worked independently on projects and tasks within carpentry team.
  • Roughed in door and window frames or subflooring in structures undergoing construction or repair.

Carpenter

Justin Grubb Construction
Evansville
11.2023 - 08.2024

Carpenter

Danco
Evansville
01.2023 - 11.2023
  • Prepare and pour foundations for structures.
  • Measured and cut timber to size in order to create formwork components.
  • Installed steel ties and walers, as well as other reinforcing components.
  • Ensured the accuracy of the formwork prior to pouring concrete.
  • Studied blueprints or building plans to prepare layout and materials required.
  • Stripped off formed surfaces once they had set properly according to design plans.
  • Mixed, poured, spread and smoothed concrete using hand tools and power trowels.
  • Installed steel reinforcing bars into concrete forms prior to pouring concrete.
  • Inspected completed work to ensure quality standards were met before pouring concrete.
  • Loaded and unloaded trucks with hand-trucks, pallet jacks, and forklifts.
  • Received and tracked incoming inventory shipments.
  • Staged and sorted multiple types of products for loading.
  • Secured items in truck by strapping over protective padding.
  • Transported materials between job sites with dump trucks or flatbeds according to project requirements.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.

Carpenter

Justin Grubb Construction
Evansville
12.2018 - 12.2022
  • Prepared surfaces by sanding or scraping off old finishes prior to refinishing them.
  • Calculated material costs for projects based on labor estimates provided by clients.
  • Performed routine maintenance on carpentry equipment such as saws and drills.
  • Determined load-bearing requirements based on local building codes.
  • Constructed walls, floors, roofs, door frames and other wooden structures according to blueprints or drawings.
  • Built stairs, railings and decks according to safety regulations.
  • Coordinated with contractors on job sites regarding scheduling of work activities.
  • Trained new employees on company policies and procedures.
  • Managed inventory levels of supplies necessary for job completion.
  • Managed workers at various experience levels in construction and restoration projects.
  • Created detailed drawings for use in construction projects using CAD software.
  • Laid out flooring patterns using chalk lines or templates.
  • Applied waterproof sealants to outdoor decks to prevent water damage.
  • Installed siding on houses both horizontally and vertically.
  • Repaired damaged shingles or sections of metal paneling due to storms or wear-and-tear over time.
  • Measured and cut metal panels to fit specific roof designs.
  • Installed flashing, sealants, insulation and other components as needed.
  • Removed old roofing material and prepared the surface for new installation.

Education

GED -

Evansville North Highschool
Evansville, IN
05-2023

Skills

  • Team leadership
  • Time management
  • Problem solving
  • Attention to detail

Certification

  • OSHA 10 Certified

Timeline

Carpenter

Titan Construction Partners
09.2024 - Current

Carpenter

Justin Grubb Construction
11.2023 - 08.2024

Carpenter

Danco
01.2023 - 11.2023

Carpenter

Justin Grubb Construction
12.2018 - 12.2022

GED -

Evansville North Highschool
Tyler Prgram