Summary
Overview
Work History
Education
Skills
Certification
Interests
Timeline
Training
Generic
UDAI PRATAP SINGH

UDAI PRATAP SINGH

Manufacturing Industry ,Project , MEP & Utility Maintenance
Greater Noida

Summary

Manufacturing Industry, Project, MEP & Utility Maintenance Department: Energy, Utility and Facility maintenance.

Overall responsibility of Utilities Operations, Maintenance and supporting plant on efficient operations of all the machines following proper maintenance and availability of essential utilities. Executing the CAPEX projects as per plan. A Competent Electrical Engineer having 21+ years of Experience in the field of Utilities and Plant maintenance

Overview

1
1
Language
1
1
Certification
22
22
years of professional experience

Work History

AGM – Power Utility Maintenance and MEP

UFLEX LIMITED Noida
04.2010 - Current
  • Utility and Maintenance
  • Power management: Handling electrical distribution of 2000KVA (1600 KW) Euro Diesel Rotary UPS including periodic maintenance on different sites
  • Installation, Commissioning and operation and maintenance of Gas Genset upto 1000KVA.
  • Machine management: Perform wiring of rotating machinery such as diesel engines and electric motors / alternators
  • Modify the wiring of the electrical cabinets.
  • Participate in testing and system development of systems.
  • Participate in the commissioning of the complete installation of machines.
  • Perform customer interviews following established procedures.
  • Perform the troubleshooting (mainly electrical) of the installation in operation at the Machines
  • Client interventions in order to make the right decision benefits from the support of the entire headquarters team.
  • Project Management: Responsible for Execution of electrical (Low Voltage & High Voltage).Prepare work schedules and carrying out resources planning and resources balancing. Estimation, Tendering, Budget preparation, Bill Certification, Contractor Management. Monitoring and controlling of WBS Tasks and prepare progress reports.
  • Utility Maintenance: Preventive Planned Maintenance, SOP, and Break down routines, Defect rectification, Testing and Tuning of equipment’s , Approval for Case summary, Vender finalization, Negotiation, AMC Management for Substation, DG plant ,Electrical System.AC Chiller plant.
  • Tendering & Procurement: BOQ preparation, Tendering & Specification Finalization. Bidding & Procurement. Planning and Coordinating for procurement of equipment. Identify and develop a reliable vendor base (Vendor Management) for cost effective sourcing of the same. Managing inventory for procurement, service entries and bill checking.
  • Liaison/Coordination: Liaising with necessary bodies for statutory requirements and AMC/ARCs. Maintaining excellent relations with higher echelons, Statutory & Regulatory bodies, Vendor & Contractors, Private firms & Government bodies. Coordinating with administration department of group companies and locations to leverage facilities.
  • Design coordination: Concept Preparation, Detail Design, DBR and Schematic with Energy Consultant, Architects and structural consultant. Check detailed Estimation for various Services, Design and drawings from Consultants as per government laws and specification
  • Team Management: Possesses excellent communication, collaboration and team building skills. A team player with ability in delegating people with complementary skills for maximum team effort and effectively draws the strength of all team members. Understanding of the effective dynamics of team work.

Handled Installation Testing & Commissioning of system Proficient

Lighting & Power System :

1st & 2nd Fix Installation, Electrical Distribution : Cable Tray, Rising Main, Bus Duct, Meter Board, Electrical Control : Switch Gear, Panels

External Electrical Work :

Substation Work : Indoor & Out Door Up to 33 kV, Installation & Commissioning for DG Sets Up to 1500 kVA, Installation & Commissioning of Transformers 2500 kVA, Earthing & grounding System, External Landscape Lighting Work, Lightning Protection.

Low Voltage Work :

Telecom System (TV & Telephone), Security System CCTV SERVER ROOM and DATA CENTRES

Mechanical Work :

Fire Fighting System:

Fire Pump Room: Hydrant Pump, Jockey Pump, Pneumatic Pump, Header installation. Hydrant System, Firefighting Equipment :Sprinklers, MCP, Hose Real and speakers, FACP Panels

HVAC System:

Identify HVAC zone, Chillers Plant, AHU, FCU, VRV, Cooling tower, Duct Work, Insulation and wrapping etc. Split Units, Package Units, Ventilation System: Fresh Air Intake and Exhaust Management

Elevators.

Boilers

Working on Water tube boilers upto 20 Lac kcal Make - Thermax

Asst. Manager Plant Engg. & Maintenance

India YAMAHA Motors Pvt. Ltd
01.2005 - 04.2010
  • Supervised day-to-day operations to meet performance, quality and service expectations.
  • Improved customer satisfaction by addressing and resolving complaints promptly.
  • Developed strong working relationships with staff, fostering a positive work environment.
  • Facilitated clear communication between employees and upper management through regular meetings and updates.
  • Managed inventory levels to minimize stockouts while reducing overhead costs.

The Key Performance Areas

WORKING & MAINTENANCE IN UTILITY

LT panels (MCC panels) Siemens & vidhut control make

HT panels (Siemens make)

D.G sets of 1250KVA ( Cummins make)

ACB up to 3000amp (Siemens make)

VCB up to 2000amp (Siemens make)

PLC controlled machines

D.G synchronizing systems

Compressors 1000cfm,960cfm(atlas copco make)

Air dryers (electrical pneumatic)

Transformers 5mva, 2mva, 1mva BBL

Hot water gene up to 20lac kcal

ETP plant

STP plant

Incinerator

Gas handling plant

Fire Prevention and Fire Fighting

Engineer Electrical & Utility

Durasafe Glass Industry Bahadurgarh HR
06.2004 - 12.2004

Education

Diploma - Electrical Engineering

Govt. polytechnic Board of Technical Education Lucknow
Lucknow
01-2004

Skills

Site Management

Utility Maintenance

Erection & Commissioning

Quality Control

MEP Design Coordination

Facility Management

Certification

Certified EHS Internal Auditor

Interests

Cooking, Reading books, Watching movies, Helping people to achieve excellence

Timeline

AGM – Power Utility Maintenance and MEP

UFLEX LIMITED Noida
04.2010 - Current

Asst. Manager Plant Engg. & Maintenance

India YAMAHA Motors Pvt. Ltd
01.2005 - 04.2010

Engineer Electrical & Utility

Durasafe Glass Industry Bahadurgarh HR
06.2004 - 12.2004

Diploma - Electrical Engineering

Govt. polytechnic Board of Technical Education Lucknow

Training

  • 15 days EHS Training for Internal Auditor
  • 15 Days Special Training about management program of industrial pollution control
  • 5S & QMS

Declaration

I declared the above said information is correct and I bear the responsibility for correctness of the said.

UDAI PRATAP SINGH

UDAI PRATAP SINGHManufacturing Industry ,Project , MEP & Utility Maintenance