Seeking to put forth my technical skills into pharma machinery installation and maintenance activities.
Effective project management and man power handling.
Work estimation, site survey, material procurement, conduct FAT, site materials cum tools mobilization, mobilizing local manpower or subcontractor, conduct of SAT.
Target based working to meet deadlines, managing multiple clients, conduct of final testing, client training, release of project handover MoM, conduct AMC works, consequent release of payments from client.
Knowledge in design of PLC panels, understand autocad drawings, P&ID & layouts, implementation of PLC logics, SCADA mimics as per customer needs and electrical & mechanical instrumentation works.
Overview
9
9
years of professional experience
Work History
Service Engineer
Glatt Systems Pvt. Ltd.
03.2020 - Current
Conduct installation and maintenance of fluid bed dryers, high shear granulator's, tablet coaters, blenders & tippers, lifting machines, bin washers, granulation suites and containment lines in Indian and abroad sites.
Analyzed, troubleshot and diagnosed problems and provided prompt repair and solutions.
Worked cross-functionally within organization and external partners, integrators and vendors.
Engaged in first-level support for customers requiring routine support and troubleshooting.
Tested and checked performance of hardware and software programs.
Trained and supervised customer staff on equipment operation & maintenance and safety procedures.
Visually inspected and tested machinery and equipment, performing routine preventive maintenance.
Provide proactive spares support to customers to reduce machine breakdown times.
Provide customers with necessary process support.
Senior Technician
Nuclear Fuel Complex
07.2019 - 03.2020
Completed preventive maintenance on set schedules.
Performed troubleshooting and diagnosis on malfunctioning equipment.
Monitored spare parts inventory and addressed shortages with purchasing personnel.
Completed job reports and logs immediately following service calls.
Inspected equipment to identify areas of wear or causes of malfunctions.
Checked and resolved the mechanical breakdowns in various cold pilgering mills operating in the plant.
Overseen the ladder logics in Siemens PLC's for the pilgering operation and helped in the resolution of instrumentation related issues.
Project Engineer
Sitra Infotech Pvt. Ltd.
06.2015 - 09.2018
Responsible for the maintenance of 21 no’s of GE-FANUC 90-70 series RTUs & EC-SCADA Systems supplied at TROMBAY PAKNI PETROLEUM PIPELINE (TPPL) in HPCL Mumbai Refinery by ECIL.
Developed preventive maintenance schedules to minimize downtime and optimize performance.
Rewired and replaced faulty electrical components in equipment.
Worked under various installation projects related to industrial automation at multiple cities.
Quality Analyst
Linkwell Telesystems
08.2014 - 01.2015
Conducted performance tests on single phase energy meters to validate its operation and proceed for dispatch to various electricity boards pan India.
Prepared reports of all the energy meters tested on the test benches and saving it in the official records for the management.
Addressed non-conformance issues, pausing production to correct errors.