Summary
Overview
Work History
Education
Skills
Accomplishments
Personal Information
Languages
Projects
Disclaimer
Languages
Software knowledge
Timeline
Generic
UPPALWAI RAMAKRISHNA

UPPALWAI RAMAKRISHNA

Hyderabad

Summary

Forward-thinking and disciplined with an unsurpassed work ethic and in-depth experience in installing, repairing, maintaining and inspecting electrical systems. Successful at planning, managing and evaluating team and subcontractor work according to quality, safety, and compliance standards.

Overview

6
6
years of professional experience

Work History

Senior Electrical Engineer

VISHWANTH PROJECTS LTD
Hyderabad
03.2024 - Current

ELECTRICAL SITE ENGINEER

LAXMI TRANSMISSIONS
Hyderabad
06.2018 - 03.2024
  • 6 Years of practical experience in core projects:
  • Expertise in TRANSFORMER ERECTION
  • Expertise in Erection of substation struture & equipments like Circuit breaker, CT, PT, CVT, LA, ISOLATERS,
  • Expertise in the field of construction Engineering
  • Construction in Electrical substations 400/220/132/33KV Switch Yard.
  • Expertise in Transmission line system like Foundation, Erection, Stringing (up to 220kv level)
  • 400/220/132kv Substation equipment erection, busbar stringing, jumpering, construction of cable duct, cable laying,control panel erection,equipment erthing ,stringing of earthwire,OPGW stringing.
  • Supervise the execution of site work such as survey
  • Estimate the requirement of Transmission line and substation Materials & Preparation of Stringing chart etc
  • Monitoring projects, Contractors, Cost & Resource development by progress report and maintaining track for the timely execution of project
  • Responsible for project coordination, regular follow-up with head office & client and addressing the issues of site.
  • Performed site surveys to identify existing power systems and equipment.
  • Participated in meetings with clients or contractors to discuss project objectives, status updates.
  • Coordinated with suppliers, contractors, and clients to ensure project success.
  • Prepared daily project status updates to inform staff and document project changes.

Education

Batchler of technology-B Tech - Electrical and Electronics Eng

JNTU
JNTU HYDERABAD
06-2015

Skills

  • Cable laying
  • Grid Earthing
  • Budget Preparation
  • Labor Estimates
  • Equipment specifications
  • Safe work standards
  • Knowledge on switchyard Equipments
  • Busbar stringing
  • Technical Drawings and Schematics
  • Testing instruments like multi meter,Megger,Clamp meter
  • Able to read layout,Single line diagrams,Shop drawing
  • Periodic maintenance of all electrical equipments

Accomplishments

  • Two nos of 400kv transformer bays competed in 11 months.
  • 42 towers of 132kv line foundations completed in one month period.
  • 240 mt weight of 132 kv line towers erection completed in 30 days of duration.
  • 21 kms of cable laying competed with in the period of 3 days.

Personal Information

  • Title: ELECTRICAL SITE ENGINEER
  • Date of Birth: 05/06/93
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married
  • Visa Status: Visit Visa

Languages

  • English
  • Hindi
  • Telugu

Projects

  • 400kv substation(DICHPALLY),
  • TS TRANSCO,
  • In this substation by using 500MVA Power Transformer we step down the voltage from 400kv to 220kv and this 220KV fed to 132KV substation
  • TS TRANSCO. 220/132 KV SUBSTATION and 132KV LINE(UTHOOR TO ADILABAD,57KM),
  • TS TRANSCO,
  • Hear substation 220KV stepped down to 132KV and from this we construct 132KV line from utnoor to adilabad. In this 132kvstepped down to 33kv, this 33kv fed to TSNPDCL.
  • 132 KV SUBSTATION and 132KV LINE(kamareddy),
  • TS TRANSCO,
  • We constructed 132KV(8.4 KM of) line from KAMAREDDY TO THALAMADLA RAILWAY STATION .At Thalamadla railway station we are step down to 33kv by using 63MVA Power Transformer,this 33kv fed to south central railway for rail traction Purpose.
  • 220KV SUBSTATION MANCHIPPA (UNDER THE KALESWARAM LIFT IRRIGATION SCHEME),
  • TS TRANSCO,
  • In this substation by using Two 31.5MVA Power Transformers 220Kv Stepped down to 33KV and this 33KV fed to IRRIGATION Department for run the motors.

Disclaimer

I sincerely believe the above mentioned facts are true to my knowledge and belief.

Languages

English
First Language
English
Upper Intermediate (B2)
B2
Hindi
Upper Intermediate (B2)
B2
Telugu
Proficient (C2)
C2

Software knowledge

MS WORD

MS EXCEL

Timeline

Senior Electrical Engineer

VISHWANTH PROJECTS LTD
03.2024 - Current

ELECTRICAL SITE ENGINEER

LAXMI TRANSMISSIONS
06.2018 - 03.2024

Batchler of technology-B Tech - Electrical and Electronics Eng

JNTU
UPPALWAI RAMAKRISHNA