Results-oriented Technical Lead with expertise in enhancing team performance and driving organizational growth. Leverages advanced technical skills to improve profitability and elevate customer satisfaction. Focused on fostering collaboration and innovation to support professional development. Aiming to contribute to an organization that values strategic leadership and continuous improvement.
Overview
1
1
Language
16
16
years of professional experience
Work History
Manager-Electrical
SEMBCORP ENERGY INDIA LTD (SEIL)
04.2011 - Current
Executed safe, reliable, and efficient operations of power plant electrical systems, troubleshooting turbo-generators (4x660 mw), 400 kv transformers, GIS/AIS switchyards, protection and metering systems, HT/LT switchgears, motors, EDGs, batteries, and overseeing spares inventory.
Managed operations of significant power complex in southern India with four coal units rated at 660 megawatts each. Secured total output of 2,640 megawatts while maintaining diverse asset portfolio totaling around 4.9 gigawatts.
Evaluated project specifications, designs, and drawings submitted by consultants and EPC contractors.
Supported project teams in meeting engineering standards specifications and quality through technical assistance.
Assess and authenticate electrical SLDs related to HV/MV/LV panel cable schedules and interconnection charts in compliance with IEC standards and contractual specifications.
Facilitated collaboration among consultants, contractors, clients, government authorities, and SRLDC to enhance project execution and maintenance.
Conducted project evaluations and conveyed constraints to senior management.
Directed spares and inventory functions effectively with SAP.
direct installation, testing, commissioning, operation, and troubleshooting of electrical systems such as transformers, generators, switchgears, motors, battery banks, EDGs, GIS/AIS substations, and drive systems.
Synchronized panel configurations to improve operational alignment.
Implement root cause analysis (RCA) with fishbone analysis to diagnose and correct recurrent equipment failures.
Oversee MOC processes for improved reliability and secure operations
Facilitate technical assistance and perform factory acceptance tests (FAT) for major electrical equipment validating compliance ahead of shipment.
Assess commissions and submit finished projects to clients.
Implemented installation of six power transformers: Telk (6x270 MVA 400 kV) and Alstom (6x260 MVA 400/22 kV). Spearheaded project for bus reactors: Telk (2x90 MVA 400/11 kV) and Schneider (40 MVA 22/11 kV). Ensured safety compliance in management of distribution transformers.
Supervised complete rectification processes for generator power transformers in factory.
substations: air-insulated substation (ais) including 4 lines at each station using dual 2x400 kv.
excitation systems: static excitation system incorporating ABB converters.
Optimized system safety by deploying Siemens Siprotec protection relays. Enhanced reliability through installation of Schneider protection relays. Ensured effective fault management with ABB protection relay integration. Incorporated GE relays for superior operational oversight.
Integrated Schneider EMS into energy management practices for better performance. Created Bus Transfer Scheme (BTS-2000) to ensure seamless power transfer. Enhanced energy monitoring capabilities using advanced management technologies.
rotating systems: heavy-duty motors up to 11 MW AC/DC drives (ABB).
high voltage switchgears; low voltage pmcc & mcc.
Executed maintenance on backup power systems, comprising Exide battery banks and chargers up to 630 A. Managed six EDGs with 1500 kVA capacity at 440 V for uninterrupted operations. Implemented preventive measures to optimize performance of backup systems. Conducted detailed inspections to uphold system integrity and reliability.
Administered auxiliary systems, emphasizing electrostatic precipitators with associated rectifier transformers. Led operations for electro-chlorination systems, integrating both electrolysers and rectifier panels. Conducted thorough assessments of electrostatic precipitators to sustain high efficiency. Improved reliability of electro-chlorination systems through consistent oversight and fine-tuning.
Managed material handling operations, focusing on conveyor belt systems equipped with stacker-reclaimer VFD drives, inverters, and converters.
Engineer-Electrical
PRIYA CEMENT LTD
06.2010 - 04.2011
Executed safe and efficient installation, testing, commissioning, maintenance, and troubleshooting of cement plant electrical equipment, such as protection systems, HT motors, HT and LT switchgear, and metering systems.
Installation, Commissioning, Maintenance, Operation, Trouble shooting of Electrical systems such as Generator and Associated Auxiliary Distribution Systems
Installation, Testing, Commissioning Maintenance, Operation, Troubleshooting of various Protection relays (Generator relay & Motor protection relays), Synchronization panel & Excitation system, Metering panel, LAPT panels, NGR, Transformers.
Directed project team on engineering standards, project specifications, and quality assurance, ensuring alignment with industry best practices.
Reviewed and authorized various electrical SLDs, HV, MV, and LV panel drawings and documentation, ensuring compliance with customer contracts and IEC standards.
Reviewed and authorized the cable schedule and interconnection chart.
Analyzed project specifications, contract drawings, and BOQ to understand the scope of work outlined in the contract.
Reviews and studies in details & is aware of the scope of works described by the contract document, project specifications, contract drawings & BOQ
Developed project plans and tracked progress, communicating status to upper management.
Familiar in working with RCA & Fish bone analysis to identify the potential root cause of component failures identified / reported.
Equipment’s Worked on: ProtectionRelays, LT AC & DC Motors, HT & LT Switch gears, Governing control system, Vibration monitoring system, Battery Banks and Battery charger, Pressure switches, Transmitters, Control valves, Actuators, RTD, Speed sensor, Vibration probes, CPC converters, BTG interlocks implementation
Implementation of logics and modifications at site.
Implementation of logics and modifications at site.
Planning & monitoring of project progress and intimating to higher management.
Preparing daily progress reports and highlighting the constraints to the higher management.
Created operational guidelines & SMPS and QAPS.
Oversaw various equipment types: ProtectionRelays, LT AC & DC Motors, HT & LT Switch gears, Governing control system, Vibration monitoring system, Battery Banks and Battery charger, Pressure switches, Transmitters, Control valves, Actuators, RTD, Speed sensor, Vibration probes, CPC converters, BTG interlocks implementation
Education
B.E - Electrical & Electronics Engineering
NBKR
Nellore, A.P
01-2010
Skills
Electrical systems management
Electrical safety compliance
Emergency response planning
Project execution
Project coordination
Skilled in SAP software
Strategic planning
Partnership development
Team leadership
Decision-making
Time management
Timeline
Manager-Electrical
SEMBCORP ENERGY INDIA LTD (SEIL)
04.2011 - Current
Engineer-Electrical
PRIYA CEMENT LTD
06.2010 - 04.2011
B.E - Electrical & Electronics Engineering
NBKR
DECLARATION
I here by declare that the information furnished above is true to my knowledge and belief. Place: NELLORE Date: (V.Anish)
Senior Section Engineer (Electrical) at Integral Coach Factory, Ministry of RailwaysSenior Section Engineer (Electrical) at Integral Coach Factory, Ministry of Railways