Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

VANAPALLI V Surya Sairam

Senior OLE Design Engineer
Bangalore

Summary

To associate with an organization, which progresses dynamically and gives me a chance to enhance my skills and be a part of the team that excels and works towards the growth of the organization. To strive for excellence in the Design of Rail Systems- Overhead Line Equipment with dedication, focus, proactive approach, positive attitude and passion. PROFILE SUMMARY Offering a Full Time Graduate Degree in Electrical & Electronics Engineering. Overall 9 yrs. of experience of OLE projects in the Rail/Electrification sector in the UK & India and overseas having working experience of 1year as OLE Design Engineer. Specialities: OLE standards, Design, Report writing, S&C Renewals, Bonding, Switching

Overview

10
10
years of professional experience
1
1
Language

Work History

Design Engineer

OLE, WS Atkins India Pvt. Ltd
09.2014 - Current

Design Engineer

OLE
05.2017 - 03.2018
  • Fully acquainted with various UK rail electrification systems, basic designs, specifications and standards for application in 25 kV AC OLE basic and allocation designs
  • Projects Involved
  • Role & Responsibility
  • TransPennine Route Upgrade (Leeds station platforms 4-6):
  • Produced designs for Form A, Form B and AFC detailed designs which involves the preparing the Form B reports, Layout Plans, Wire Run Validation, Cross Section, Switching Cross sections, Clearance Cross Section, Design Risk Assessments, Design Decision Log, Bridge Designs and preparing 3D Layout
  • Identification of the OLE structures which will be affected by the proposed P Way design
  • Changes to the OLE to accommodate S&C remodelling
  • Modifications on the Isolation Diagram as per the design changes on the Platform Area and updated the other documents
  • Modifications to existing OLE structures to accommodate the track changes and compliance to GL/RT/1210
  • TransPennine Route Upgrade (Leeds station platforms 0-3):
  • Involved in Grip 7 stage
  • Updates/modifications are done for Layout plan, Cross sections (includes Switching, Clearance and Bridge) as per site verified details
  • Cantilever Built sheet and site survey details are used to update the Layout plan and associated Drawings
  • Midland Main line (MMLE) – London to Corby: Working in-between Bedford to Kettering (40 Construction units) and
  • Kettering to Corby (8 Construction units) (Phase 1)
  • Worked for trial hole, Layout freeze stages, Form B stages and AFC stages and site technical queries
  • Successfully Produced Layout plans for Layout freeze stage, Form-B and AFC stage with TADPOLE Software
  • Worked on Layout plans (3D and 2D model), Cross section Drawings, Allocation sheets, Clearance X/S and Bridge X/S
  • Produced Design risk assessment, Design logs, DEP schedule, Foundation Schedule, Dropper Schedule Deviation and Derogation register and Form B Documents
  • Checking Validation sheets with Heights & stagger survey details, Bridge heights, Clearance studies by generating reports
  • Checking of OLE Assessments, producing Compatibility reports
  • Seconded to SPL for site support works on Midland Main Line Electrification Project sorting out the queries and updated the design raised by the construction team.2
  • Worked in the UK, Derby office on 1-year secondment, ) and co-ordinating designs on Midland Main Line Electrification Project
  • Mentoring and Checking the designs produced by junior engineers
  • North West Electrification Project -NWEP As-Built (Phase-4) - Area3,4 and 5
  • Involved in producing designs for GRIP stage 4-5(Detailed Design)
  • Produced Layout plans for Layout freeze stage and Form-B and working for AFC with TADPOLE Software
  • Worked on Layout plans (3D and 2D model), Cross section Drawings, Allocation sheets, Clearance X/S and Bridge X/S
  • Produced Design risk assessment, Design logs, DEP schedule, Dropper Schedule Deviation and Derogation register and Form B Documents
  • Checking Validation sheets with Heights & stagger survey details, Bridge heights, Clearance studies by generating reports
  • Checking of OLE Assessments, producing Compatibility reports
  • Great Western Electrification Programme, Route section 2 Bonding
  • Preparation of Bonding Plans for 25 Construction Units of Route Section 2 of Great Western Electrification Programme as per the standards
  • Crossrail North East Infrastructure
  • Preparing Switching Cross section for Chadwell Heath and Nags Head
  • Coordinating with other design offices and integrating designs prepared
  • Major project experience (milestone achieved):
  • TransPennine Route Upgrade (Leeds station platforms 4-6)
  • Midland mainline electrification work – MMLE – GRIP 5 - Detailed design
  • NWEP Phase 4 Electrification works – GRIP 5 – Detailed design

Asst. Engineer

E Transportation India PVT. LTD
09.2012 - 08.2014
  • Preparation of Layout Plans, Cross Section Drawings, Structural Erection Drawings,
  • Bridge Profiling and clearances for Indian Railway Electrification
  • Preparation of Layout Plan, Bridge Profiling and Clearances and basic design knowledge in Cross Section Drawings and Allocation chart for UK Railway (NETWORK RAIL) Electrification systems
  • Preparation of Spread sheets and calculations
  • GVK Tokisud (East Coast Railways Division)
  • Responsibilities:
  • Preparation of Profile Drawings
  • (i) Preparation of Profile calculations
  • (ii) Clearance study under the over bridges/structures
  • Project 2: Waltair Division Construction (East Coast Railways Division) (Alamanda-835-837KM, TKM-6.75)
  • Responsibilities: (i) Preparation of Sectioning Drawing According to the Modification Done in Engineering Plan
  • (ii) Modification of Existing Layout Plan (i.e., change in Cross Over’s, Buffer end and Main Line Track Slue According to given Engineering Plan) (iii) Modification and Re-Arrangement of Mast and Portal and TTC position and adjusting of Obligatory Structure and IOL and UIOL
  • Project 3: ATKINS-Test Project Design (Modification and S&C renewal for Penrith
  • Station)
  • Responsibilities: (i) Preparation of model CSD &model Allocation Chart
  • (ii) Modification of Layout plan as per modification of P-Way data.

Education

B. Tech - Electrical and Electronics Engineering

JNTU

Intermediate - undefined

Board of Intermediate Education

SSC - undefined

Board of Secondary Education

Skills

ATF Design, Layout Plan Production, Cross section, Allocation Design, preparation of OLEundefined

Accomplishments

  • (i) Member of IET
  • Strengths: (i) Always focused on delivering good Quality service to the Customers
  • (ii) Proficient at setting priorities and meeting goals
  • (iii) Good communication and interpersonal capabilities
  • (iv) Can learn any application as quickly as possible
  • (v) High ownership for the Works assigned, excellent team player with problem-solving and trouble-shooting capabilities.

Timeline

Design Engineer

OLE
05.2017 - 03.2018

Design Engineer

OLE, WS Atkins India Pvt. Ltd
09.2014 - Current

Asst. Engineer

E Transportation India PVT. LTD
09.2012 - 08.2014

B. Tech - Electrical and Electronics Engineering

JNTU

Intermediate - undefined

Board of Intermediate Education

SSC - undefined

Board of Secondary Education
VANAPALLI V Surya SairamSenior OLE Design Engineer