Detailed-oriented Senior Electrical Engineer with 8 years and 6 months of experience in the electrical engineering industry. Superior problem-solving and time management abilities. Adept at diagnosing malfunctioning systems and identifying the cause of breakdown. Excellent skills in Operation of Drives & Electrical Utilities.

Skills

    Project Management

undefined

Work History

EIA InCharge

Solapur Bio-Energy Systems Pvt.Ltd
Solapur
03.2022 - Current
  • Supervising, Monitoring and controlling of operation activities and ensure power availability, efficiency with safety at work place along with plant machineries.
  • To ensure smooth operation of plant and maximize power export to Grid.
  • Operation & Maintenance, Troubleshooting of Gas engines having generation capacity of 3 MW.
  • Determined suitable crew requirements, scheduled employees and worked with human resources to meet changing production schedules.
  • Assessed manufacturing processes and recommended improvements to increase productivity.
  • Studied department operations to assist with development of new or improved methods of tooling and production processes.
  • Managed continuous improvement initiatives to drive gains in quality, flow and output.
  • Reviewed maintenance and repair problems to determine appropriate action for resolution.

Site In_Charge

M/s. Chimatech Projects Private Limited
Pune
06.2016 - 03.2022
  • Prepared technical documentation for operation, troubleshooting and maintenance of industrial systems.
  • Participated in team-building activities to enhance working relationships. Improved operations through consistent hard work and dedication.
  • Proved successful working within tight deadlines and fast-paced atmosphere. Carried out day-day-day duties accurately and efficiently.
  • Eliminated downtime and maximized revenue by providing top project quality control. Worked closely to maintain optimum levels of communication to effectively and efficiently complete projects.
  • Managed team of 40 employees, overseeing hiring, training, and professional growth of employees.
  • Served as lead project engineer and manager on 2 operation & maintenance projects.

Electrical Testing and Commissioning Engineer

M/s. Voltech Engineers Private Limited
Chennai
08.2014 - 05.2016
  • Extensive experienced in testing, commissioning & troubleshooting of utilities and equipment in power plants & switch yards such as transformers, circuit breakers, protection relays, CTs, PTs, control & relay panels etc...
  • Able to through scheme drawings and can modify as per site client requirements.
  • Performed pre commissioning checks, CT primary & secondary injection, transformer differential stability tests.
  • Experienced in control & relay panel checks, preparation of test reports and cable schedule for substations, power plants, process plants.
  • Monitored safety compliance to maintain strict standards and protect team members from harm.
  • Executed installation and commissioning projects for electrical distribution and controls and automation systems.
  • Hired and trained new workers to improve efficiency of department and cultivate productive work atmosphere.
  • Reviewed and studied blueprints to double-check installation and implementation project requirements.
  • Managed escalations from direct reports during testing and commissioning phase of project.
  • Managed & Served as testing & commissioning engineer for 8 different projects like Power plants, Air insulated Substations, process plants & traction substations with coordination with various clients namely ABB, Siemens, NCC, L&T etc...

Education

Bachelor of Technology - Electrical And Electronics Engineering

Srinivasa Institute of Engineering And Technolgy
Amalapuram
09.2010 - 05.2014

Additional Information

Experience : 8.6 Years

Notice Period : 1 month

Projects Handled So far Successfully

1. Project: 400 TPD Capacity Municipal Solid Waste Plant, Solapur, Maharashtra.

Customer: Solapur Municipal Corporation, Maharashtra.

  • Load management during the time of power crisis situations like breakdown/shutdown of DGs, Grid fail condition.
  • Programming, Operation & Maintenance of VFDs of make ABB, Siemens, Danfoss, Allen Bradley of different ratings of various stations as plant auxiliaries.
  • Operation & General maintenance of PLCs make ABB, Allen Bradley, Schneider electric etc.…
  • Provide Guidance in the technical assessment of operation and enhancement activities identifying possible solutions for plant in case of any Breakdown.
  • Responsible for minimum breakdown of electrical machinery of the plant.
  • Responsible for Monthly JMR (Joint Meter Reading) and prepare Co – Generation bill.
  • Operation & Maintenance of instruments like pressure transmitter, level transmitter, gas flow meters etc.….
  • Operation and Maintenance of Motors Having Various Ratings.
  • Operation & Maintenance of Chiller units, AHUs, Air Compressors, Boilers & DG sets.
2. Project: 50 MLD WTP Assonora, PWD, Goa. Customer: Public Works Department, Goa.
  • Experienced in Operation and Maintenance of Overall Water Treatment Plant for Transferring Raw Water to Filter Water and Then Converted to Pure Water by Pumping Process and Sterilizing Water by Mixing Chemicals with Mixers to Improve Purity of Water and Working With all Operation Processes Regarding Purification of Water.
  • Operation and Maintenance of All Electrical Equipment & motors with Maximum Rating of 582 KW.
  • Maintenance of Complete Plant 24*7 Round Clock Process.
  • Operation and Maintenance of 33 KV Substation with Two No. of Bays.
  • Operation and Maintenance of Motors Having Various Ratings.
3. Project: 220/11kV Substation, Kutch Branch Canal Project. Customer: SSNNL, Bhachau, Gujarat.
  • Successfully executed the O&M project of 220/11kV S/S in Pumping Stations-1,2&3.
  • Transformer Stability Test of 25 MVA 220/11 KV Has Been Done.
  • Coordinated with CTR Service Engineer for Commissioning of NIFPS System in 220/11 kV PS1 Sub Station.
  • Coordinated with Service Engineer for Commissioning of DGA (GE) in 220/11 kV PS1 Sub Station.
  • Trained Engineers and Technicians Regarding Substation Equipment There by to Enhance Safe Work Practice Knowledge.
  • Coordinated with Clients Regarding Project Execution and Submission of Testing and Commissioning Log Books.
4. Project: 132/25 KV Traction Substation, Bissum Cuttack, Orissa. Customer: RE & TRD.

Client: M/s L&T Constructions Limited.

  • Prepared Cable Schedule for 132/25 KV System.
  • Testing and Commissioning was done for 132/25 KV S/S Containing Two No. of Bays.
  • Erection and testing of three 132/25 KV Transformers.
  • Prepared Interlocks for OLTC Operation.
  • Scheme Checked Thoroughly Control Relay Panels and Auxiliary Relays are Tested.
  • Testing and Commissioning has been done for 30MVA Transformer.
5. Project: 132/25 KV Traction Substation, Khairthal, Rajasthan. Customer: RE & TRD.

Client: M/s Tata Projects Limited.

  • Prepared Cable Schedule for 132/25 KV System.
  • Tested and Commissioned 132/25 KV S/S Containing Two No. of Bays.
  • Coordinated with Protection (Relay) Engineers in Testing and Commissioning of Relays ASIDHA ADR 221B (O/C & REF Protection), ADR 213B (T/F Diff Protection), ADR 219A (Feeder Protection & Distance Protection), ADR 221C (Non-Directional IDMT O/C & Current Unbalance relay), ADR 212B (IDMT Over/Under voltage Protection) Relay in 132 KV System.
  • Prepared Interlocks for OLTC Operation as Per Schematic Drawings.
  • Scheme Checked Thoroughly for Control Relay Panels and Auxiliary Relay Testing.
6. Project: Tata Power Receiving Station, Mumbai. Customer: Tata Projects Limited.

Client: M/s ABB India Limited.

  • Tested & Commissioned 33 KV HT Panel Board and Power Transformer.
  • Scheme Checked Thoroughly for 33 KV and 415V Switchgear.
7. Project: 2*67.5MW STG Thermal Power Plant, Cuttack, Orissa. Customer: OEG & BPPL.

Client: M/s Siemens Limited.

  • Testing & Commissioning activities was done for NGR, LAPT, AVR, RMP, Battery Charger.
  • Testing and Commissioning was done for CT, PT, and ACB in 415V Switch Gear Made of L&T.
  • Tested OC & EF Relays (REF 615) Made by ABB Ltd.
  • Scheme Checked Thoroughly for Synchronizing Panels and Control Relay Panels.
8. Project: 2*660MW Thermal Power Plant, Nellore, Andhra Pradesh. Customer: NCC PPL Limited.

Client: M/s ABB India Limited.

  • Testing and Commissioning activities was done for CT, PT, Vacuum Circuit Breaker in 11 KV, 6.6 KV & 3.3 KV Switchgear Made of ABB.
  • Testing and Commissioning was done for CT, PT, Air Circuit Breaker in 415 V Switchgear Make of C&S.
  • Wide Knowledge of OC & EF Relays (REF 615), Motor Protection Relays (REM 610), Transformer Protection Relays (RET 670) Made by ABB Ltd.
  • Testing & Commissioning of 1.6 MVA, 2 MVA, 8.5 MVA, 10 MVA, 15 MVA and 25 MVA Transformers were done Successfully.
  • HI-POT Test Done for H.T Cables.
  • Testing and Commissioning has been done for 415V PMCC Panels.
  • CRM Test Conducted for Bus Bars and Bus Ducts.
  • H.V Test Conducted for Cables and Bus Ducts.
  • Scheme Checked Thoroughly for 11 kV, 6.6 kV, 3.3 kV and 0.415 kV Switch Gear.
9. Project: 400/220 KV Substation, Kartarpur, Punjab. Customer: PowerGrid Corporation of India Limited. Client: M/s. Kalpataru Power Transmission Limited.
  • Testing of C.T, P.T, and SF6 Circuit Breaker has been done Successfully.
  • Testing & Commissioning has been done for 400 KV Two Line Bays and One Tie Bay System (1½ Scheme).
  • Testing and Commissioning of Reactor and NGR was done Successfully.
  • Commissioning Activities has been done for Isolator and Circuit Breaker Operation.

Checked Local Remote Operation of Circuit Breakers & Isolators Along with Interlock Circuitry. Scheme Checked Thoroughly for Control Relay Panels and Tested Auxiliary Relays

Personal Details

Date of Birth : 01-06-1992.

Nationality : Indian.

Sex : Male.

Marital Status : Married.


Declaration

I consider myself familiar with Electrical Engineering Aspects. I am also confident of my ability to work with safety.

I hereby declare that the above details are true to the best of my knowledge and belief, I assure you sir if I had a chance, I will execute my work to the fullest Satisfaction of the Organization.




Your's faithfully,

Vara Prasad Peddireddy

Overview

8
8
years of professional experience
4
4
years of post-secondary education
3
3
Languages
Vara Prasad PeddireddyEIA In_Charge