Results-driven Civil Engineer with over 15 years of experience dedicated to excellence. Skilled in project execution, cost control, and fostering collaborative environments. Proven track record of efficiency, reliability, and strategic planning. Known for optimizing processes, leading teams, and seamlessly adapting to changing requirements while driving results. Strong communication and conflict resolution skills valued by employers.
Initiated process improvements based on thorough analysis of internal operations data resulting in enhanced productivity levels.
Managed cross-functional projects, ensuring timely completion and alignment with company objectives.
Led team meetings regularly to discuss progress updates, identify challenges or roadblocks, and provide guidance towards successful project completion.
Collaborated closely with senior management on strategic planning efforts, aligning departmental goals with overarching company objectives.
Enhanced team productivity by implementing efficient project management strategies.
Mentored junior team members, contributing to their professional growth and skill development.
Execution of Gravity Canals, lining for canals, Earthen dams, MS pipelines (2.15 m to 1.0 m), Pipelines (1.7m, 1.6m), Preparation of monthly planning programs, Review meeting data, targets and financial projections, Estimation of BOQ of Total project including concrete works, Preparation of Dept. bills, Recording of Measurement books, Submission in divisional office and related documentation, correspondence for total site works.
Execution of Gravity Canals, lining for canals, earthen dams, as a site in charge responsible for administration of camp, material issues and material management along with regular execution of canal works for the overall site.
Sr.Field coordinator- CIVIL
KEC International ltd.
01.2012 - 08.2012
Project Name: Singhpur canal project, 47 crores
Execution of main canal of 22 km length and its CM CD works (VRB, DLRB, SLRB, SYPHON, OFF TAKE, DROPS, ESCAPE...ETC), Site management with all respects including material arrangement, alignment, designs of canal and structures (data collection, submission and approval), site monitoring, Dept. bills Submission online through PMS (project monitoring system).
Execution of canal works, Main canal and CM&CD works, Deep canal cutting of 30 m Depth, Blasting works, Sub contractor bill preparation.
Execution of MS-pipe, GRP-pipe, HDPE-pipe lines from Dia 2100 mm to 203mm including all aspects, Supervision of open blasting, control blasting, Execution of Earthen dams, Pump houses, Dept. bills preparation, Public relationship, local problems resolving.
Established strong working relationships with clients through exceptional communication skills, fostering trust and collaboration.
Achieved successful project outcomes by maintaining accurate documentation and meeting strict deadlines.
Site Engineer -CIVIL
AKRCL LTD
05.2008 - 05.2009
Project Name: Barrage & Bridge on Penna River , Cost -147 crores
Earth work excavation, z-sheet piling work, executions of concrete works, preparation of bar bending schedule as per drawings, Dept. bills preparation, managing workmanship, and machinery.
Checked technical designs and drawings for adherence to standards.
Coordinated with subcontractors ensuring their work met project specifications as well as monitored their progress towards completion deadlines.
Education
B. TECH - CIVIL ENGINEERING
01.2004 - 01.2008
INTERMEDIATE - MPC
01.2001 - 01.2003
SSC - undefined
01.2000 - 01.2001
Skills
Budget oversight
Software
Autocad 2024
Google earth pro
Arc GIS
Ms office 365
Ctc
13.00 lakhs, 15.00 lakhs
Disclaimer
I hereby declare that the details furnished above are true to the best of my knowledge.