Managed Air side&Land side MEP projects with precision & efficiency.
Oversaw the construction of key facilities such as the Airport Admin Building, Integrated Air Cargo Terminal, Hazardous Waste Facility, Hospital/Health Facilities, and Police Station, specifically focusing on MEP packages (HVAC, Fire Fighting, Electrical&Plumbing).
Conducted site inspections and monitored construction progress, identifying and resolving potential issues promptly.
Developed and maintained project documentation, including daily reports, inspection records, and progress photographs.
HVAC Site Engineer
Bhawan Engineering Company
09.2023 - 09.2024
Responsible for Health,Safety Environment (HSE) activities in the site daily
Installation of Air cooled chiller and Water cooled Chilled water system.
Preparing Material Inspection report and Measurement report and submit it to client monthly.
Check and verify Installation and Testing Commissioning,Technical Data sheet work of HVAC Equipment.
After Handover Maintaence and Operation of chiller planet system. (Operation&Maintainence)
HVAC / Mech Engineer
Mosanda Facility Management System
01.2022 - 02.2023
Maintenance and Operation Building Management System (BMS)
Execution of District Cooling System (DCS) Planet System.
After Testing & Commissioning Evaluate the performance of Chiller,Cooling Tower,Air Handling Unit.
Check and Verify Technical Specification Reports Chiller,Cooling Tower,Pump(Primary&Secondary Pump,Condenser Pump)...etc
HVAC Maintenance Engineer
Aramco Projects
10.2019 - 10.2021
Check and Supervise Installation and Maintenance of HVAC Systems. (Chiller, Split AC,Ductable AC,VRV System)
Testing and Balancing HVAC Air & Water Systems by Handling the Modern & Traditional Water&Air Balancing Equipments such as Digital Water Meter, Ultrasonic Flow meter, Micro Manometer, Anemometer, U Tube–Manometer, Tachometer, Clamp meter
Performance Checking of all HVAC Equipment’s Chiller, Air Handling Units, Pumps, CoolingTower, Fan Coil Units, Ductable and Package units.
Prefer Preventive Maintenance Reports and Performance reports, Logbooks
HVAC Service Engineer
Shri Vignesh Air Conditioning
09.2017 - 10.2019
Assist the Commissioning Team on Testing, Adjusting&Balancing (TAB)stages of the HVAC system.
Maintenance of the HVAC Systems&Trouble shooting.
Check and Rectify Chiller Breakdowns and Service.
Maintenance and operation of Chilled Water Systems (Air Cooled and Water-CooledChiller)
HVAC ENGINEER-Metro Projects
Conquer Cooling Solution Pvt Ltd
05.2014 - 08.2017
Checking the heat load actual Ton Range of Air Handling Unit (Method ofpsychrometric chart, DBT, WBT, Enthalpy)
Check and Calculate Cooling Tower Heat Load, Efficiency and Performance.
Checking Carbon di oxide level and Noise level HVAC Equipments HSE Standards
Performance checking of all Central Air Conditioning parameters (Actuator,Thermostat, Pump, BTU Meter,..etc