An innovative, multi- disciplined and solution oriented Network Engineer, possesses huge experience track record of Network monitoring, designing, implementing and integrating cost effective, high performance technical solution.
Overview
12
12
years of professional experience
Work History
HATHWAY CABLE & DATACOM LIMITED
10.2021 - Current
Routing
Maintaining the connectivity
Troubleshooting routine problems and maintenance of servers
Proficient in best networking practices
Key Responsibilities Handled
Network for redesign for branches / Campus Location
Troubleshooting of complex LAN/WAN infrastructure, including routing protocol EIGRP, OSPF
Setting of networking devices (Cisco routers, switches) co-coordinating with system / Network Administration during implementation
Configure network access servers and routers
Working troubleshooting of complex LAN/WAN
Administration of Cisco Equipment’s using Cisco Works
Upgrading and backup of Cisco routers configuration files
Implementing and maintaining backup schedule
NOC” Executive
Role & Responsibilities:-
Monitoring the network using Zabbix, Whatsup Gold and cacti(Graph)
Commissioning, designing and implementations of WAN ILL and local loop connectivity through leased lines
Support for the 24
7 internet connectivity of 200+ corporate customers
Responsible for the 24
7 internet connectivity of 50’s pop locations which is connected through leased lines, modems and Cisco to backbone Data Centre’
Shift/balance traffic in BGP links and P2P links
Coordination with telecom providers like Bharti, & Jio for link outage and maximum uptime
Providing Implementation/Configuration Support to field Engineers/Customer for the troubleshooting network for the troubleshooting network and hardware related issues
Management and Maintenance of devices including Routers, Switches and various modems
Troubleshooting for finding root cause related to hardware malfunctioning configuration supported
Troubleshooting the network related issues as per the escalation matrix
WAN ILL links monitoring and preparation of total bandwidth utilization and outage reports on daily basis.
Asst. Manager
Karam Industries, PPE’s
10.2014 - 12.2019
Responsible for the All Type of Maintenance Activities for the Injection Molding, Molding Assembly Line, SPM (Special Purpose Machine) Machines, Other Process Related Machine
Spare Parts Planning & Deft in Material Procurement as per Maintenance Schedule and requirement
Making Daily MIS (Management Information Sheet) & Monthly Utilities Report
Commissioning and erection as well as conducting tests and inspection of operational effectiveness
Planning for Critical Spares, ensuring availability of Machine Spares and Procurement
Co-ordination with Suppliers/ Vendors on Machine Interruptions Independently
Ensuring Safe work Place, Prepare risk Assessment (HIRA), Issuing Work permit and monitor
Responsible for Breakdowns, Lighting Systems, Earthing System, FHS in Plant
External Visits and Audit at Machine Mfr./Supplier End for new Up Coming Machines
Commissioning and erection as well as conducting tests and inspection of operational effectiveness
Executing cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction in Operations & Maintenance expenditures
Results of The Operational Activities in Field Job :-
Minimize the BD Trends of Injection Molding Machine from 3.1% to 2.2 % (In FY 2018-19)
Minimize the Energy cost from 3.9 % to 3.2 % By Implementing the Energy Management System and related Kaizen (In FY 2016-18)
Minimize The Maintenance spare Cost by Implementing Life Prolongation, Reuse after Repair Lower Cost Alternates in wide terms in Maintenance Dept.by Required activities.
Maintenance Engineer
08.2011 - 10.2014
Maintenance of LT & HT Panel, LDB, PDB, Circuit Breakers
To analyse the performance of the plant machinery, identify the cause of failure and develop the
Maintenance schedule to prevent future failure
Energy Conservation Initiatives
Knowledge of full process of Effluent Treatment Plant, Sewage Treatment Plant and Water Treatment Plant
Man power management and work distribution of team members
Supervision of Operation & Maintenance of Utility Equipment’s like ETP & STP Plant, RO, Cooling Tower, HVAC System, WTP Plant and Diff
Types of Pumps (Centrifugal Pump, Screw Pump and Dosing Pump), HP Pumps, Mixer, Centrifugal & Screw Compressor
Shift Handling, Man Power Deployment, Spare Material Maintain, Job Distribution
Achievements:-
Successfully reduced 5% energy cost by prevention of Air leakage
Replacing Tube light by the LED lights & prevention of unnecessary use of Machine motors and pumps
Cription : Testing of Generators, Load Testing (Inductive, Resistive), Production of Alternators and his Testing, Responsible for Preventive Maintenance Planning, To Maintain the Record & Documentation
Training & Seminar
Attended four days’ training on “Energy Monitoring System” conducted by CII, in 2013
Attended two days’ workshop on Advance Electrical Safety & Electrical Hazardous
Attended two days’ workshop on First Aid.
M/s Shree Vinay Engg. Services Pvt. Ltd, Tata Motors Ltd
Ahmedabad
08.2011 - 02.2014
Skills
Skills Setundefined
Additional Information
Extra-Curricular Activities:
, I had donated my blood in ROTARY CLUB & PARTHMA for the welfare of society
I had participated in Group Dance, Fashion etc. in THOMSO '07, '08 & '09 (a national level youth festival) at IIT Roorkee & 2nd prize in making Project, Robotics, Slide Presentation etc. in CONFLUENCE'08 (DJCET's Technical Festival)..
Timeline
HATHWAY CABLE & DATACOM LIMITED
10.2021 - Current
Asst. Manager
Karam Industries, PPE’s
10.2014 - 12.2019
Maintenance Engineer
08.2011 - 10.2014
M/s Shree Vinay Engg. Services Pvt. Ltd, Tata Motors Ltd