MS Projects


Mechanical Engineer with 6+ years of diversified experience in EPC project execution, Audits of structural and Mechanical components of CHP systems, pipe conveyors, mechanical erection, fabrication, commissioning, and O&M across major power plants and ports. Skilled in MS Project, planning, CMMS, preventive maintenance, and leading cross-functional teams.
Problem solving skills
The main aim of the project is to increase the productivity of the component. In this project two processes (i.e), connecter clip fixing and separator mounting can be done in single process
Client: TVS Sensing solutions, Madurai.
Results: Improved productivity, Manpower reduction, Reduction in time consumption, Reduction of work load to workers.
Based on normal arc welding techniques, It can be used to do 3G (vertical) welding and circular motion welding by pneumatics
Results: Increased in automation, Improved welding technique, Improved quality of welding.
By using the load cell we can find the maximum compression strength and maximum tensile strength of helical springs
Results: Improved load calculation, Minimized manual handling.
MS Projects
Auto CAD
Solid works
MS Office
I hereby solemnly affirm that the particulars furnished above are true and correct to my knowledge