Hardworking Electrical maintenance and project Engineer bringing 12 years of experience performing diverse maintenance and repair duties. Dedicated to maintaining optimal equipment functionality by managing routine and complex equipment and facility matters. Strong knowledge of hand and power tool operation and safety measures.
Overview
24
24
years of professional experience
7
7
years of post-secondary education
1
1
Language
Work History
Maintenance Engineer- Electrical
Kempegowda international airport
Bangalore
07.2001 - Current
Coordination with Consultant for the planning of Electrical Systems, Utilities and machineries
Maintain main power supply of the airside and the maintenance of the related power supply equipment’s in substation such as switch gears, transformers, DG sets and high /low voltage distribution panels, all the buildings electrical installations
To maintain, -I & III related AGL systems as per DGCA requirement
Frequently carrying out runway inspection for the both north and south runway to maintain high serviceability standards
Carrying out preventive, corrective and breakdown maintenance of AGL equipments like Constant Current Regulator (CCR), Microprocessor Based Constant Current Regulator (MCR), AGL cables, All types of AGL fixtures
Carrying out photometric test for the AGL fixture with both bench top and field to maintain 4C’s as per ICAO/DGCA requirement
Preparing & maintaining documentation required for DGCA & other ISO audits
Monitoring the functionality of AGL systems through ALCMS system and thereby coordinating with sub contract teams at all sub stations for timely rectification of issues
Monitoring the AGL systems through ILCMS system and attending the lamp failures immediately to maintain high serviceability standards
Planning and optimal utilization of weekly runway maintenance slot to avoid any breakdowns
Maintenance knowledge about DG Set, UPS & Building Lighting, motors, High mast, Stand ID boards
Troubleshoots plant electrical problems to determine their cause and recommend options for eliminating such problems
Includes carrying out tests on equipment
Make all the equipment’s annual preventive maintenance schedule and complete PM as per schedule
Condition Monitoring and Predictive maintenance of critical equipment and corrective actions to avoid breakdown
Determine the CAPEX project schedule by studying project plan and specifications, calculating time requirements, sequencing project elements
Maintains the CAPEX project schedule by monitoring project progress, coordinating activities, resolving problems
Execute the CAPEX project in safe and clean working environment by enforcing procedures, rules, and regulations
Coordination with various departments for smooth functioning of the equipment by feedback and suggestions from them
Identification of critical spare related to AGL system and timely coordination with procurement team for the purchase
Maintain the 5S implement in all material storage area.
Electrical Engineer
Cargill premix and nutrition India Ltd
Bangalore
10.2014 - 06.2019
Coordination with Consultant for the planning of Electrical Systems, Utilities and machineries
Maintenance knowledge about HT switchgears consist of VCB, ACB breakers, LT Motors with LT cable, Transformers, ups
Maintenance knowledge about DG Set with AMF panel, UPS & Plant Lighting, Chiller and AHU, RO, Boiler, pump, motors, Air compressor, ETP
Troubleshoots plant electrical problems to determine their cause and recommend options for eliminating such problems
Includes carrying out tests on equipment
Make all the equipment’s annual preventive maintenance schedule and complete PM as per schedule
Condition Monitoring and Predictive maintenance of critical equipment and corrective actions to avoid breakdown
Meet the maintenance financial objectives by forecasting requirements, preparing an annual budget, scheduling expenditures, analyzing variances and control the R&M cost within budget
Planning for resources and manpower for planned plant shutdown and execution including start-up
Daily Power monitoring, calculations and reporting at monthly basis
Develop the project objectives by reviewing project proposals and plans conferring with management
Proposed electrical product and system modifications to improve quality and efficiency.
Determine the project responsibilities by identifying project phases and elements and assign to contractor
Performed maintenance procedures and repairs on existing electrical products and systems.
Determine the project specifications by studying product design and performance standards completing technical studies preparing cost estimates
Determine the project schedule by studying project plan and specifications, calculating time requirements, sequencing project elements
Maintains the project schedule by monitoring project progress, coordinating activities, resolving problems
Control the project costs by approving expenditures
Prepares the project status reports by collecting, analyzing, and summarizing information and recommending actions
Execute the project safe and clean working environment by enforcing procedures, rules, and regulations
Prepare and complete the equipment qualification and submit the documents QA department
Material procurement through PAP and maintaining minimum spares for attending breakdown and reducing breakdown time
Coordination with various departments for smooth functioning of the equipment by feedback and suggestions from them
Maintain the 5S implement in all engineering area and shop floor
Continuous improvement for Kaizen and forecasting control
Conducting Safety audits within the department and ensuring the compliance from all the employees and updating the checklists and audit report
Executive engineer
Micro lab API
Bangalore
04.2014 - 10.2014
Coordination with Consultant for the planning of Electrical Systems, Utilities and machineries
Supervise and manage vendor engineering and equipment’s deliverable to ensure compliance with project standards and specifications
Reviewing and reporting of the project
Maintenance knowledge about chiller and AHU
HT switchgears consist of VCB, ACB breakers, LT Motors with LT cable, Transformers, UPS, WTP, Boiler, pump, motors ,Air compressor
DG Set with AMF panel & Plant Lighting
Daily Power monitoring, calculations and reporting at monthly basis Condition
Monitoring and Predictive maintenance of critical equipment and corrective actions to avoid breakdown.
Executive Maintenance Engineer
Alcatel Lucent Ltd
Bangalore
09.2011 - 03.2014
Nature of work : Maintenance
Job, Daily Power monitoring, calculations and reporting at monthly basis
Maintenance knowledge about HT switchgears consist of VCB, ACB breakers, LT Motors with LT cable, Transformers, ups
Troubleshoots plant electrical problems to determine their cause and recommends options for eliminating such problems
Includes carrying out tests on equipment
Maintenance knowledge about Generator, Transformer, Chiller and AHU, UPS and air compressor
Electrical Maintenance
Ascent Circuits Ltd
Hosur
07.2010 - 08.2011
Maintenance
Job responsibilities:
Had responsibility of identifying and repairing minor electrical faults
To prepare report and maintain daily records
Handled different types of lighting circuits and installed new lightings in different places
Maintenance knowledge about Transformers, Generator
Area of work experience:
Chillier plant & cooling plant Maintenance
Transformer
ACB,VCB Circuit breaker
Generator Maintenance
Electrical wiring
Preventive maintenance
Ups maintenance
Motors maintenance
Boiler and Air compressor
RO plant
Project work
Education
Bachelor of Engineering - Electrical And Electronics Engineer
Adhiyamaan College of Engineering
Hosur
06.2007 - 05.2010
Diploma - Electrical And Electronics Engineer
Lakshmi Narayana Polytechnic College
Dharmapuri
06.2004 - 03.2007
High School Diploma -
GHS School
Thoppur
06.2002 - 03.2004
Skills
HT and LT breakers maintenance Transformer & DG maintenance AHU,Chiller, AC, Cooling tower maintenance Air compressor, vacuum dryer,RVPD, and plant machine UPS and Lighting maintenance RO plant, ETP plant, MEE plant maintenance Pumps and motors and drive control maintenance Store maintenance 5S method Capex and Opex project complete the within budge Budget estimation and control the R&M cost with in the approved limit Workplace Safety, Vendor SLA, Preventive and corrective maintenance work and SAP maintenance
undefined
Accomplishments
Degree
Name of Institute
Board of Study Year of passing
Percentage of Marks
B.E (EEE) Adhiyamaan College of Engineering, Hosur Anna University73
DEEE
Laxminyarayana polytechnic college Dharmapuri
Technical board89
HSS
Govt Hr.Sec.School, Thoppur
State board73
Software skill sets:
Drafting software : AutoCAD
Office Automation : MS word and Excel
Personal details:
FATHER’S NAME : T.Amsan
DATE OF BIRTH : 05/06/1985
Affiliations
Supervised team of 30 staff members.
Achieved Repair and maintenance cost saving by implemented the plant running process with accuracy and efficiency.
Achieved production target through effectively helping with maintain the production equipments without break down
Achieved Equipment breakdown by introducing the monitoring technologies for process improvement tasks.
Timeline
Electrical Engineer
Cargill premix and nutrition India Ltd
10.2014 - 06.2019
Executive engineer
Micro lab API
04.2014 - 10.2014
Executive Maintenance Engineer
Alcatel Lucent Ltd
09.2011 - 03.2014
Electrical Maintenance
Ascent Circuits Ltd
07.2010 - 08.2011
Bachelor of Engineering - Electrical And Electronics Engineer