To be an integral part of a highly motivated-result oriented team, Where I can gain experience and expertise, that would build a strong Foundation for my career & deliver what the team expects of me, to the best of my abilities
Overview
15
15
years of professional experience
1
1
Certification
Work History
Project Engineer
TATA CONSULTING ENGINEERS (TCE)
01.2024 - Current
Documentation related to above works- Handling work orders, mails, purchase orders, invoices, pricing, material approvals, testing commissioning reports, preparation of drawings, hand over documents etc
Coordination with vendors, suppliers, manufacturers for material selection, approval, purchase
Fire fighting and fire alarm work design and implementation (NFPA-13)
Lighting system - functional lights, special lights, dimmer racks, stage lights, pole lights, floodlights, high mast light, floor lights and bollard lights
CCTV camera execution work, schematic drawing preparation work
Entire plumbing work execution work, plumbing line checking with calculation, design & schematic layout checking and comments (NBC 2016 standards)
Rain water harvesting design calculation, checking with drawings as per NBC 2016
Installation generators, MDB/SMDB panels, DBs and LV panels, street light panels, control panels, UPS panels and related works; Lightning protection and earthing system for building and towers
Lighting system - functional lights, special lights, dimmer racks, stage lights, pole lights, floodlights, high mast light, floor lights and bollard lights
Installation generators, MDB/SMDB panels, DBs and LV panels, street light panels, control panels, UPS panels and related works; Lightning protection and earthing system for building and towers
Documentation related to above works- Handling work orders, mails, purchase orders, invoices, pricing, material approvals, testing commissioning reports, preparation of drawings, hand over documents etc
Coordination with vendors, suppliers, manufacturers for material selection, approval, purchase
Fire fighting and fire alarm work design and implementation (NFPA-13)
STP-0.120 MLD tank execution, design and calculation
CCTV camera execution work, schematic drawing preparation work
Entire plumbing work execution work, plumbing line checking with calculation, design & schematic layout checking and comments (NBC 2016 standards)
Rain water harvesting design calculation, checking with drawings as per NBC 2016
OHE MAST foundation design, railway TSS, SSP, SP work execution done, Neutral section isolator fixing, semiconductor isolator fixing, catenary and contact wire laying, ATD system execution
Awareness of engine supply electrical system conversion and area of use
Awareness about Portal foundation of railway system
Arranging power block for line shifting
Awareness about train system Pantograph current collection techniques
Entire electrical system execution work, design and calculation checking (NBC)
DG set installation work execution, design checking
Fire alarm execution checking & check the entire system as per the NFPA Standards
Intercom system implementation, checking the schematic drawing and provided comments
Awareness about DFDM, Metal hand detector & execution done for IP-based information system, railway PA system, cabling and awareness about VLAN and networking IP fixing
Awareness about railway light requirements, Lux capacity, Raid technology and backing of camera system
ECBC standards for space lighting methods, CEA standards for electricity charging methods and also Kerala supply code 2014
ENTIRE SITE MEP WORK CO-ORDINATION (COCHIN CANCER PROJECTS - HOSPITAL PROJECTS)
Detailed engineering design of the project, procures all the equipment and materials necessary, and then constructs to deliver a functioning facility or asset to their clients
Installation of electrical switchgears, transformers and PLC, LV, HV panels
Coordinating with client, consultant and contractor
Design power distribution drawing as per the requirement
Coordination with vendors, suppliers, manufacturers for material selection, approval, purchase
Fire fighting and fire alarm work design and implementation (grooved and threaded type fittings)
STP-320 KLD tank execution, design and calculation
CCTV camera execution work, schematic drawing preparation work
Entire plumbing work execution work (ring fit type), plumbing line checking with calculation, design & schematic layout checking and comments (NBC 2016 standards)
PTS system execution work
MGPS execution work
Entire electrical system execution work, design and calculation checking (NBC)
DG set installation work execution, design checking
Fire alarm execution checking & check the entire system as per the NFPA Standards
Intercom system implementation, checking the schematic drawing and provided comments
MEFP WORK COORDINATION (KOCHI WATER METRO PROJECTS)
Work nature:- kochi water metro LOT 1 AND LOT 2 entire MEP work coordination
Coordination with vendors, suppliers, manufacturers for material selection, approval, purchase
Documentation related to above works- Handling work orders, mails, purchase orders, invoices, pricing, material approvals, testing commissioning reports, preparation of drawings, hand over documents etc
Installation generators, MDB/SMDB panels, DBs and LV panels, street light panels, control panels, UPS panels and related works; Lightning protection and earthing system for building and towers
Documentation and shop drawing preparation of entire site
Material approval procedure (MIR), installation and commissioning report of equipments, client meeting and decision taken as per the site condition
MEFP WORK COORDINATION (HIGH RISE BUILDING PROJECTS G+20)
All type of ELECTRICAL, FIRE, PLUMBING AND LIFT WORK is done for Oasis work
MEP ENGINEER INCHARGE OF 'OASIS - CCTV operation, STP, Swimming pool connectivity, energy meter calibration using krycard device, PLC programming for light circuit, panel maintenance
Project Name :- BETALACTUM PLANT (NON SYRUP PLANT) -K.S.D.P
All type of works mainly in LT & HT, fire, lift, plumbing items done and also maintenance :-
11 KV yard maintenance
Capacitor panel erection
Motor connectivity
Star delta connection to motors
Change over connectivity
D.O.L Starter connectivity to motors
Knock-out panel connection to motors Via push button
Capsule filling machine Maintenance
Tablet and mixer-cum granulation machine maintenance
Star-delta connection through chiller motor and compressor unit
Split and window air conditioning system installation and maintenance
Point of view in APFC panel design and details
T.O.D meter connection through CT/PT Unit
Inverter circuit wiring
AHU's Power cabling
Project bill preparing
Rough bill preparation
Backup creating with measuring details
Designing of circuit in industries, residential building
Follow up and ensure that the installation, inspection and testing of all the Electrical services and work implemented meets the specification and the client requirements
Verify the accuracy of drawings
Material coordination and close interaction with Consultants for preparation of material submittal for approvals, preparation of as built drawings
Designing of earthing for the substations
Measurement of Insulation resistance, SC and OC test On transformers