Proficient Electrical Design Manager with extensive 21 Year experience in leading renewable energy projects, including solar, wind, and Battery Energy Storage Systems (BESS) and Thermal power plant projects. Demonstrated success in enhancing project delivery and engineering quality while spearheading initiatives at Amplus Solar. Strong capabilities in managing large-scale projects and teams effectively. Career goals focus on driving innovative solutions in the renewable energy sector to further enhance sustainability efforts.
Projects Undertaken.
Renewable Projects -
Thermal Projects -
• [ Detail engineering design for the "Navoi-2 Thermal Power Station (1x450 MW) & Turakurgan Thermal Power Station (2x450 MW) combined cycle power project in Uzbekistan.]
[ Client: Calik Enerji, Turkey ].
Design Execution: Dec 2016 – Jan 2019.
About the Project: • 1-year deputation at the Turkey Calik Energy Office for engineering design coordination, support for procurement, and site activity. • Three-month deputation in Uzbekistan for engineering support for construction and commissioning activities at the site. • Complete control system design, which includes logic diagrams, control schematics of electrical equipment like HT/LT panels, transformers, protection panels, GCB, trip matrix, interlocking matrix for the plant and switchyard, and cable connection diagrams. Single line diagram, main control room layout, and transformer yard layout.
• Detail engineering design for the "2x660 MW Supercritical Thermal Power Plant at Safi, Morocco.
[Client: Daewoo E&C, South Korea]
Design Execution: Jan 2014 – Dec 2016.
Complete control system design, which includes logic diagrams, control schematics of electrical equipment like HT/LT panels, transformers, protection panels, trip matrix, interlocking matrix for plant, and switchyard layout design for the main control building and transformer yard. • Vendor Packages – Generator Step-Up Transformer (GSUT), Unit Aux Transformer (UAT), Protection Panels, Generator, Bus Duct. Schematics review for the entire electrical and mechanical vendor package, including the cable connection diagram.
• Detailed engineering design for the retrofitting of existing 13.8 kV switchgear and associated auxiliary systems for 3 x 12.5 MVA, 13.8 kV generators.
[Client: Bandariyah International Company, Saudi Arabia] Design Execution: Dec 2012 – Jan 2014.
Worked as the electrical lead; responsibilities included the completion of electrical design.
• Detailed engineering for three projects having sites in Najran, Wadi, and Sharourah in Saudi Arabia has 2 Nos Standard Frame '7EA' GE makes Gas Turbines and Generators (GTGs) along with their associated equipment and auxiliaries.
[Client: Al Toukhi Contracting Company, Saudi Arabia] Design Execution: Mar 2011 – Dec 2012
Worked as the electrical lead; responsibilities included the completion of electrical design.