Sr. Engineer Production
Laxmi Hydraulics Pvt Ltd.
Solapur
11.2010 - 10.2020
- Controlled project costs by approving expenditures.
- Adhered to timelines to meet quality assurance targets.
- Determined equipment failure root cause and implemented solutions.
- Assessed scope and requirements to assist with project design determinations.