VIKASH KUMAR

VIKASH KUMAR

CIVIL ENGINEER
Ahmedabad

Summary

To join a professional and growth-oriented organization, leveraging my knowledge and experience in civil engineering to contribute effectively to the organization's success and achieve maximum career advancement.

Professional Experience: Construction Manager with more than 9.5 years of experience in managing large-scale infrastructure projects, including elevated metro rail corridor, 8 lane elevated expressway corridor and elevated high speed rail corridor. Expertise in project planning, resource management, and ensuring compliance with quality standards and safety standards while leading teams to successfully deliver complex civil engineering projects.

Overview

2025
2025
years of professional experience
7
7
years of post-secondary education
2
2
Languages

Work History

Assistant Construction Manager

Larsen & Toubro Ltd.
7 2021 - Current
  • Design and construction of civil and building works, including viaducts, bridges, and stations
  • Project Value: ₹7289 Crores
  • Client: National High Speed Rail Corporation
  • Consultant: TCAP JV
  • Executed Structure Details: Foundation Type: Friction Pile having diameter 1.2m,1.5m&1.8m (River)
  • Substructures: Rectangular wall-type piers (4x2m,4x2.5m &4x3m) & Portal Beam
  • Superstructure: 40m full-span box girder (FSLM) & 2.5m standard segment (SBS)
  • Key Responsibilities: Planning monthly work schedule, resource management, coordination with clients, stakeholder coordination, Risk assessment, Implementation of safety and quality standards
  • In-charge for execution of 14 km piling works from CH 464 to 478 which includes viaduct piles 1.2m 1690 NOS, 1.5m 55 NOS & 1.8m 126 NOS (River pile), Initial test piles and initial/routine load tests
  • In-charge for execution of SMD & Ramp pile 750mm dia 340 NOS
  • In-charge for execution of viaduct Substructure works from CH464 to CH471 FSLM 01 Strech
  • Frequent review of work progress and identification of deviations
  • Compliance with safety and quality standards and timely reporting
  • People management and resolution of employee grievances.
  • Efficiently managed material procurement processes to prevent delays in the project''s progress.
  • Mitigated risks by developing comprehensive contingency plans for potential obstacles encountered during construction projects.
  • Coordinated with site personnel, clients and local government officials to achieve on-time project delivery.

Senior Engineer (Structure)

G.R. Infra Projects Ltd.
1 2018 - 6 2021
  • Design and construction of a 2x4 lane elevated structure cum rail overbridge
  • Project Value: ₹1087.07 Crores
  • Client: National Highway Authority of India
  • Structure Details: Span Length: 90m continuous span & 40m ROB composite steel
  • Foundation Type: Pile foundation with 467 piles (1.2m dia)
  • Key Responsibilities: Coordination with the client and submission of progress reports
  • Responsible for execution of piling, Foundation, substructure including portals
  • Responsible for post tensioned PSC girder casting & erection at site, assembling & erection of composite steel girders for ROB span
  • Responsible for casting of pedestals, fixing of POT-PTFE bearing completion of deck slabs, fixing of modular type expansion joints
  • And crash barrier
  • Preparation of Bar Bending Schedule (BBS) and monthly billing of subcontractors

09.2017 - 01.2018
  • 2x3 lane elevated structure over 80.82 km
  • Project Value: ₹1367 Crores
  • Client: National Highway Authority of India
  • Structure Details: Total Span: 3km 4 lane elevated structure having 100 spans (30m each)
  • Foundation Type: Pile foundation
  • Key Responsibilities: Client coordination and daily progress reporting
  • Responsible for pretensioned PSC girders in CY which includes cage placement, cable profiling stressing-destressing and stacking of casted girders
  • Responsible for ensuring 10 days cycle time for 4 beds consisting 3 girders of length 30m in each bed
  • Material requisition and reconciliation and day-to-day planning

Site Engineer

CEC International Corporation India Pvt Ltd
5 2015 - 9 2017
  • Delhi Metro Railway Contract-NC02
  • Project Value: ₹507.63 Crores
  • Client: Delhi Metro Rail Corporation Ltd
  • Structure Details: Total Viaduct Length: 10,193m
  • Foundation Type: Pile foundation with circular piers (min
  • Dia 1800mm)
  • Superstructure: U-Girder for standard spans
  • Key Responsibilities: Coordination with the client and preparation of daily progress reports
  • Responsible for execution of piling works
  • Launching of precast pier caps and U girders by using telescopic cranes by maintain safety standards
  • Managed on-site resources effectively, including personnel allocation, equipment utilization, and material storage to ensure smooth project progression with minimal downtime.

Education

B. tech - Civil

Sikkim Manipal Institute of Technology
01.2011 - 01.2015

Intermediate - undefined

Rose Public School

Highschool -

Rose Public School
04.2001 - 01.2004

Skills

Construction safety

Construction management

Site Inspection

Multitasking

Team Leadership

Problem-solving abilities

Critical Thinking

Safety Management

Strategic Planning

Risk Management

Labor Relations

Monitor construction quality

Personal Information

Total Experience: 9.5 Years

Timeline

09.2017 - 01.2018

B. tech - Civil

Sikkim Manipal Institute of Technology
01.2011 - 01.2015

Highschool -

Rose Public School
04.2001 - 01.2004

Intermediate - undefined

Rose Public School

Assistant Construction Manager

Larsen & Toubro Ltd.
7 2021 - Current

Senior Engineer (Structure)

G.R. Infra Projects Ltd.
1 2018 - 6 2021

Site Engineer

CEC International Corporation India Pvt Ltd
5 2015 - 9 2017