Adept MEP Manager with a proven track record at B.G Shirke Construction Technology Pvt Ltd, showcasing expertise in MEP design and project management. Excelled in leading teams to deliver high-profile projects, emphasizing cost control and regulatory compliance. Demonstrates exceptional teamwork and collaboration, ensuring projects meet stringent quality standards.
Overview
14
14
years of professional experience
Work History
MEP Manager
B.G Shirke Construction Technology Pvt Ltd
Mumbai
10.2023 - Current
Construction of Office Complex and 769 Residential quarters at Customs Enclave Plot, Wadala, Mumbai
One tower Office complex (B+4P+16)
(2P+33) – 1 tower
(2P+27)- 2 towers
(2P+29)- 2 towers
(2P+27) – 1 tower
Sr. Manager (MEP Project)
Apurva Natwar Parikh Constructions Pvt. Ltd.
Mumbai
08.2014 - 09.2023
The project was completed with this organization.
The Green Acres Academy, Chembur
B+G+7 floor, plus terrace.
Project duration (2014–2017)
Total build-up area (126,000 sq. ft.)
Project type: from structure to finish (interior, exterior, MEP, with all finishing until handover).
Green Acres Academy, Mulund O2 Commercial Complex.
Ground to the 3rd floor.
Project Duration (Mar 2018 to June 2018)
Total build-up area (29,000 sq. ft.)
Ft.)
Project type: Interior and MEP work.
Green Acres Academy, Kakson House.
1st to 4th floor.
Project Duration (June 2017 to January 2018)
Total build-up area (24,000 sq. ft.)
Project Type: Interior and MEP work.
The Fern Residency Hotel, Chembur.
7th to 9th floor.
Project duration (2014–2017)
Total build-up area (126,000 sq. ft.)
Project Type: from structure to finish (interior, exterior, MEP, with all finishing until handover).
The Wasan house (Chembur)
1st To 7th floor
Project Duration (June 2020 to Jan 2021)
Total Build up area (24,000 Sq
Ft.)
Project Type- Interior and MEP work
The Green Acres academy (Wagholi, Pune)
With Joint venture with Asoka Build-con)
Ground To 7th floor
Project Duration (June 2019 to Jan 2020)
Total Build up area (210,000 Sq
Ft.)
Project Type- Interior and MEP work
The Acres lifestyle Club (fully renovation)
Ground and 1st floor
Project Duration (June 2020 to Feb 2021)
Total Build up area (80,000 Sq
Ft.)
Project Type- Interior, External Ground, and Guest House
With all amenities
The Green acres academy (Mulund west)
Basement To 4th floor Ph-1 (2020-june to may 2022) (Completed)
5th To 7th + terrace Ph-ii (Under pre construction stage)
Project Duration (June 2020 to Jan 2024)
Total Build up area (24,000 Sq
Ft.)
Project Type- Pre-cast structure & Interior and MEP work
The green Acres academy (Ghat-kopar) (Under Pre-construction stage)
B+G+7 floor+terrace
Project duration (Mar 2023-2025)
Total Build-up area (185,000 Sq
Ft)
Project Type-from structure to finish (interior, Exterior, MEP with all finishing till hand over)
MEP Engineer
J. Kumar Infra Projects Limited
Navi Mumbai
07.2012 - 09.2014
As an MEP Engineer for Metro Depot (Taloja, Navi Mumbai)
Electrical Engineer
Metro Electrical Services
Pune
05.2011 - 07.2012
For Blue Ridge Residential high rise Building Hinjewadi, Pune
Education
B. Tech - Electrical Engineering
Rajasthan Technical university
Kota, Rajasthan
01.2011
Senior Secondary - PCM
B.I.E.C Patna
Patna, Bihar
01.2007
Electrical Draughtsmanship -
Shanti technical institute
Siwan, Bihar
01.2005
Secondary -
B.S.E.B Patna
Patna, Bihar
01.2003
Skills
MEP design
Project management
Building codes
HVAC systems
Electrical systems
Plumbing systems
Cost estimation
Construction scheduling
Contract negotiation
Regulatory compliance
Team leadership
Quality assurance
Time management
Cost control
Building codes compliance
Energy efficiency
Lighting design
Value engineering
Green building practices
CAD and BIM software
Construction coordination
Subcontractor management
Project budgeting
Cost estimating
Building, demolition, and renovation
Safe job site set-up
Plumbing knowledge
Teamwork and collaboration
Site management
Microsoft office
Roles And Responsibilities
Coordination with the following team: Liasoning Architect, plumber, Master Architect, MEP consultant, Environmental Consultant, Quality Auditor, Electrical Contractor, ELV contractor (Data, Wi-Fi, Telephone, CCTV, FAS, PAS), Firefighting contractor, Plumbing Contractor, HVAC contractor, Interior contractor (Carpentry, Flooring/tiling, Painting and polishing, Gypsum related work)
Coordination with C&P team
Coordination between contractor and consultants
Preparation of master Budget for Interior and MEP project
Preparation of Work schedule with coordination of all Team
Design Review (as design received from Architect and MEP consultants and architect on behalf of developer)
Finishing of Tender stage (Re-viewing of BOQ Specification as per Tender drawing received from Architect, made modification if any required and forward to C&P Team for tendering)
Clearing of all Pre-bid (technical round) Quarries with all contractor
Attending all work shop for making MEP drawing as per our requirement. With MEP consultant.
Kickoff meeting with all contractor pre-site start work
Approval of shop drawing made by contractor before starting work at site.
Making of DPR, WPR and MPR and presenting to management by daily, weekly, monthly and clearing site related issue with management
Measurement verification and Approval for payment process.
Checking daily site check list and Quality Reports.
Approval of MAR form Contractor
Preparation of Project handbook.
Area Of Work
Electrical work: Internal Wiring design and execution, SB, DB and Cabling Schedule as per load, Load calculation, Main LT panel and distribution panel designing and Execution, HT side work like transformer selection, DG selection, as per project load calculation, Liasoning work with electricity service provider.
Plumbing work: Internal and external Plumbing system, Water Consumption calculation, Water tank requirements as per building consumption, External drainages system, Rainwater harvesting system, Vertical stack line, Gravity and hydro-pneumatic system of Domestic and flushing line, Fire sprinkler and Hydrant system, Fire smoke detection and Alarm system, Public Addressable System, CCTV system, Data and Wi-Fi and networking system.
HVAC: Ventilation system, Split high-wall unit, VRF system.
Interior: Carpentry work, POP & Painting work, Gypsum partitions and ceilings, Tiles/marble/granite flooring, Different types of flooring (EPDM, Stamp concerting, Acrylic, Bitumen etc.), RCC Expose rendering technology, Pre-Cast structure building.
Introspections
Dynamic personality & communication skill
Ability to lead a team & work under a team co-operatively.
Manage technical & human issues very easily.
Potential to handle any situation, technical or managerial.
Well, grasping of skills related to MEP & Interior works.
Motivating nature & positive attitude towards life.
Languages
English
Hindi
Marathi
Bhojpuri
Disclaimer
I hereby declare that the above given information is true to the best of my knowledge.
Other Qualifications
MS Office (Excel, MS Word, Power Point)
Auto CAD (2-D, 3D)
Revit
ENSCAPE
BIM 360 review
Sketch pro 2D and 3D
Twin motion rendering
Handling of Google drive
Personal Information
Age: 37
Date of Birth: 03/05/86
Gender: Male
Nationality: Indian
Marital Status: Unmarried
Software
Autocad
Revit
BIM
Ms office
Enscape
Timeline
MEP Manager
B.G Shirke Construction Technology Pvt Ltd
10.2023 - Current
Sr. Manager (MEP Project)
Apurva Natwar Parikh Constructions Pvt. Ltd.
08.2014 - 09.2023
MEP Engineer
J. Kumar Infra Projects Limited
07.2012 - 09.2014
Electrical Engineer
Metro Electrical Services
05.2011 - 07.2012
B. Tech - Electrical Engineering
Rajasthan Technical university
Senior Secondary - PCM
B.I.E.C Patna
Electrical Draughtsmanship -
Shanti technical institute
Secondary -
B.S.E.B Patna
Similar Profiles
Krishnadev MisalKrishnadev Misal
Sr. Project Engineer at HYT Engineering Company Pvt. Ltd.Sr. Project Engineer at HYT Engineering Company Pvt. Ltd.