Summary
Overview
Work History
Education
Skills
Interests
Declaration
Timeline
Generic
VIKRAM GADADE

VIKRAM GADADE

Senior Site Engineer
Pimpri-Chinchwad,MH

Summary

Dynamic and ambitious professional seeking to build a career in a leading high-tech corporate environment, collaborating with dedicated and driven teams. Committed to exploring and realizing potential while contributing as a key player in challenging and innovative settings. Passionate about leveraging skills to drive success and foster growth in a forward-thinking organization.

Overview

11
11
years of professional experience

Work History

Sr.Site Engineer

Platinum Group.
12.2024 - Current
  • Handling Site with Sales Office Building with all Activity.
  • Checking of R.C.C Work Shuttering and Steel as per Consultant Drawing. Column and Lift Shuttering in Aluform Material and Slab in Ply Shuttering Material 15 Days Slab Cycle.
  • Preparing Work Schedule for Every Task and Overall Building Activity.
  • Generate Daily and Weekly Work Report.
  • Maintain the Record of Cube Casting and Different Activity Checklist etc.
  • Preparation of Contractor Bill as per Work order Payment Schedule.
  • Execute the Work as per GFC Drawing at Actual.
  • Monitoring High Rise Building Execution and Finishing Work Activities.
  • Monitor the Daily Work Progress along with Weekly or Monthly Planning Schedule.
  • Checking of R.C.C Work Shuttering and Steel as per Rcc Consultant Drawing.
  • Placing Material Service Indent, Auto Indent and Work done by using ERP Far vision System.
  • Coordinate with Architect, Consultant and Contractor to ensure the Project smoothly and speedily.
  • Reporting To – Project Manager/Chief Engineer.

Sr. Site Engineer

Tayal Corp.
01.2023 - 12.2024
  • Handling Building with all Activity Stepwise.
  • Monitoring High Rise Building Execution and Finishing Work Activities.
  • Checking of R.C.C Work Shuttering and Steel as per Consultant Drawing. Column and Lift Shuttering in Aluform Material and Slab in Ply Shuttering Material 15 Days Slab Cycle.
  • Generate Daily and Weekly Work Report.
  • Maintain the Record of Cube Casting and Different Activity Checklist etc.
  • Preparation of Contractor Bill as per Work order Payment Schedule.
  • Execute the Work as per GFC Drawing at Actual.
  • Monitor the Daily Work Progress along with Weekly or Monthly Planning Schedule.
  • Maintain the Flow of Work Continuously.
  • Placing Material Requisition and Material Issue by using ERP High-Rise System.
  • Coordinate with Architect, Consultant and Contractor to ensure the Project smoothly and speedily.
  • Project – K-Town - Residential Building Project (9 Towers – B+P+18 Floor) at Kivale.
  • Team Size – 5 Nos.
  • Total Unit – 108 Flat. (Total Project Flat -1293 Flat)
  • Built Up Area – 1, 75,000 Sqft.
  • Reporting To – Project Manager.

Sr. Site Engineer

Omkar Developers
01.2019 - 12.2022
  • Individually Handling Building with all Activity Stepwise.
  • Monitoring the Building Execution and Finishing Work Activities.
  • Checking of R.C.C Work Shuttering and Steel as per Consultant Drawing.
  • Generate Daily Progress Work Report.
  • Maintain the Record of Cube Casting and Different Activity Checklist etc.
  • Preparation of Contractor Bill as per Work order Payment Schedule.
  • Estimating the Steel Qty., Concrete Qty. & other Material Qty required for Building.
  • Execute the Work as per GFC Drawing at Actual.
  • Maintain the Flow of Work Continuously.
  • Coordinate with Architect, Consultant and Contractor to ensure the Project smoothly and speedily.
  • Project – Residential Building Project (2 Towers – 2P+11 Story) at Chikhali, Pimpri-Chinchwad.
  • Team Size – 3 Nos.
  • Total Unit – 86 Flat.
  • Built Up Area – 76,000 Sqft.
  • Reporting To – Project Manager & Builder.

Jr. Engineer

Sidus Buildcon India Private Limited, Kharghar
06.2015 - 07.2018
  • Monitoring the Building Execution and Finishing Work Activities.
  • Checking of R.C.C Work Shuttering and Steel as per Consultant Drawing.
  • Checking of Interior Work like Flooring, Painting, Carpentry, Gypsum and False Ceiling as per Architecture Drawing.
  • Generate Daily Progress Work Report.
  • Maintain the Record of Cube Casting and Different Activity Checklist etc.
  • Checking of Contractor Bill Measurement at Actual Site.
  • Estimating the Steel Qty., Concrete Qty. & other Material Qty required for Building.
  • Execute the Work as per GFC Drawing at Actual.
  • Maintain the Flow of Work Continuously.
  • Project – Institutional Project at Pune. (Contracting Work)
  • 1. Ryan International School, Bhavdhan.
  • 2. Vibgyor Group of School, Hinjewadi Phase-2 & Chinchwad.
  • Team Size – 3 Nos.
  • Reporting To – Sr. Engineer.

Education

B.E. - Civil Engineering

Vidya Pratishthan’s College of Engineering
Baramati
08-2015

Civil Engineering

Vidya Pratishthan’s Polytechnic College
Indapur
04.2001 -

New English School,Tandali.
Tandali
04.2001 -

Skills

Proficient in AutoCAD

Interests

Hobby – Watching News, Playing Cricket and Driving Car

Declaration

The above information submitted is true with best of my knowledge and belief.

Timeline

Sr.Site Engineer

Platinum Group.
12.2024 - Current

Sr. Site Engineer

Tayal Corp.
01.2023 - 12.2024

Sr. Site Engineer

Omkar Developers
01.2019 - 12.2022

Jr. Engineer

Sidus Buildcon India Private Limited, Kharghar
06.2015 - 07.2018

Civil Engineering

Vidya Pratishthan’s Polytechnic College
04.2001 -

New English School,Tandali.
04.2001 -

B.E. - Civil Engineering

Vidya Pratishthan’s College of Engineering
VIKRAM GADADESenior Site Engineer