To ensure challenging position in a growing organization where I would be able to utilize my capabilities to the best extended in the process and add value to the organization and my career. Responsible Site Engineer coordinates and manages multiple third-party and internal providers. Trusted organizer of rapid and diligent workforces. Applies deep technical knowledge and humanistic management skills to reaching project completion under budget and within prescribed timeframes.
Auto-Cadd, 3D Max,prima vira,stadd-pro, Steel structure,Geotechnical engineering, R.C.C, Building material and construction, Construction management,Structural analysis
CIVIL SIMPLIFIED, winter internship, Design of Bridges using BRIDGE DESIGN SOFTWARE BY JOHN HOPKINS Use of SAP 2000 to design tall buildings which involves conceptual design, approximate analysis, preliminary design and optimization to safely carry different loads acting on structure, 12/2013, 01/2014
Member of organizing team of NCC.
READY MIXED CONCRETE- Minor Project 1, 08/2014, 11/2014, Complete study on the batching plant and transit mixer of the A.C.C cement plant Software COMMAND ALKON incorporated at the batching plant Different admixtures used in preparing RMC according to type of characteristics to be provided STABILISATION OF SOIL- Minor Project 2, 01/2014, 05/2014, To stabilize the soil using best cement percentage which would give the soil the desired strength and is economical at the same time Both the parameters are considered which are- tensile and compressive force on the given soil mass