Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Additional Information
Timeline
ProjectManager
Vikrant Natkar

Vikrant Natkar

Project Manager
Mundra

Summary



PROFILE SUMMARY

  • A result oriented professional with around 12 years of experience in the arena of:Maintenance, Project Execution, Troubleshooting,Breakdown Analysis, Vendor Management, Erection & Commissioning
  • Demonstrated acumen in implementing maintenance schedules and carrying out periodic checks to ensure performance of various equipments & maintaining requisite documents for the same
  • Competent in planning, organizing and controlling all requisite activities such as sourcing, techno-commercial evaluation, negotiation, recommendation, contracting, inspection, expediting & tracking, reporting, etc.
  • Pivotal in reporting & facilitation of root cause analysis to prevent recurrence and maintain zero accident/incident goals
  • Insightful experience in planning & implementing the preventive, predictive & breakdown maintenance schedules for improving overall reliability and safety of plant equipment & machinery; managing maintenance operations for reducing breakdown / downtime and enhancing operational effectiveness of equipment
  • Pivotal in anchoring & planning erection & commissioning for various equipment and machinery
  • Skilled in implementing projects with respect to cost, resource deployment, time over-runs and quality compliance to ensure satisfactory execution of projects
  • Know how of standard project management tools & techniques to schedule, plan, track and correct project performance; ensuring effective use of technical & management methodologies

Overview

12
12
years of professional experience
7
7
years of post-secondary education
4
4
Certifications
4
4
Languages

Work History

Associate Project Manager

Kutch Copper Limited, A Unit Of Adani Enterprise
Mundra
08.2022 - Current


  • · Handling a package of “38 TPH Continuous Copper Rod” rolling mill line project and cast wheel package from engineering review to commissioning.
  • · Accountable for reviewing the engineering and providing inputs to get the required drawings/documents.
  • · Responsible for end-to-end planning and scheduling of project deliverables.
  • · Synchronization with technology partner and engineering team to get master documents within schedule.
  • · Tracking and maintaining records of documents as per MDL.
  • · Preparation of tender documents for supply and services.
  • · Reviewing technical offers, preparing observation sheets and discussion with vendors to finalize the technical offer.
  • · Assessing the offers and scoring for multiple vendors.
  • · Prioritization of civil foundation requirements based on delivery dates of material from multiple vendors.
  • · Follow up with civil team to get the civil foundations ready before receipt of equipment at site.
  • · Scrutiny of civil foundations to match the base of structures as well as equipment’s.
  • · Erection of structures and equipment at foundations.

Associate Manager

Vedanta Limited
Silvassa
07.2011 - 08.2022

Jul’11 - Jan’13 Maintenance Engineer (Tuticorin)

Feb’13 – Mar’17 Maintenance Engineer (Silvassa)

Apr’17- Aug’22 Associate Manager (Silvassa)

Highlights:

As Associate Manager (Silvassa)

  • Functioned as Head Mechanical and Utilities in Refinery plant.
  • Leading a team of 12 people including engineers, technician and SIC’s.
  • Conducting a meeting within a team for reviewing daily breakdown and routine maintenance activities.
  • Daily monitoring and review of utilities consumption through production report.
  • Releasing purchase and work requisition for raw material and services.
  • Follow up with team for maintaining material stock, insurance spares and inventory.
  • Driving a team of contracts with around 50 employees for execution of mech. and civil maintenance related jobs.
  • Planning and scheduling of new projects and Execution of jobs within timeframe.
  • Implementation of energy/cost saving initiatives to increase production capacity with respect to future targets.
  • Responsible for maintaining zero incidents and accidents with LTIFR zero.
  • Ensuring all works to be carried out with respect to EHS priority.
  • Development of vendors for material and services supply.
  • Approvals of material, service codes and requisitions for material required for the plant.
  • Implementation of preventive maintenance schedule of all equipments.
  • Assisting in forecasting requirements, creating a budget and scheduling expenses for the department.
  • Responsible for service bill entries and it's compliance within timeframe.
  • Regular reviewing of monthly provisions and projections to maintain COP.
  • Meeting statutory compliance of plant equipment’s and infrastructure.
  • Leading a team of “Crane and lifts operational safety” in plant.
  • Single Point accountability for maintaining loft room of lifting tools and tackles.


As Maintenance Engineer (Tuticorin)

  • Functioned as In-charge of Sulphuric Acid Plant
  • Responsible for maintaining all the equipments used in the plant and reduction of equipment failure for 100% plant availability
  • Headed a cross functional team of 10 members to implement a continuous improvement initiative
  • Acted as In-charge of mechanical sub stores located in Sulphuric Acid Plant
  • Maintained and kept records of inventory used in the plant
  • Acted as the Secretary of CIP (Continuous Improvement Project) titled “Enhancing plant availability of Sulphuric Acid Plant upto 99%" that reached from 85% to 94% in one year
  • Served as active member for Industrial Safety’s Single Point Accountability (SPA) team “Fall Prevention”
  • Involved in troubleshooting of problems related to Man, Method, Material and Machine on daily basis

Education

B.E - Mechanical Engineering

YCCE
Nagpur
08.2006 - 05.2010

HSSC -

Hadas Junior College
Nagpur
06.2004 - 07.2006

SSC -

Somalwar High School
Nagpur
06.2003 - 06.2004

Skills

    Project execution

undefined

Accomplishments

    Projects Executed:

  • Erection and commissioning of 8MT boiler with economizer along with SCADA technology.
  • Replacement of chimney - height 36 mtr in minimum time .
  • Erection & commissioning of 60 MT LPG bullet.
  • Erection and commissioning of ‘Soot extraction system in Boiler’.
  • Roof sheet replacement of plant.
  • Erection and commissioning of fan less cooling tower.
  • Upgradation and commissioning of RO and STP plant.
  • CAPEX projects related to civil such as brick lining, acid resistant tile lining, and structural sheds foundations and erection.

Certification

Undergone competency training for ‘Cranes and Lifts’.

Additional Information

Personal Details:

Date of Birth: 4th June, 1989

Address: 110 Jai Badrinath Co. Society, Parate Layout, Nagpur – 440025, Maharashtra

Timeline

Associate Project Manager

Kutch Copper Limited, A Unit Of Adani Enterprise
08.2022 - Current

Associate Manager

Vedanta Limited
07.2011 - 08.2022

B.E - Mechanical Engineering

YCCE
08.2006 - 05.2010

HSSC -

Hadas Junior College
06.2004 - 07.2006

SSC -

Somalwar High School
06.2003 - 06.2004

Undergone competency training for ‘Cranes and Lifts’.

Undergone training and become a Certified “Scaffolding inspector” of Vedanta Limited.

Undergone training of “Basic Fire Safety Training” organized by Indus Fire Safety Academy.

Undergone training of Problem Solving Techniques and 7 QC Tools’’.

Vikrant NatkarProject Manager