11+ years Experienced in Power Project Execution, Management and Operation & Maintenance of Overhead Electrical Lines and Distribution Transformers. Responsible for Erection of 33KV,11KV, LT Lines, Energy Meters, and Distribution Transformers.
Overview
14
14
years of professional experience
Work History
Quality Engineer
ASHOKA BUILDCON LTD
J&K
12.2022 - Current
Efficiently oversee E&M installations, ensuring compliance with technical specs, materials, and drawings.
Manage contractors, monitor progress, and maintain project schedules.
Verify equipment specifications and design systems for tunnel ventilation, firefighting, LT/HT, and lighting.
Analyze electrical utility shifting estimates and optimize cable laying for LT and HT.
Execute Earth Mat and Substation erection, emphasizing exothermic welding.
Lead tunnel and external earthing work with a focus on precision and safety
Engineer
VINDHYA TELELINKS LIMITED, MP Birla GROUP
11.2019 - 08.2021
Managed IPDS Project under NBPDCL in Muzaffarpur, Bihar
Oversaw contractors, ensured material optimization, and provided daily progress reports
Prepared BOQ and JMC, generated MIS reports, and created SLDs
Installed 100KVA, 200KVA, and 315KVA transformers
Led erection and commissioning of 33KV and 11KV lines
Executed LT line conversions with AB Cables
Conducted quality inspections and resolved technical and public issues
Facilitated surveys and liaison with government authorities.
Site Engineer
L&T, PROJECT UNDER UP GOVT
08.2018 - 10.2019
Erection of Domestic BPL Energy Meters
LT line extension using AB cables
Erection of 11KV lines
Installation of Distribution Transformers
Conducted Quality Inspections
Facilitated liaison with Government Authorities.
Site Engineer
BAJAJ ELECTRICALS LTD
Sitapur
05.2018 - 08.2018
Erection of Domestic BPL Energy Meters
LT lines extension by AB cables
Erection of 11KV line
Erection of Distribution Transformers
Quality Inspection
Liaisoning with Govt
Authorities.
Site Engineer
AARVANSS BUILDWELL & INFRACON LLP
Saharanpur
09.2017 - 04.2018
Provided guidance to contractors to ensure work compliance
Managed effective material utilization
Presented daily progress reports to the project manager
Created Single Line Diagrams (SLDs) for pole-to-pole line measurement
Successfully installed 25KVA transformers
Led the erection and commissioning of 11KV lines
Executed LT line conversions using AB Cables, Conducted quality inspections
Provided weekly planning to contractors and resolved technical and public issues
Conducted surveys of 11KV and LT lines, marking for pole and transformer execution
Liaisoning with Government Authorities for project coordination.
Senior Executive
ESSEL VIDYUT VITRAN (UJJAIN) PVT LTD
04.2014 - 07.2017
Successfully oversaw the operation and maintenance of overhead electrical lines and distribution transformers
Responded to and resolved HT and LT breakdowns promptly and conducted patrolling of HT feeders to prevent feeder breakdowns
Managed teams to ensure the completion of projects within statutory timeframes and improved the existing network to reduce breakdowns
Coordinated with vendors for drawing and design approvals of LT and HT overhead lines, and prepared drawings for all HT and LT distribution network work
Made significant contributions to reducing Transmission and Distribution (T&D) losses
Played a pivotal role in electrification planning for previously unelectrified areas.
Senior Engineer
Medhaj Techno Concept Pvt. Ltd.
10.2011 - 12.2013
Successfully finalized DPRs for feeder separation projects as part of the Government of India program
Conducted detailed studies of existing networks and load flow analysis for towns and regions
Performed network planning, including the calculation of load on 11KV lines and Distribution Transformers
Collaborated with electrical contractors throughout electrification, execution, erection, commissioning, and interfaced with government authorities
Monitored and supervised the erection of 11KV and LT lines and the installation of distribution transformers.
Site Engineer
Aster Pvt. Ltd.
Guna
07.2010 - 09.2011
Conducted surveys of existing 11KV and LT lines for accurate project planning
Managed consumer indexing to facilitate network improvements
Successfully erected 11KV feeders and LT networks
Installed distribution transformers and domestic meters
Provided daily reports to headquarters to ensure efficient project management
Conducted quality inspections to meet project standards
Collaborated with clients to ensure project requirements were met
Facilitated liaison with government authorities for necessary approvals and compliance.
Quality Engineer
Ircon International Limited
(EQA) to meticulously oversee the installation and commissioning of substations and associated equipment, while diligently managing contractors and ensuring strict compliance with technical specifications and approved materials on-site
Efficiently oversee E&M installations, ensuring compliance with technical specs, materials, and drawings
Manage contractors, monitor progress, and maintain project schedules
Verify equipment specifications and design systems for tunnel ventilation, firefighting, LT/HT, and lighting
Analyze electrical utility shifting estimates and optimize cable laying for LT and HT
Assistant Professor at Shri Rawatpura Sarkar Institute of Technology and ScienceAssistant Professor at Shri Rawatpura Sarkar Institute of Technology and Science