11+ years Experienced in Power Project Execution, Management and Operation & Maintenance of Overhead Electrical Lines and Distribution Transformers. Responsible for Erection of 33KV,11KV, LT Lines, Energy Meters, and Distribution Transformers.

Overview

14
14
years of professional experience

Work History

Quality Engineer

ASHOKA BUILDCON LTD
J&K
12.2022 - Current
  • Efficiently oversee E&M installations, ensuring compliance with technical specs, materials, and drawings.
  • Manage contractors, monitor progress, and maintain project schedules.
  • Verify equipment specifications and design systems for tunnel ventilation, firefighting, LT/HT, and lighting.
  • Analyze electrical utility shifting estimates and optimize cable laying for LT and HT.
  • Expertly handle cable termination, cable tray installation, and tunnel lighting commissioning.
  • Execute Earth Mat and Substation erection, emphasizing exothermic welding.
  • Lead tunnel and external earthing work with a focus on precision and safety

Engineer

VINDHYA TELELINKS LIMITED, MP Birla GROUP
11.2019 - 08.2021
  • Managed IPDS Project under NBPDCL in Muzaffarpur, Bihar
  • Oversaw contractors, ensured material optimization, and provided daily progress reports
  • Prepared BOQ and JMC, generated MIS reports, and created SLDs
  • Installed 100KVA, 200KVA, and 315KVA transformers
  • Led erection and commissioning of 33KV and 11KV lines
  • Executed LT line conversions with AB Cables
  • Conducted quality inspections and resolved technical and public issues
  • Facilitated surveys and liaison with government authorities.

Site Engineer

L&T, PROJECT UNDER UP GOVT
08.2018 - 10.2019
  • Erection of Domestic BPL Energy Meters
  • LT line extension using AB cables
  • Erection of 11KV lines
  • Installation of Distribution Transformers
  • Conducted Quality Inspections
  • Facilitated liaison with Government Authorities.

Site Engineer

BAJAJ ELECTRICALS LTD
Sitapur
05.2018 - 08.2018
  • Erection of Domestic BPL Energy Meters
  • LT lines extension by AB cables
  • Erection of 11KV line
  • Erection of Distribution Transformers
  • Quality Inspection
  • Liaisoning with Govt
  • Authorities.

Site Engineer

AARVANSS BUILDWELL & INFRACON LLP
Saharanpur
09.2017 - 04.2018
  • Provided guidance to contractors to ensure work compliance
  • Managed effective material utilization
  • Presented daily progress reports to the project manager
  • Created Single Line Diagrams (SLDs) for pole-to-pole line measurement
  • Successfully installed 25KVA transformers
  • Led the erection and commissioning of 11KV lines
  • Executed LT line conversions using AB Cables, Conducted quality inspections
  • Provided weekly planning to contractors and resolved technical and public issues
  • Conducted surveys of 11KV and LT lines, marking for pole and transformer execution
  • Liaisoning with Government Authorities for project coordination.

Senior Executive

ESSEL VIDYUT VITRAN (UJJAIN) PVT LTD
04.2014 - 07.2017
  • Successfully oversaw the operation and maintenance of overhead electrical lines and distribution transformers
  • Responded to and resolved HT and LT breakdowns promptly and conducted patrolling of HT feeders to prevent feeder breakdowns
  • Managed teams to ensure the completion of projects within statutory timeframes and improved the existing network to reduce breakdowns
  • Coordinated with vendors for drawing and design approvals of LT and HT overhead lines, and prepared drawings for all HT and LT distribution network work
  • Made significant contributions to reducing Transmission and Distribution (T&D) losses
  • Played a pivotal role in electrification planning for previously unelectrified areas.

Senior Engineer

Medhaj Techno Concept Pvt. Ltd.
10.2011 - 12.2013
  • Successfully finalized DPRs for feeder separation projects as part of the Government of India program
  • Conducted detailed studies of existing networks and load flow analysis for towns and regions
  • Performed network planning, including the calculation of load on 11KV lines and Distribution Transformers
  • Collaborated with electrical contractors throughout electrification, execution, erection, commissioning, and interfaced with government authorities
  • Monitored and supervised the erection of 11KV and LT lines and the installation of distribution transformers.

Site Engineer

Aster Pvt. Ltd.
Guna
07.2010 - 09.2011
  • Conducted surveys of existing 11KV and LT lines for accurate project planning
  • Managed consumer indexing to facilitate network improvements
  • Successfully erected 11KV feeders and LT networks
  • Installed distribution transformers and domestic meters
  • Provided daily reports to headquarters to ensure efficient project management
  • Conducted quality inspections to meet project standards
  • Collaborated with clients to ensure project requirements were met
  • Facilitated liaison with government authorities for necessary approvals and compliance.

Quality Engineer

Ircon International Limited
  • (EQA) to meticulously oversee the installation and commissioning of substations and associated equipment, while diligently managing contractors and ensuring strict compliance with technical specifications and approved materials on-site
  • Efficiently oversee E&M installations, ensuring compliance with technical specs, materials, and drawings
  • Manage contractors, monitor progress, and maintain project schedules
  • Verify equipment specifications and design systems for tunnel ventilation, firefighting, LT/HT, and lighting
  • Analyze electrical utility shifting estimates and optimize cable laying for LT and HT
  • Expertly handle cable termination, cable tray installation, and tunnel lighting commissioning
  • Execute Earth Mat and Substation erection, emphasizing exothermic welding
  • Lead tunnel and external earthing work with a focus on precision and safety.

Education

B. Tech - Electrical Engineering

Gautam Buddha Technical University
05.2010

Some College (No Degree) -

Vocational Training
Paricha Thermal Power Plant

Skills

  • Electrical Engineering: Feeder Separation, Load Analysis, Quality Control, Transformer Installation, Government Liaison
  • Project Management: Planning, Execution, Reporting, Quality Assurance
  • Feeder Separation: DPR Finalization, Erection, Coordination, Reporting
  • Technical Proficiency: SLD, Contractor Coordination, Government Liaison
  • Microsoft Office Suite: Word, PowerPoint, Excel, Good Computer knowledge

Languages

Hindi, English
First Language

Timeline

Quality Engineer

ASHOKA BUILDCON LTD
12.2022 - Current

Engineer

VINDHYA TELELINKS LIMITED, MP Birla GROUP
11.2019 - 08.2021

Site Engineer

L&T, PROJECT UNDER UP GOVT
08.2018 - 10.2019

Site Engineer

BAJAJ ELECTRICALS LTD
05.2018 - 08.2018

Site Engineer

AARVANSS BUILDWELL & INFRACON LLP
09.2017 - 04.2018

Senior Executive

ESSEL VIDYUT VITRAN (UJJAIN) PVT LTD
04.2014 - 07.2017

Senior Engineer

Medhaj Techno Concept Pvt. Ltd.
10.2011 - 12.2013

Site Engineer

Aster Pvt. Ltd.
07.2010 - 09.2011

Quality Engineer

Ircon International Limited

B. Tech - Electrical Engineering

Gautam Buddha Technical University

Some College (No Degree) -

Vocational Training
Vikrant Milind SiddharthaElectrical Engineer