Summary
Overview
Work History
Education
Skills
Certification
Extramuralengagementsandachievements
Languages
Knowledgepurview
Personal Information
Timeline
Generic
Vinod Maheshwar Kore

Vinod Maheshwar Kore

Pune

Summary

Seeking assignment in the domains of Product Management

Engineering professional with 15+ years of experience in project management. A thorough go getter with strong academic foundation, backed by a zeal & passion to excel in the field of Project. Acquired hands-on experience on commercial & Industrial electrical project management. Ability to meets project financial objectives by forecasting requirements; preparing a budget; scheduling expenditures; analyzing variances; initiating corrective actions. An effective communicator with excellent relationship building & interpersonal skills; strong analytical, problem solving & organizational abilities. Knowledge of implementing standard installation, testing & commissioning procedure as per standard requirements. Possess expert skills in problem resolution, planning, monitoring, reporting, resource management, quality, and risk management as well as serving as a reputable change agent. Exceptional skills in prioritizing work and completing multiple project.

Overview

18
18
years of professional experience
1
1
Certification

Work History

CONSULTANT

TATA CONSULTING ENGINEERS LIMITED
Pune
04.2022 - Current
  • Responsible for providing knowledge based technical consultancy to the client for the IT infrastructure project
  • Review the designs of the project and do the analysis and suggest improvement
  • Coordinate with PMC, CONSULTANT and CLIENT to maximise the efficiency of the system, i.e efforts, time and cost
  • Coordinate with the project manager, architect and stake holders to create comprehensive project schedules, ensuring that tasks are properly sequenced and deadlines are met
  • Responsible for developing project plans, including defining objectives, establishing timelines and identifying resource requirements
  • Monitoring progress of projects of various stages to assure completion within the time and cost parameters and effective resource utilization
  • Assign tasks to internal teams and assist with schedule management
  • Responsible for installation, testing and commissioning of Electrical System, ELV system, plumbing system, firefighting system & HVAC system
  • To ensure maximum productivity and quality of work
  • Monitoring construction processes, conducting inspections and ensuring compliance with project specifications and industry standards
  • To ensure that all project deliverables are completed, conduct final walkthroughs, and coordinate the handover of relevant documentation and warranties to clients
  • Projects Completed - 1
  • TCS SP2 Phase 1 2
  • TCS SP2 Phase 2
  • Current project - 1 TCS SIRUSIRI (SIPCOT)

MEP Manager

NARSI & ASSOCIATES
Pune
07.2018 - 08.2021
  • Responsible for planning and design in the area of Mechanical, Electrical and plumbing (MEP) system including developing policies standard, inspection procedure along with prepare, review drawing, specification and cost estimates for the mechanical, Electrical, and Plumbing
  • Role includes the management of the project team to ensure that the day-to-day duties are performed professionally and expeditiously to support the ongoing progress of the project
  • Clash-free MEP Modeling by early-stage clash detection
  • Continually review the contractor’s construction schedule during the progress of site works with regards to MEP services and report to the project Manager on the same
  • In conjunction with the document controller, ensure that the filing/logging of the MEP documentation is undertaken in line with the project handbook and continually monitor the same
  • Review Contractor’s installation method statements
  • Continually review the contractor’s construction schedule during the progress of site works with regards to MEP services and report to the project Director on the same
  • Review Contractor’s shop drawings against the design [tender] drawings for compliance with the design intent and return to PMC with appropriate comments / approval within the specified contractual period
  • Wherever required prepare technical clarifications to the tendered design to suit specific on-site construction and co-ordination issues
  • Monitor and promote health and safety on the site
  • Record and report any breaches to the Project Manager
  • If required stop the construction works if unsafe practices are being followed
  • To review plans and specifications according to the plan
  • To manage to oversee the work of subordinate staff
  • To provide technical advice to staff designer, supervisor, inspector, and contracting service provider, regarding installation and maintenance of MEP System
  • To analyze mechanical, Electrical, and Plumbing engineering problems and formulate solutions
  • To identify problems in design, plan, manage and deliver multiple projects
  • Has to plan, organize the review and evaluate the work of contractors, and others
  • To prepare and deliver effective oral presentations whenever required
  • Projects Completed - 1
  • Wipro (SDB 5) 2
  • Wipro (MB) 3
  • Amdocs (Tower 6)

Project engineer

LITURA ELECTRICAL TECHNOLOGY PVT. LTD.
Pune
07.2010 - 06.2018
  • Provided hands-on management, directing and overseeing a variety of industrial/commercial electrical projects which includes estimation, planning and monitoring of the electrical aspects of electrical projects from conception to completion
  • Responsible for preparing project documents, developing budgets, meeting client requirements, implementing project procedures, and making sure the project is completed on time and within budget
  • Prepared design guidelines which are the written criteria the design team will use to develop the design of the project
  • Analysis of BOQ, SLD, shop drawing of the project
  • By studying Single line diagram, GA diagrams ensure that panel location should be proper Also all panels should be of required spec .and accessories
  • Received and reviewed submittal data from suppliers and manufacturers to ensure complete compliance with all contract documents
  • Created addendums and updated as-built drawings
  • Preparation of cable schedule and quantity of required material
  • Coordinate with PMC, consultants and other venders to clarify final work
  • Keep safety as the top topic for the field crew
  • By studying the electrical drawing, supervise the electrical work and have to ensure that work is done as per project schedule
  • To take Measurement of raceways, cable tray, cables, etc
  • Preparation of Final bill
  • Performed quality checks when a project was finished, to make sure everything worked properly
  • Coordinate with PMC, consultants and other venders to clarify final work
  • Witness on-site piped system pressure test, air conditioning duct leakage testing, Panel testing and other testing that may be required during the first fix works and advise the Project Manager accordingly
  • By studying the electrical drawing, supervise the electrical work and have to ensure that work is done as per project schedule
  • Review and comment on Contractor’s testing and commissioning results and advise the Project Manager accordingly
  • Attend project progress meetings
  • Set up meetings to resolve specific site problems as required to minimize program delay
  • Projects Completed- 1
  • Vodafone 2
  • Schlumberger 3
  • Bny Mellon 4
  • Axa business 5
  • Kohler 6
  • Global Group

Site Engineer

ENVIRO CONTROL ASSOCIATES PVT. LTD.
Pune
07.2006 - 05.2008
  • The main responsibilities included purchasing and negotiations, buyouts, estimating, scope of work including change orders, and project and client communications
  • Managed projects from initial consultation through development of scope, proposal and bid development and project management though close-out; History of record efficiencies
  • Interface daily with multiple contractors, including general contractors, electrical contractors, mechanical contractors
  • Regularly troubleshoot and eliminate Installation and design roadblocks
  • Making Schedule for operation of all electrical and non electrical appliances
  • Closely watch and maintain the standard process of plant working
  • Prepare monthly report of electrical maintenance
  • Maintenance of Electrical Panels of whole electrical system in the plant
  • Maintenance of air blowers, gas compressors, electrical motors, VFDs, street lights, etc
  • Closely watch the progress of work and report to PMC consultants
  • Verify the material and its specifications as per standards
  • Making Schedule for operation of all electrical and non electrical appliances
  • By studying the electrical drawing, supervise the electrical installation
  • Provides electrical power by maintaining electrical equipment and outlets; including energy management system
  • Maintenance of all electrical instruments and electrical system in 115 STP plant
  • Maintenance of panels, motors (induction motors), techno fungi, centrifuge, screen, cooling tower
  • Flow meters, aeration tank

Education

MBA - Finance

Dr. D.Y. Patil Institute of Management
Pune
01.2010

B.E. - Electrical Electronics and Power

SRTM University
Nanded
01.2006

Skills

  • Product development
  • Prioritization techniques
  • KPIs and matrices
  • Project Management
  • Project Scheduling
  • Project Cost Estimation
  • Quality Management
  • Project Forecasting
  • Electrical Installation
  • Management Reporting (MI)
  • Substations
  • Project Billing
  • Project Planning
  • Material Management
  • Safety Procedures
  • Fire Fighting System
  • HVAC System
  • UPS system

Certification

  • Certified in C Programming with A+ grade by Seed InfoTech, Pune
  • Certified in Software Testing with A grade by Seed InfoTech, Pune
  • Certified in Vidya (desktop management) course by APTECH
  • Certified in ELECTRICAL AUTOCAD
  • Certified in MS OFFICE
  • Having License of PWD electrical supervisor

Extramuralengagementsandachievements

  • Won Chess Competition in Management College at inter college level
  • Won Business Quiz Competition in Management College at inter college level
  • Worked as the head of Refreshment Committee at college level
  • Participated in the International Finance Conference in IES Management College, Mumbai

Languages

  • English
  • Marathi
  • Hindi

Knowledgepurview

  • Product development
  • Prioritization techniques
  • KPIs and matrices
  • Project Management
  • Project Scheduling
  • Project Cost Estimation
  • Quality Management
  • Project Forecasting
  • Electrical Installation
  • Management Reporting (MI)
  • Substations
  • Project Billing
  • Project Planning
  • Material Management
  • Safety Procedures
  • Fire Fighting System
  • HVAC System
  • UPS system

Personal Information

  • Pune
  • Mumbai
  • Hyderabad
  • Bangalore

Timeline

CONSULTANT

TATA CONSULTING ENGINEERS LIMITED
04.2022 - Current

MEP Manager

NARSI & ASSOCIATES
07.2018 - 08.2021

Project engineer

LITURA ELECTRICAL TECHNOLOGY PVT. LTD.
07.2010 - 06.2018

Site Engineer

ENVIRO CONTROL ASSOCIATES PVT. LTD.
07.2006 - 05.2008
  • Certified in C Programming with A+ grade by Seed InfoTech, Pune
  • Certified in Software Testing with A grade by Seed InfoTech, Pune
  • Certified in Vidya (desktop management) course by APTECH
  • Certified in ELECTRICAL AUTOCAD
  • Certified in MS OFFICE
  • Having License of PWD electrical supervisor

MBA - Finance

Dr. D.Y. Patil Institute of Management

B.E. - Electrical Electronics and Power

SRTM University
Vinod Maheshwar Kore