Working professional with 8 Years of experience in Oil & Gas , Substation Project. Efficient and focused in proficiency with electrical engineering design and application. Accustomed to leading highly effective multidisciplinary teams to complete projects in alignment with corporate goals.

Overview

8
8
years of professional experience
1
1
Certification

Work History

Senior Engineer Quality

KEC International Ltd.
Chhitorgarh
09.2024 - Current
  • Preparation and submission of Electrical, Quality documents, ITP, Method of Statement, Procedure in line with Project specifications and standards.

  • Provided technical support for end users experiencing difficulty with applications or systems.
  • Surveyed sites, collected measurements, and assessed project conditions.

Assistant Manager E&I Quality

Tata Project Limited
Pachpadra
10.2022 - 09.2024
  • Preparation and submission of E&I, Quality documents, ITP, Method of Statement, and Procedure in line with Project specifications and standards.
  • Coordinate the resources, liaise with construction management, and supervise to ensure adequate inspection coverage of all E&I, ongoing construction, and completion of inspection activities.
  • Specification, P&ID, SLD, ILD, Hook Up, GA drawings, and other attachments prior to installation. Monitor the subcontractor's performance for compliance with project quality requirements.
  • Identify the non-confirming activity during the project execution and raise the internal NCRs, ensuring their proper closure in time.
  • Responsible for E&I, punch point, and hold point clearance.
  • Find out the root cause for the non-conformances and implement and monitor necessary corrective actions effectively.

Electrical Engineer

SR Electricals, Vadodara
Vadodara
02.2022 - 06.2022
  • Installation of Electrical Panel, Electrical Lighting work as per approved drawings, ensuring requirements and as per standard.
  • Collaborated seamlessly with project teams, site teams, and operation teams to build a successful solution.
  • Interfaced with site supervisors for day-to-day activities, quality of work, and stock positions.
  • Preparing execution schedule, manpower, and material plan.

Electrical Engineer-1

Certification Engineer International Ltd, Vadodara
Dahej
08.2018 - 01.2022
  • Preparation/Review, approval and implementation of Site Quality Plan (QP), Method statements, Inspection & Test plans (ITP) in accordance with applicable standards & specifications for Electrical and Instrumentation.
  • Pre dispatch/Pre shipment TPI work for Electricals Equipment, LV & MV Motor, Transformer/HT cable, Street Light, Distribution board, Manual Call Point etc. as per ITP, GA & datasheet.
  • Pre-dispatch/Pre-shipment TPI work for Electrical Equipment, LV & MV Motor, Transformer, LT/HT cable, Street Light, Distribution board, Manual Call Point, etc. As per ITP, GA, and datasheet.
  • Witnessed activities of FAT and SAT for electrical items like transformers, panels, motors, and cables.
  • Inspection activities for installation of electrical and instrument equipment as per standards and specifications.
  • Supervision of working labor to ensure strict conformance to methods, quality, and safety.

Project Engineer

Icon Control Pvt Ltd, New Delhi
Dahej
06.2016 - 07.2018
  • Developed project plans, budgets and timelines to ensure successful completion of projects.
  • Monitoring of Project Schedule and identifying, at all times, any area of concern (critical path, clashes, early start).
  • Managed resources such as equipment, materials, personnel and subcontractors to achieve project goals.
  • Provided technical advice and guidance on design concepts and construction methods.
  • Reviewed blueprints, drawings and specifications for accuracy and completeness prior to construction commencement.
  • Coordinated meetings with stakeholders including clients, architects, engineers, subcontractors and other parties involved in the project.

Education

B.tech - Electrical Engineering

Global Institute of Technology
Jaipur
05-2016

Skills

  • AutoCAD
  • ETAP
  • Microsoft Excel
  • Microsoft office

Languages

English
Intermediate (B1)
B1
Hindi
Intermediate (B1)
B1
Gujarati
Elementary (A2)
A2

Certification

  • Internal Auditor ISO 9001:2015

Timeline

Senior Engineer Quality

KEC International Ltd.
09.2024 - Current

Assistant Manager E&I Quality

Tata Project Limited
10.2022 - 09.2024

Electrical Engineer

SR Electricals, Vadodara
02.2022 - 06.2022

Electrical Engineer-1

Certification Engineer International Ltd, Vadodara
08.2018 - 01.2022

Project Engineer

Icon Control Pvt Ltd, New Delhi
06.2016 - 07.2018

B.tech - Electrical Engineering

Global Institute of Technology
Vinod Kumar