Summary
Overview
Work History
Education
Skills
Accomplishments
Affiliations
Languages
Target Job
Industry
Projects Executed
Trainings Attended
Passport Expiry
Personal Information
Timeline
Generic

VIPIN MAHESHWARI

Bengaluru

Summary

An astute and multi-tasking Civil project management professional offering 17+ years of qualitative experience in Project Lifecycle Management, Execution, construction management, and project planning/monitoring in Elevated Metro Rail, Road Tunneling (NATM), LRT, National Highways (BOT, DBFOT, BOQ & FIDIC) construction, Expressways, structures in India and abroad. An Executive Professional with excellence in gathering and understanding the requirements of projects and other multiple stakeholders (at strategic and tactical levels), followed by translation into project specifications as well as provisioning of suitable solutions. Proficient in managing the entire construction project lifecycle right from development to delivery; completed capital projects along with estimation & budget preparation. Forward-focused Professional with exposure in swiftly completing all project tasks with competent cross-functional skills and ensuring on-time deliverables within project pre-set parameters. Expertise in the smooth integration of the design of structures, and execution of construction activities of metro rail, bridges, road tunnels, and highway constructions transfer into the operational phase while working closely with internal & external advisors and client representatives. Impeccable record of building high-performance teams, implementing continuous improvement programs & partnering with multiple global stakeholders. A multitasking professional, who has believed in cross-cultural environments toward growth and success in the organization.

Overview

18
18
years of professional experience

Work History

AEE (Assistant Executive Engineer)

BMRC Ltd. (India)
- Current
  • Overall responsible for elevated stations (3 Nos.) works completion from the foundation up to roof level and handed over to finishing contractors, additionally looking for Viaduct (RCC work, spine segments & prestressing) Road works, station development as per the GFC and specifications
  • Supervision for construction of RCC portals (D-2m & L-35m approx.) at concourse, track & platform level, ensuring works as per quality parameters & safety requirements
  • Monitoring/site planning for girder launching works of PSC Double-T girders at concourse/platform level, post-tensioning I- girders at track level and bearing alignment, and installations
  • Monitoring pre-fab roof structural steel works site planning, erection, roof sheeting
  • Monitoring RE wall works for the ramp (180 RM) inside the station carriageway
  • Ensuring project quality procedures, and safety continually monitoring these procedures for possible improvements
  • Assisting senior officials with checking/reviews of method statements, formworks design, site proposals, ITP, and design reports submitted by contractors
  • Reviewing GFCs/shop drawings and making modifications as & when required in coordination with the design team as per the site
  • Monitoring works progress as per the IWP/monthly rolling program at site levels and notifying bottlenecks/delays during work progress review meetings
  • Comprehensive reviews on the work done by the contractor and planning remedial measures in case key dates are likely to be not achieved
  • Maintaining resources, DPR, and progress pictorial records by using computer-aided tools
  • Coordination with interface contractors for their access and local authorities for utilities, and approvals for smooth construction
  • Involved in documentation & handing over of CMRS inspection records & guiding juniors for documentation as required.

Deputy Manager Construction

GMRC Ltd. (Previously known as MEGA)
01.2017 - 03.2019
  • As an In-charge monitored overall execution works for 3-Portal & 3-Cantilever type elevated metro rail stations & Metro Depot works
  • Monitored construction progress of pile foundations and pile caps, RCC piers (Ht.=12/13m), pier cap, bearing pedestals, and installation of POT PTFE/Elastomeric bearings
  • Monitored construction of balanced cantilever pier arms and RCC portals (L-20/29 m) at concourse, track, and platform level (2-stage post-tensioning) with in-situ deck slabs CL/PL/TL, diaphragms, closer walls, parapet walls, entry/exit, and UG tanks
  • Reviewed temporary formworks shop drawings and designs and worked out shuttering materials for works
  • Monitored overall construction phases of PSC- I/RCC Girders (11.5m- 15.5m) Pre/Post tension at the casting yard
  • Monitored/checked PEB/Roof structure fabrication & erection at site & yard, including all field test checks
  • Interfaced with System, E&M, lifts/Escalator vendors & monitor station amenities finishing works
  • Developed DPR, weekly reports, pictorials, bar charts, and forthcoming activities for management
  • Monitored progress with baseline program, weekly look ahead, KDs, critical review on bottlenecks/delays
  • Checked and processed Viaduct (6.14 Km) IPCs as per BOQ, rate analysis, EOT, assisted in variation, issued ongoing works certificate, and vendor approval
  • Assisted senior officials in the management and work distribution of a team of consultants for the supervision and compliance of the works
  • Coordination with consultants, R & R team, and local authorities for utilities, and approvals for a smooth construction.

Civil Engineer Structures

CDM Smith Inc.
07.2013 - 12.2016
  • Handled overall construction supervision of Metro Light Rail Transit (LRT), 1.106 Km long
  • (41 Units/cut & cover)
  • Checked and monitored LRT excavation (cut & cover, -22m from QNHD), dewatering/deep well systems
  • Executed setting out, leveling, geophysical test, waterproofing, base slab, walls (1.2-1.5m), rebar works, formworks (DOKA), installation of joints at base and walls, cross conduits, waterproofing and backfilling on sides and top, tunnel grouting
  • Monitored construction of ventilation shaft, egress stair, pump room, retention tank & utility compound
  • Administered Micro tunneling (Ø2.5-3m, L=1.18 km) shaft construction (Ø11m), dewatering, concrete basement, TMB installation, backup plants (discharge/feeder, slurry tanks, DG’s) on ground
  • Managed initial and main drive including survey, boring and jacking pipe installation, reception, and recovery shaft excavation, basement, guide rail installation & TBM removal
  • Managed interchanges with 3-grade levels from base slab to top slab, PSC-U/I Girders Pre-stressing, profiling, concreting, grouting, girders shifting and erections, secant Piles with guide walls, utility structures as per the GFC drawings
  • Attended RFIs & Witness field tests, joint inspection with contractor’s QC Engineers as per ITPs; ensured works as per correct materials, workmanship, PQP & QCS-2010
  • Checked shop drawings, BBS, formworks design, temporary works, geotechnical reports, inspection reports, MT, technical queries (TQ) and assisted reporting official/ARE in technical observations/queries
  • Issued relevant correspondence noncompliance report (NCR/surveillance) for quality and safety issues to the contractor as and when required
  • Monitored site work progress at micro-level & weekly look ahead program basis, notified & highlighted shortfalls/bottlenecks
  • Observed site safety & toolbox sessions, and ensured that all health & safety regulations met the contractual provisions.

Associate Manager Structures

GMR Highways
07.2011 - 07.2013
  • Executed and handled the construction of a 30 km stretch (structure/road works) for partial COD of the project in stipulated time and managed contractors with 250–300 manpower
  • Constructed and supervised major/minor bridges (PSC/RCC beams), grade separators, VUP/PUPs, culverts, reinforced earth Walls casting & erection (3 Km.), witness NDT for bridges, rehabilitation/restoration of existing bridges as per GFC drawings & IRC codes
  • Monitored Major Bridge (S-4X17.1 m) with Well foundations (Ø 6.15 m) well shifts, tilts & sinking, bottom plug, sand filling, top plug and well cap concreting
  • First Road Tunnel construction in Karnataka; oversaw construction of Twin tube Road Tunnels-300 mts
  • In length approx
  • (with zones portal/tunnel/rail) & artificial portals B/S executed with NATM (New Austrian Tunneling Method)
  • Executed road tunnel works such as alignment, setting out, profiling marking, drilling, loading, excavation with cut/cover & drill/control blast, Centre heading/benching, Initial SFRS (Shot Crete), mucking, rock bolting (Ø25mm), for polling, lagging fixing, rib erections (ISMB-500), Gantry works, CC lining (250 mm thick) with gantry
  • Checked shop drawings, structures BBS, temporary staging, commented on method statements, contractor’s submittals, as per Specification and contractual requirements, ensured works quality and safety parameters
  • Coordination with client (NHAI), local authorities for utilities, consultants for approvals and ease of construction.

Assistant Bridge Engineer

Intercontinental Consultants and Technocrats Pvt. Ltd. (ICT)
06.2009 - 07.2011
  • Supervised ROB, PSC post-tension I-girders=21M (12T13), profiling, rebar, formworks, concreting, and stressing works
  • Casting of diaphragms, deck slab& POT PTFE bearings installation, RE panel erection with ramp
  • Executed site surveying and supervision of causeways, underpasses, VUP/PUPs, minor bridges, Interchanges (Span-11.5x5.5), Flexible/rigid pavement works including GSB, WMM, DBM service roads, surface drainage, road furniture’s as per IRC & MoRTH
  • Rehabilited/repaired old bridges for hand railing, scoured plaster, expansion joints, approach, cleaning & replacement of existing bearings, damaged wearing coat
  • Prepared DPR, assisted in MPR, and attended progress review meetings with contractors and client.

Site Engineer Structures

Leighton-Contractors India Pvt. Ltd.
11.2007 - 05.2009
  • Conducted execution operations in a locally dominated area and solved local problems faced during the process of building structures
  • Executed minor bridges(multicellular) -06 No’s, underpass-1, culverts, retaining walls, expansion joints, curtain walls, crash barriers, aprons, wing walls & RE wall with geo-strips, road earthworks
  • Performed execution of major bridge with pile foundation (52 No’s) by DMC with tripod/rig (Ø1.2m, 25M), pile load test, pile caps
  • Engaged allocated resources labor/materials for the site, machinery at site & handled 70-90 workers & maintained MB.

Site Engineer Structures

DS Constructions Ltd. (Raipur Exp. Ltd.)
12.2005 - 11.2007
  • As a site engineer (structures) capably executed Bridges, Underpasses, pipe and box culverts, DLC & PQC work and assisted seniors in the completion of tunnel work(L=50M), ROB works before partial COD
  • Implemented crusher plant/RMC plant foundations and staff quarters building in the camp area.

Education

B.E. (Civil) -

Nagpur University
Wardha, Maharashtra
01.2005

Skills

  • Site Execution

  • Planning & Management

  • Client Relationship Management

  • Requirement Gathering

  • Project Management/Construction Management

  • Strategic planning & implementation

  • Quality Control Management

  • Team Management & Leadership

  • Budgeting/Cost Optimization & Control

  • Planning/Scheduling

  • Stakeholder Management

  • MS Project

  • AutoCAD

  • MS Office

Accomplishments

  • Completion of the First Trial run of GMRCL in priority reach (6.4 km Approx.) appreciation with prize money
  • Completion of 30 Km Road stretch for COD (Hungund-Hospet, NH)

Affiliations

  • IRC (Indian Road Congress)
  • IAENG, 181898, Hong Kong

Languages

Hindi
English
Marathi

Target Job

Senior-level assignments in Construction/Project Management

Industry

Construction/Infrastructure

Projects Executed

  • RV Road – Bommasandra Corridor (BMRCL), 08/2019, Present, INR 5744 Crores, Assistant Executive Engineer (AEE), Project includes Standard Gauge (1435 mm) Rails, Viaduct consisting of 'Box' shaped girders, pile/open foundation, and segmental construction (Double Decker), Car size- 2.9 m, 21.64 (DMC) & 21.34 (TC), Total Length = 18.84 Km out of which 6.34 Km (Approx.) from RV Road to CSB (Metro viaduct & Road cum rail Flyover Bridge)
  • Gujarat Metro Rail Corporation Ltd. (Phase-1, Priority Reach-1), 01/2017, 03/2019, INR 10,773 Crores, Deputy Manager (Construction), Project includes Standard Gauge (1435 mm) Rails, Viaduct consisting of 'Box' shaped girders, pile/open foundation segmental construction, By tunneling using TBM and stations by NATM, Car size- 2.9 m, 21.64 (DMC) & 21.34 (TC), Total Length = 39.259 Km (NS/EW) Phase-I, out of which 6.1 Km underground, Elevated & underground stations – 32 Nos. out of which 4 UG stations
  • Lusail Expressway Project (Doha, Qatar), 07/2013, 12/2016, 4,998,000,000 QR (1.369 billion USD), Structure/Civil Engineer, Project includes 2 Marine bridges, 6 tunnels, 5 underpasses, 2 flyovers, PSC Girders 3012 Nos., Multi-level Interchanges with 4 lanes in each direction, Light Rail Transit (LRT) & connect to Doha Metro’s Red Line North Length of 1.106 Km, Strom water network with two pump stations and underground tanks, 2 outfalls, foul water, electrical utilities, surveillance system, and tele-networks, Micro tunneling (Ø 2.5-3 M, approx. 4 Km in length with 11 shafts) for drainage/utility purpose
  • 4-Laning of Hungund – Hospet Section, NH- 13, 07/2011, 07/2013, INR 946 Crores, Associate Manager (Structures), Project includes 3 Toll Plazas, 14 major & 88 minor junctions, 1 Major bridge (with well foundation & RCC Girders span 17m), 44 minor bridges, 8 VUP/PUP, 2 ROB, 2 Flyovers, 142 (Box/Pipe) culverts, 1 Road Twin Tube Tunnel (RHS-310m, LHS-377m, clear Dia. 14.5m), Rehabilitation & Restoration of Old Tungabhadra Bridge, 86.305 Km 4-laning stretch and 12.7 Km 6-laning stretches, crust of 650 mm with a width of -8.5 m for each carriageway
  • Rehabilitation and Upgrading of Western Transport Corridor NH-4, 06/2009, 07/2011, INR 207.56 Crores, Assistant Bridge Engineer (Structures), Project includes Flexible pavement of 77 km of 610 mm crust thickness and pavement width of 8.75 m for each carriageway, 7 interchanges, 1 ROB (with PSC girders with length 21 m, pot PTFE Bearings) corresponding with RE wall of length - 0.8 Km, 102 causeways and 21 track underpasses, 1 Toll Plaza, drainage system, and rehabilitation of old river bridge (HariHara River Bridge)
  • 4-Laning of Agra –Bharatpur section, NH- 11, 11/2007, 05/2009, INR 220.00 Crores, Site Engineer (Structures), Project includes Flexible pavement of length 45 km with crust of 610 mm with width -8.5 m for each carriageway, 7 box culverts, 1 underpass, 1 toll plaza, drainage system & RE wall with length - 1.2 Km
  • 4-planning & Upgrading of N.H-6, 09/2005, 11/2007, INR 260.00 Crores, Site Engineer (Structures), Project includes Flexible pavement of 44 km of 600 mm crust thickness and pavement width of 8.5 m for each carriageway, 6 minor bridges, 7 VUP, 1 Major bridge, 1 ROB, and retaining wall -1.1 Km, 1 Flyover, 24 (HPC/SBC) culverts

Trainings Attended

  • Primavera (P6)
  • Safety training on Execution of Routine/Heavy crane lifts
  • AutoCAD

Passport Expiry

08/16/28

Personal Information

  • Passport Number: S6141153
  • Date of Birth: 08/29/81
  • Marital Status: Married

Timeline

Deputy Manager Construction

GMRC Ltd. (Previously known as MEGA)
01.2017 - 03.2019

Civil Engineer Structures

CDM Smith Inc.
07.2013 - 12.2016

Associate Manager Structures

GMR Highways
07.2011 - 07.2013

Assistant Bridge Engineer

Intercontinental Consultants and Technocrats Pvt. Ltd. (ICT)
06.2009 - 07.2011

Site Engineer Structures

Leighton-Contractors India Pvt. Ltd.
11.2007 - 05.2009

Site Engineer Structures

DS Constructions Ltd. (Raipur Exp. Ltd.)
12.2005 - 11.2007

AEE (Assistant Executive Engineer)

BMRC Ltd. (India)
- Current

B.E. (Civil) -

Nagpur University
VIPIN MAHESHWARI